nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A CAD/ CAM system for vector-based layered manufacturing systems
|
Joneja, Ajay |
|
2000 |
|
5 |
p. 388-400 |
artikel |
2 |
A computer-aided system for the optimization of the accuracy of the wire electro-discharge machining process
|
Sanchez, Jose Antonio |
|
2004 |
|
5 |
p. 413-420 |
artikel |
3 |
A conceptual framework for shopfloor production activity control
|
Huguet, P. |
|
1995 |
|
5 |
p. 357-369 |
artikel |
4 |
Action research as a vehicle for validating MISD methodologies
|
Grant, Delvin |
|
1996 |
|
5 |
p. 381-391 |
artikel |
5 |
A distributed evolutionary simulation optimization approach for the configuration of multiproduct kanban systems
|
Paris, Jean-Luc |
|
2001 |
|
5 |
p. 421-430 |
artikel |
6 |
A generic distributed architecture for nonconformance diagnosing systems
|
Liu, Wei |
|
2004 |
|
5 |
p. 467-477 |
artikel |
7 |
A group technology model to assess consolidation and reconfiguration of multiple industrial operations—a shared manufacturing solution
|
Billo, Richard E. |
|
1993 |
|
5 |
p. 311-322 |
artikel |
8 |
A heterogeneous, active database architecture for engineering data management
|
Urban, S. D. |
|
1994 |
|
5 |
p. 276-293 |
artikel |
9 |
Alternative approaches to sequencing robot moves for PCB assembly
|
Mettala, Eric G. |
|
1989 |
|
5 |
p. 243-256 |
artikel |
10 |
A mathematical modelling approach for the process of part orientation in batch assembly automation
|
LOGENDRAN, RASARATNAM |
|
1997 |
|
5 |
p. 335-344 |
artikel |
11 |
A modelling and optimization procedure for networks of firms
|
Hammami, A. |
|
2005 |
|
5 |
p. 367-375 |
artikel |
12 |
An adaptive genetic assembly-sequence planner
|
Chen, Shiang-Fong |
|
2001 |
|
5 |
p. 489-500 |
artikel |
13 |
An approach to CIM system development whereby manufacturing people can design and build their own CIM systems
|
Young, Robert E. |
|
1991 |
|
5 |
p. 288-299 |
artikel |
14 |
An architecture of a multi-model system for planning and scheduling
|
ARTIBA, A. |
|
1997 |
|
5 |
p. 380-393 |
artikel |
15 |
An automatic system designed for the monitoring of cutting tools using real-time control concepts and fuzzy approaches
|
Ip, Ralph W. L. |
|
2002 |
|
5 |
p. 379-393 |
artikel |
16 |
A neural network based fuzzy learning controller and its experimental application to milling
|
Liu, Yanming |
|
2000 |
|
5 |
p. 461-466 |
artikel |
17 |
A new multiobjective genetic algorithm with heterogeneous population for solving flowshop scheduling problems
|
Tamura, Hiroyuki |
|
2007 |
|
5 |
p. 465-477 |
artikel |
18 |
An extended model of ATP to increase flexibility of delivery
|
Zschorn, L. |
|
2006 |
|
5 |
p. 434-442 |
artikel |
19 |
An independent description of standard and repetitive parts for CAD systems
|
Loop, H. |
|
1991 |
|
5 |
p. 265-278 |
artikel |
20 |
An integration architecture for process manufacturing systems
|
Wang, Chengen |
|
2002 |
|
5 |
p. 413-426 |
artikel |
21 |
An intelligent decision system for a modern manufacturing system
|
Wang, Kuo-Shong |
|
1993 |
|
5 |
p. 281-292 |
artikel |
22 |
An object-oriented analysis and design method for shop floor control systems
|
LIU, CHIH-MING |
|
1998 |
|
5 |
p. 379-400 |
artikel |
23 |
An object-oriented modelling framework for automated manufacturing system
|
PARK, TEA Y. |
|
1997 |
|
5 |
p. 324-334 |
artikel |
24 |
A part-feature recognition system for rotational parts—non-turning features
|
Li, Rong-Kwei |
|
1989 |
|
5 |
p. 257-267 |
artikel |
25 |
A Petri net approach for modelling controls of a computer-integrated assembly cell
|
D'Souza, Kelwyn A. |
|
1993 |
|
5 |
p. 302-310 |
artikel |
26 |
Application of IDEF0, IDEF3 and UML methodologies in the creation of information models
|
Dorador, J. M. |
|
2000 |
|
5 |
p. 430-445 |
artikel |
27 |
Application of object-oriented design concepts in CIM systems layout
|
Barakat, Q. |
|
1995 |
|
5 |
p. 315-326 |
artikel |
28 |
Application of statistical process control in injection mould manufacturing
|
Cao, J. |
|
2007 |
|
5 |
p. 436-451 |
artikel |
29 |
Approach to CIM in NIPPONDENSO Kota plant
|
Sakakibara, M. |
|
1991 |
|
5 |
p. 279-287 |
artikel |
30 |
A psycho-clonal-algorithm-based approach to the solve operation sequencing problem in a CAPP environment
|
Dashora, Y. |
|
2008 |
|
5 |
p. 510-525 |
artikel |
31 |
A Review of: “Communication Systems for Industrial Automation”. By MICHAEL G. RODD and FARZIN DERAVI. (Prentice Hall, 1989) [Pp. 119] £30.00. Level: professional and management.
|
Tilley, Kevin J. |
|
1990 |
|
5 |
p. 328 |
artikel |
32 |
A review of: “Design for Manufacture: Strategies, Principles and Techniques.” Edited by JOHN CORBETT, MIKE DOONER, JOHN MELEKA and CHRISTOPHER PYM. (Addison Wesley, 1991) [Pp. 357] £19.95. Level: Graduate/research
|
Williams, David J. |
|
1991 |
|
5 |
p. 321-322 |
artikel |
33 |
A Review of: “Efficient Beyond Imagining: CIM and its Applications for Today's Industry”. By P. W. MOIR (Ellis Horwood, 1989) [Pp. 118] £22.50. Level: professional engineer/manager.
|
Rogers, Paul |
|
1990 |
|
5 |
p. 330-331 |
artikel |
34 |
A review of: “Intelligent Robotics”. By MARK H. LEE. (Open University Press, 1989) [Pp. 322.] Paperback, £16.00; hardback, £35.00. Scope: textbook. Level: postgraduate/industrial researcher.
|
Williams, David J. |
|
1989 |
|
5 |
p. 298 |
artikel |
35 |
A Review of: “Manufacturing Planning and Control Systems”. By T. E. VOLLMAN, W. L. BERRY and D. C. WHYBARK (Irwin, 2nd edition 1988) [Pp. 904] £28.75. Level: advanced undergraduate/postgraduate/professional.
|
Lagbdimos, Thanos G. |
|
1990 |
|
5 |
p. 329-330 |
artikel |
36 |
A Review of: “MAP and TOP Communications: Standards and Applications”. By A. Valenzano, C. Demartini and L. Ciminiera (Addison-Wesley, 1992), ISBN 0-201-41665-4 [Pp. 541] £26-95. Market: professional
|
Tiiley, Kevin J. |
|
1994 |
|
5 |
p. 320 |
artikel |
37 |
A Review of: “MAP and TOP Communications: Standards and Applications”. By A. Valenzano, C. Demartini and L. Ciminiera (Addison-Wesley, 1992), ISBN 0-201-41665-4 [Pp. 541] £26-95. Market: professional
|
Tiiley, Kevin J. |
|
1994 |
|
5 |
p. 320-321 |
artikel |
38 |
A Review of:“The Fractal Company. A Revolution in Corporate Culture.” Edited by H.J. WARNECKE (Springer-Verlag, 1993). ISBN 3-540-56537-X/O-387-56537-X [Pp. 228]. Dm58.OO. Market: factory managers.
|
Oliver, Nick |
|
1995 |
|
5 |
p. 391-392 |
artikel |
39 |
A Review of: “The Fractal Company. A Revolution in Corporate Culture”. Edited by H.J. WARNECKE (Springer-Verlag, 1993). ISBN 3-540-56537-X/0-387-56537-X [Pp. 228]. Dm58·00. Market: factory managers.
|
Hitomi, Katsundo |
|
1995 |
|
5 |
p. 391 |
artikel |
40 |
A review of: “Total Design.” By STUART PUGH. (Addison Wesley, 1991) [Pp. 278] Paperback, £16.95. Level: Designer/design lecturer
|
Backhouse, Christopher J. |
|
1991 |
|
5 |
p. 321 |
artikel |
41 |
A scalable e-engineering technology for network-based concurrent engineering in electronics
|
Graves, RJ |
|
2005 |
|
5 |
p. 395-401 |
artikel |
42 |
A shift from CIM to CHIM
|
Sun, Hongyi |
|
1999 |
|
5 |
p. 461-469 |
artikel |
43 |
A shop floor controller class for computer-integrated manufacturing
|
Smith, Jeffrey S. |
|
1995 |
|
5 |
p. 327-339 |
artikel |
44 |
Assessing the necessity of enterprise pre-feasibility and feasibility studies in enterprise integration change
|
UPPINGTON, GREGORY |
|
1998 |
|
5 |
p. 430-447 |
artikel |
45 |
A technique for the independent-axis calibration of robot manipulators with experimental verification
|
Sultan, Ibrahim A. |
|
2001 |
|
5 |
p. 501-512 |
artikel |
46 |
A three-dimensional configuration-space method for 5-axis tessellated surface machining
|
Lu, J. |
|
2008 |
|
5 |
p. 550-568 |
artikel |
47 |
A tool to support the shared understanding of manufacturing systems organization in innovation processes
|
Soares, Antonio Lucas |
|
2002 |
|
5 |
p. 394-412 |
artikel |
48 |
Automating probe selection planning for inspection on measuring machine and part setup a coordinate
|
ZIEMIAN, C. W. |
|
1998 |
|
5 |
p. 448-460 |
artikel |
49 |
Autonomous Production Systems in virtual enterprises
|
Carvalho, JDA |
|
2005 |
|
5 |
p. 357-366 |
artikel |
50 |
A visual modelling language for EXPRESS schema
|
Koonce, David A. |
|
2001 |
|
5 |
p. 457-472 |
artikel |
51 |
Book review
|
|
|
1996 |
|
5 |
p. 417-418 |
artikel |
52 |
Bridging the gap between volume and variety oriented production systems for the automotive industry
|
England, Dean M. |
|
2005 |
|
5 |
p. 408-417 |
artikel |
53 |
Buffer sizing in manufacturing production systems with complex routings
|
Lee, Shine-Der |
|
2002 |
|
5 |
p. 440-452 |
artikel |
54 |
Challenges in design and manufacturing
|
Wang, L. |
|
2006 |
|
5 |
p. 409-410 |
artikel |
55 |
CIM—a manufacturing paradigm
|
Thomson, Vince |
|
1989 |
|
5 |
p. 290-297 |
artikel |
56 |
Computer-aided inspection of form of a cutter with an indeterminate axis
|
Menon, S. R. |
|
1994 |
|
5 |
p. 294-306 |
artikel |
57 |
Computer-aided part program segmentation and reconstruction for minimization of machine tool residence time
|
Khan, W. A. |
|
1991 |
|
5 |
p. 300-314 |
artikel |
58 |
Computers in industry: Diebold's view from mid-century
|
McKay, Kenneth N. |
|
2000 |
|
5 |
p. 467-471 |
artikel |
59 |
Concept definition of a logistics standard interface for CIM implementations
|
Gobel, Karl-Josef |
|
1990 |
|
5 |
p. 289-298 |
artikel |
60 |
Concurrent engineering integrating people, organization and technology diagnostic model
|
DUFFY, VINCENT G. |
|
1998 |
|
5 |
p. 461-474 |
artikel |
61 |
Cooperative planning in dynamic supply chains
|
Azevedo, AL |
|
2005 |
|
5 |
p. 350-356 |
artikel |
62 |
Decomposition approach for a problem of lot-sizing and sequencing under uncertainties
|
Dolgui, A. |
|
2005 |
|
5 |
p. 376-385 |
artikel |
63 |
Design and implementation of an agent-based shop floor control system using Windows-DNA
|
unver, H. Ozgur |
|
2002 |
|
5 |
p. 427-439 |
artikel |
64 |
Design of a manufacturing knowledge model
|
Guerra-Zubiaga, D. A. |
|
2008 |
|
5 |
p. 526-539 |
artikel |
65 |
Developing silicon intellectual property E-trade mechanisms for system on chip design and integration
|
Trappey, C. V. |
|
2007 |
|
5 |
p. 423-435 |
artikel |
66 |
Developing simulation as a desktop resource
|
McNally, Pat |
|
2004 |
|
5 |
p. 435-450 |
artikel |
67 |
Development of an integrated methodology for enterprise engineering
|
Kim, Cheol-Han |
|
2001 |
|
5 |
p. 473-488 |
artikel |
68 |
Development of a robot control method for curved seal extrusion for high productivity in an advanced Toyota production system
|
Sakai, H. |
|
2007 |
|
5 |
p. 486-496 |
artikel |
69 |
Development of a system framework for the computer-integrated manufacturing execution system: a distributed object-oriented approach
|
Cheng, Fan-Tien |
|
1999 |
|
5 |
p. 384-402 |
artikel |
70 |
Development of intelligent monitoring and optimization of cutting process for CNC turning
|
Moriwaki, T. |
|
2006 |
|
5 |
p. 473-480 |
artikel |
71 |
Distributed business process coordination: a functionally oriented infrastructure
|
Nunes, A |
|
2005 |
|
5 |
p. 418-426 |
artikel |
72 |
Distributed manipulation environment—(a transputer-based distributed robotic system)
|
Naghdy, F. |
|
1989 |
|
5 |
p. 281-289 |
artikel |
73 |
Distributed modelling and simulation of supply chains
|
Mertins, K. |
|
2005 |
|
5 |
p. 342-349 |
artikel |
74 |
Editorial
|
Williams, David J. |
|
1990 |
|
5 |
p. 273-274 |
artikel |
75 |
Editorial
|
|
|
1997 |
|
5 |
p. 313 |
artikel |
76 |
Editorial
|
Williams, David J. |
|
1999 |
|
5 |
p. 383 |
artikel |
77 |
Editorial
|
Ferreira, Joao Jose Pinto |
|
2005 |
|
5 |
p. 341 |
artikel |
78 |
Editorial
|
Nagalingam, Sev |
|
2007 |
|
5 |
p. 411-412 |
artikel |
79 |
Editorial
|
Chryssolouris, George |
|
1989 |
|
5 |
p. 241-242 |
artikel |
80 |
Efficient sampling for computer vision roundness inspection
|
CHEN, CHIE-BEIN |
|
1997 |
|
5 |
p. 346-359 |
artikel |
81 |
Embedding machining features in function blocks for distributed process planning
|
Wang, L. |
|
2006 |
|
5 |
p. 443-452 |
artikel |
82 |
Event graph modelling of automated sorting and buffering system
|
Choi, B. K. |
|
1996 |
|
5 |
p. 369-380 |
artikel |
83 |
Genetic algorithm approach to job shop scheduling and its use in real-time cases
|
Zhiming, Wu |
|
2000 |
|
5 |
p. 422-429 |
artikel |
84 |
Geometric feature recognition: coping with the complexity and infinite variety of features
|
Yuen, C. F. |
|
1999 |
|
5 |
p. 439-452 |
artikel |
85 |
Global shape information modelling and classification of 2D workpieces
|
Wu, M. C. |
|
1994 |
|
5 |
p. 261-275 |
artikel |
86 |
Graphical process diagrams ion—views and diagrams
|
Mandel, Kostia |
|
1990 |
|
5 |
p. 314-327 |
artikel |
87 |
Implementation of an auction-based distributed scheduling model for a dynamic job shop environment
|
Dewan, Pooja |
|
2001 |
|
5 |
p. 446-456 |
artikel |
88 |
Integration framework of process planning based on resource independent operation summary to support collaborative manufacturing
|
Kulvatunyou, Boonserm |
|
2004 |
|
5 |
p. 377-393 |
artikel |
89 |
Intelligent adaptive control in milling processes
|
Liu, Yanming |
|
1999 |
|
5 |
p. 453-460 |
artikel |
90 |
Investigation of cutting condition monitoring by visual measurement of surface texture parameters
|
Chen, F. L. |
|
1994 |
|
5 |
p. 307-319 |
artikel |
91 |
Investigation of PVM for the emulation and simulation of a distributed CIM workflow system
|
Kim, Chang-Ouk |
|
2000 |
|
5 |
p. 401-409 |
artikel |
92 |
Least cost tolerance allocation and bicriteria extension
|
Kim, Chae-Bogk |
|
1999 |
|
5 |
p. 418-426 |
artikel |
93 |
Machine performance monitoring and proactive maintenance in computer-integrated manufacturing: review and perspective
|
Lee, Jay |
|
1995 |
|
5 |
p. 370-380 |
artikel |
94 |
Machine vision integration and information support: methods, models and tools
|
Edwards, J. |
|
1993 |
|
5 |
p. 323-334 |
artikel |
95 |
Manufacturing systems engineering: the concept, its context and the state of the art
|
Hitomi, Katsundo |
|
1990 |
|
5 |
p. 275-288 |
artikel |
96 |
Metal foams for structural applications: design and manufacturing
|
Barletta, M. |
|
2007 |
|
5 |
p. 497-504 |
artikel |
97 |
Model-based control of a hexapod with linear direct drives
|
Denkena, B. |
|
2006 |
|
5 |
p. 463-472 |
artikel |
98 |
Modelling and performance characterization of vision-assisted robotic cell for printed circuit board assembly
|
Cheraghi, S. Hossein |
|
1995 |
|
5 |
p. 381-390 |
artikel |
99 |
Modelling and simulation of a virtual manufacturing enterprise
|
Ben-Arieh, D. |
|
2008 |
|
5 |
p. 495-509 |
artikel |
100 |
Modelling for cooperative multi-team-based design optimization
|
Li, S. |
|
2006 |
|
5 |
p. 411-422 |
artikel |
101 |
Modelling of distributed control for repetitive production flow prototyping
|
Skołud, B. |
|
2005 |
|
5 |
p. 386-394 |
artikel |
102 |
Object oriented modelling and design of reconfigurable conveyors in flexible assembly systems
|
HO, JOHN K. L. |
|
1997 |
|
5 |
p. 360-379 |
artikel |
103 |
Object-oriented modelling of a feature-based reverse engineering system
|
Motavalli, Saeid |
|
1996 |
|
5 |
p. 354-368 |
artikel |
104 |
Object-process analysis of computer integrated manufacturing documentation and inspection functions
|
Dori, Dov |
|
1996 |
|
5 |
p. 339-353 |
artikel |
105 |
On-line control of a manufacturing cell using visual inspection
|
Razban, A. |
|
1991 |
|
5 |
p. 315-320 |
artikel |
106 |
Opportunistic electrode replacement in a robotic spot welding system
|
Mechefske, C. K. |
|
2006 |
|
5 |
p. 481-489 |
artikel |
107 |
Optimized CNC end-milling: a practical approach
|
El-Mounayri, H. |
|
2002 |
|
5 |
p. 453-470 |
artikel |
108 |
Performance analysis of network designs in CIM environment
|
Dutta, S. P. |
|
1993 |
|
5 |
p. 293-301 |
artikel |
109 |
Performance modelling and evaluation of flexible manufacturing systems using a semi-Markov approach
|
Ahmed, S. B. |
|
1989 |
|
5 |
p. 275-280 |
artikel |
110 |
Planning for just-in-time production
|
Chaharbaghi, K. |
|
1989 |
|
5 |
p. 268-274 |
artikel |
111 |
Qualitative and quantitative cost analysis for sheet metal stamping
|
Tang, Dunbing |
|
2004 |
|
5 |
p. 394-412 |
artikel |
112 |
Quality prediction for reconfigurable manufacturing systems via human error modelling
|
Elmaraghy, W. H. |
|
2008 |
|
5 |
p. 584-598 |
artikel |
113 |
Rule management for integration of information systems
|
Choi, Injun |
|
2000 |
|
5 |
p. 446-460 |
artikel |
114 |
Scheduling multi-operation jobs in partially overlapping systems
|
Wang, C. |
|
2006 |
|
5 |
p. 453-462 |
artikel |
115 |
Selection of database models for computer integrated manufacturing systems using the Analytic Hierarchy Process
|
ISLAM, M. ANWARUL |
|
1997 |
|
5 |
p. 394-404 |
artikel |
116 |
Self-adapting decision support for interactive fault diagnosis of manufacturing systems
|
Ye, Nong |
|
1996 |
|
5 |
p. 392-401 |
artikel |
117 |
Sensor fusion for monitoring machine tool conditions
|
BAHR, B. |
|
1997 |
|
5 |
p. 314-323 |
artikel |
118 |
Service-oriented communication architecture for automated manufacturing system integration
|
Wu, B. |
|
2008 |
|
5 |
p. 599-615 |
artikel |
119 |
Simulation-based performance measurement and analysis: an industrial application
|
Duvivier, D. |
|
2005 |
|
5 |
p. 402-407 |
artikel |
120 |
Simultaneous evaluation and selection of strategies for loading and controlling machines and material handling system in FMS
|
Maheshwari, Sharad K. |
|
1995 |
|
5 |
p. 340-356 |
artikel |
121 |
Simultaneous identification of group technology machine cells and part families using a multiple solution framework
|
Mosier, Charles T. |
|
1996 |
|
5 |
p. 402-416 |
artikel |
122 |
Stamping die design based on numerical simulation and knowledge systematization
|
Hernandez, A. |
|
1999 |
|
5 |
p. 427-438 |
artikel |
123 |
Standard based framework for the of manufacturing control development systems
|
SUAREZ, OMAR AGUIRRE |
|
1998 |
|
5 |
p. 401-415 |
artikel |
124 |
State space representation of manufacturing operation plans in the presence of flexible routing capability
|
Borenstein, Denis |
|
2004 |
|
5 |
p. 451-466 |
artikel |
125 |
Strategic manufacturing system and process innovation through elimination of trade-offs
|
Shahbazpour, Mehdi |
|
2007 |
|
5 |
p. 413-422 |
artikel |
126 |
Surface preparation and coating of metal coils by using a fully integrated manufacturing system
|
Barletta, M. |
|
2007 |
|
5 |
p. 452-464 |
artikel |
127 |
Systems innovation: managing manufacturing systems redesign
|
Dooley, L. |
|
2000 |
|
5 |
p. 410-421 |
artikel |
128 |
TAMIL: an integrated fixture design system for prismatic parts
|
Cecil, J. |
|
2004 |
|
5 |
p. 421-434 |
artikel |
129 |
The complexity of mass customization systems under different inventory strategies
|
Zhang, T. |
|
2006 |
|
5 |
p. 423-433 |
artikel |
130 |
The effects of routing flexibility on a flexible manufacturing system
|
Chan, Felix T. S. |
|
2001 |
|
5 |
p. 431-445 |
artikel |
131 |
The implementation and integration of information systems for production management in manufacturing: an empirical study
|
Chang, Hsin Hsin |
|
2000 |
|
5 |
p. 369-387 |
artikel |
132 |
The introduction of an environmental cooling method is proved by using a reduced tool life cycle time method
|
Boswell, B. |
|
2007 |
|
5 |
p. 478-485 |
artikel |
133 |
The realization of reference enterprise modelling architectures
|
Toh, K. T. K. |
|
1999 |
|
5 |
p. 403-417 |
artikel |
134 |
The synthetic index algorithm: an improved cluster analysis procedure for machine cell formation
|
Wu, Sheh-Pang |
|
1990 |
|
5 |
p. 299-313 |
artikel |
135 |
UbiDM: A new paradigm for product design and manufacturing via ubiquitous computing technology
|
Suh, S. -H. |
|
2008 |
|
5 |
p. 540-549 |
artikel |
136 |
Using granular computing model to induce scheduling knowledge in dynamic manufacturing environments
|
Chen, L. -S. |
|
2008 |
|
5 |
p. 569-583 |
artikel |
137 |
Using organizational analysis and enterprise modelling in SMEs IDEF0 for
|
CANTAMESSA, MARCO |
|
1998 |
|
5 |
p. 416-429 |
artikel |