nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A COMPARISON OF ACCIDENT RATES USING THE LIKELIHOOD RATIO TESTING TECHNIQUE
|
Al-Ghamdi, Ali |
|
1993 |
|
3 |
p. 175-186 |
artikel |
2 |
A DESCRIPTION OF DAMAGE DEGREE AND ITS EVOLUTION IN SFRC UNDER FATIGUE LOADS
|
Ju, Yang |
|
1997 |
|
3 |
p. 233-247 |
artikel |
3 |
A FRAMEWORK FOR INTEGRATING BUSINESS AND INFORMATION TECHNOLOGY IN CONSTRUCTION
|
Alshawi, M. |
|
1995 |
|
3 |
p. 249-261 |
artikel |
4 |
A fuzzy system for bid proposal evaluation using microcomputers
|
Juang, C. H. |
|
1987 |
|
3 |
p. 124-130 |
artikel |
5 |
A graphical surface navigation technique for multiobjective programming
|
Gorti, Sreenivasa Rao |
|
1990 |
|
3 |
p. 178-184 |
artikel |
6 |
A HUMAN RELIABILITY ANALYSIS OF REINFORCED CONCRETE BEAM CONSTRUCTION
|
Stewart, M. G. |
|
1992 |
|
3 |
p. 227-250 |
artikel |
7 |
A KNOWLEDGE-BASED SYSTEM FOR PREDICTING AND IMPROVING PEDESTRIAN WIND CONDITIONS
|
Wu, Hanqing |
|
1995 |
|
3 |
p. 191-205 |
artikel |
8 |
A MAXIMUM ENTROPY BASED APPROACH TO THE LAYOUT OPTIMIZATION OF WATER DISTRIBUTION SYSTEMS
|
Tanyimboh, Tiku |
|
2002 |
|
3 |
p. 223-253 |
artikel |
9 |
A MULTIPLE-POINT EXCITATION PREDICTION MODEL OF PAVEMENT MANAGEMENT
|
Wong, W. G. |
|
2002 |
|
3 |
p. 209-222 |
artikel |
10 |
AN ALGORITHM TO IDENTIFY ALL PATHS IN SCHEDULING NETWORKS
|
Diaz, Carlos F. |
|
1992 |
|
3 |
p. 205-210 |
artikel |
11 |
AN ALTERNATIVE APPROACH FOR MODELING OF INTERFERENCE IN DISCRETE-EVENT SYSTEMS
|
Damrianant, Jirawat |
|
2000 |
|
3 |
p. 213-235 |
artikel |
12 |
Analysis of water distribution networks with head-dependent outlets
|
Reddy, L. Srinivasa |
|
1989 |
|
3 |
p. 102-110 |
artikel |
13 |
ANALYTICAL EQUATIONS OF STORAGE RESERVOIR WATER QUALITY
|
Boulos, P. F. |
|
1998 |
|
3 |
p. 171-186 |
artikel |
14 |
An effective response surface-based optimisation approach for soil vapour extraction system design
|
Fen, C. -S. |
|
2008 |
|
3 |
p. 227-243 |
artikel |
15 |
A network analysis and simulation program for water distribution systems
|
Coulbeck, B. |
|
1984 |
|
3 |
p. 139-144 |
artikel |
16 |
A new generation of decision tools for improving building site productivity
|
Omar, Emad Al Abo |
|
2003 |
|
3 |
p. 1 |
artikel |
17 |
A new method based on the theory of fuzzy sets for obtaining an indication of risk
|
Andersson, Leif |
|
1986 |
|
3 |
p. 164-174 |
artikel |
18 |
Angular fuzzy set models for linguistic values
|
Hadipriono, Fabian C. |
|
1990 |
|
3 |
p. 148-156 |
artikel |
19 |
An inexact two-stage mixed integer linear programming model for waste management under uncertainty
|
Maqsood, I. |
|
2004 |
|
3 |
p. 187-206 |
artikel |
20 |
AN INFORMATION SHARING, INTERNET-BASED, SYSTEM FOR PROJECT CONTROL
|
Abdelsayed, Maged |
|
1999 |
|
3 |
p. 211-233 |
artikel |
21 |
AN INTERACTIVE ALGORITHM TO EVALUATE PROJECT COST ESCALATION
|
Hastak, Makarand |
|
1994 |
|
3 |
p. 179-195 |
artikel |
22 |
A NOTE FROM THE EDITORS
|
Brown, Colin B. |
|
1995 |
|
3 |
p. 183 |
artikel |
23 |
A parametric study of concrete permeability
|
Mahboub, Kamyar |
|
2003 |
|
3 |
p. 1 |
artikel |
24 |
Application of an efficient search technique for solving optimal regional water quality management problems
|
Ong, S. L. |
|
1987 |
|
3 |
p. 131-141 |
artikel |
25 |
APPLICATION OF FAULT TREE ANALYSIS TO LONGITUDINAL CONTROL IN AUTOMATED HIGHWAY SYSTEMS
|
Faghri, Ardeshir |
|
1999 |
|
3 |
p. 155-173 |
artikel |
26 |
APPLICATION OF FAULT TREE ANALYSIS TO ROUTE GUIDANCE SYSTEM
|
Assistant, PUVVADA SIVARAMAVITTAL Graduate Research |
|
1994 |
|
3 |
p. 163-178 |
artikel |
27 |
Application of probabilistic analysis to assess the relative severity of crack-like weld defects
|
Edwards, G. |
|
1984 |
|
3 |
p. 160-167 |
artikel |
28 |
APPROXIMATE REASONING IN TRANSPORT PROJECT EVALUATION
|
Smith, P. N. |
|
1997 |
|
3 |
p. 199-231 |
artikel |
29 |
Approximations for heterogeneous finite source queues
|
Carmichael, David G. |
|
1991 |
|
3 |
p. 174-178 |
artikel |
30 |
A refined queueing model for earthmoving operations
|
Carmichael, David G. |
|
1987 |
|
3 |
p. 153-159 |
artikel |
31 |
A Review of: “Analysis and Optimum Design of Metal Structures” Jozsef Farkas and Karoly Jarmai Balkema, Rotterdam, 1997, 347p, ISOHfl
|
Spjllers, W. R. |
|
1998 |
|
3 |
p. 245-246 |
artikel |
32 |
A Review of: “Application of structural systems reliability theory” Palle Toft-Christensen & Yosida Morotsu Springer Verlag, Berlin, 1986, £44.00 ISBN 3-540-16362-X
|
Halldorsson, Arnthor |
|
1988 |
|
3 |
p. 167 |
artikel |
33 |
A Review of: “Bridge Aerodynamics” Edited by Allan Larsen and Soren Esdahl
|
Owens, E. H. |
|
1999 |
|
3 |
p. 235-238 |
artikel |
34 |
A Review of: “Construction of drilled pier Foundations” D. M. Greer and W. S. Gardner John Wiley & Sons Ltd, Chichester, UK, 1986, 240 pp, £38.50
|
Pole, E. |
|
1987 |
|
3 |
p. 164 |
artikel |
35 |
A Review of: “Ecological aspects of used-water treatment: volume 2, Biological activities and treatment processes” Edited by C. R. Curds and H. A. Hawkes Academic Press, London, UK 1983, 308 pp, £32.50, US$55.00
|
Johnstone, D. W. M. |
|
1984 |
|
3 |
p. 173 |
artikel |
36 |
A Review of: “Engineering and Society” R. B. Keey and others Publication No. 31, University of Canterbury, Christchurch, New Zealand, 1983
|
Munro, J. |
|
1984 |
|
3 |
p. 171-172 |
artikel |
37 |
A Review of: “Engineering Safety” by D. Blockley, McGraw-Hill Series in Civil Engineering, ISBN 0-07-077593-5 for Int. Jour. “Civil Engineering Systems”
|
Wolfram, Julian |
|
1995 |
|
3 |
p. 263-268 |
artikel |
38 |
A Review of: “Mathematical theory of production planning” A. Bensoussan, M. crouhy and J. M. Proth Advanced series in management, North Holland, Amsterdam, The Netherlands 1983, 505 pp, US$76.50, DM75.00
|
Perry, P. F. |
|
1984 |
|
3 |
p. 173-174 |
artikel |
39 |
A Review of: “Multi-objective decision making” Ed S. French, R. Hartley, L. C. Thomas and D. J. White Academic Press, London, 1983, 325 pp, £21.00
|
Jowitt, P. W. |
|
1985 |
|
3 |
p. 180-181 |
artikel |
40 |
A Review of: “Selected papers on soil mechanics” by A. W. Skempton, F.R.S. Compiled by the Soil Mechanics Section, Imperial College Thomas Telford Limited, London, 1984, 281 pp.
|
Davis, R. O. |
|
1985 |
|
3 |
p. 180 |
artikel |
41 |
A Review of: “Uncertainty and forecasting of water quality” Edited by M. B. Beck and G. van Straten Springer-Verlag, Heidelberg, West Germany, 1983, 386 pp, US$33.70, DM78.00
|
Finney, B. |
|
1984 |
|
3 |
p. 173 |
artikel |
42 |
ARTIFICIAL NEURAL NETWORKS FOR CONSTRUCTION BID DECISIONS
|
Dias, W. P. S. |
|
1996 |
|
3 |
p. 239-253 |
artikel |
43 |
A technical note on the inclusion of pressure dependent demand and leakage terms in water supply network models
|
Germanopoulos, George |
|
1985 |
|
3 |
p. 171-179 |
artikel |
44 |
A technical note on the probabilistic analysis of short piles on expansive soil
|
Ali, Elfatih Mohamed |
|
1988 |
|
3 |
p. 159-163 |
artikel |
45 |
BOOK REVIEW
|
|
|
2002 |
|
3 |
p. 255-261 |
artikel |
46 |
CALENDAR
|
|
|
1995 |
|
3 |
p. 269-271 |
artikel |
47 |
CALENDAR
|
|
|
1993 |
|
3 |
p. 275-278 |
artikel |
48 |
CALENDAR
|
|
|
2001 |
|
3 |
p. 251-254 |
artikel |
49 |
CALENDAR
|
|
|
1984 |
|
3 |
p. 174-175 |
artikel |
50 |
CALENDAR
|
|
|
1994 |
|
3 |
p. 245 |
artikel |
51 |
CALENDAR
|
|
|
1999 |
|
3 |
p. 239-241 |
artikel |
52 |
CALENDAR
|
|
|
1985 |
|
3 |
p. 182-184 |
artikel |
53 |
CALENDAR
|
|
|
1987 |
|
3 |
p. 164-168 |
artikel |
54 |
CALENDAR
|
|
|
1986 |
|
3 |
p. 175-180 |
artikel |
55 |
CALENDAR
|
|
|
1989 |
|
3 |
p. 143 |
artikel |
56 |
CALENDAR
|
|
|
1990 |
|
3 |
p. 187 |
artikel |
57 |
CALENDAR
|
|
|
1991 |
|
3 |
p. 185 |
artikel |
58 |
CALENDAR
|
|
|
2000 |
|
3 |
p. 263-265 |
artikel |
59 |
CALENDAR
|
|
|
1992 |
|
3 |
p. 273-274 |
artikel |
60 |
CALENDER
|
|
|
1996 |
|
3 |
p. 255-257 |
artikel |
61 |
CALENDER
|
|
|
1997 |
|
3 |
p. 249-250 |
artikel |
62 |
CALENDER
|
|
|
1988 |
|
3 |
p. 167-168 |
artikel |
63 |
CALENDER
|
|
|
1998 |
|
3 |
p. 247-249 |
artikel |
64 |
Characteristics of the fuzzy LP transportation problem for civil engineering application
|
Kikuchi, Shinya |
|
1991 |
|
3 |
p. 134-144 |
artikel |
65 |
Comparison of different ANN techniques in river flow prediction
|
Kisi, Ozgur |
|
2007 |
|
3 |
p. 211-231 |
artikel |
66 |
Consistent crudeness principles in design and forensic decision making
|
Castaneda, Duane E. |
|
1991 |
|
3 |
p. 125-133 |
artikel |
67 |
Construction risk management
|
Kangari, Roozbeh |
|
1988 |
|
3 |
p. 114-120 |
artikel |
68 |
Construction safety performance in the United Arab Emirates
|
Al-Kaabi, Noura |
|
2003 |
|
3 |
p. 197-212 |
artikel |
69 |
CONTROL OF CONSTRUCTION ACTIVITIES: II. CONDITION ASSESSMENT OF ATTRIBUTES
|
Ayyub, Bilal M. |
|
1992 |
|
3 |
p. 179-204 |
artikel |
70 |
Decision making with fuzzy quadratic programming
|
Cui, W. |
|
1990 |
|
3 |
p. 140-147 |
artikel |
71 |
DECISION MAPPING: UNDERSTANDING DECISION MAKING PROCESSES
|
FRANCOIS, J-C. BOUCHART a. |
|
2002 |
|
3 |
p. 187-207 |
artikel |
72 |
Decision support software approach to the assessment of stone masonry bridges
|
Whittington, H. W. |
|
1988 |
|
3 |
p. 137-147 |
artikel |
73 |
DEVELOPMENT AND APPLICATION OF AN EXPERT SYSTEM FOR EVALUATION OF SCOUR AND STREAM STABILITY
|
Harmsen, Paul |
|
2001 |
|
3 |
p. 171-192 |
artikel |
74 |
DEVELOPMENT OF A PORTABLE EXPERT SYSTEM FOR REHABILITATION INSPECTION IN SALT LAKE CITY
|
Lin, Lee-Kuo |
|
1996 |
|
3 |
p. 185-202 |
artikel |
75 |
Development of rehabilitation plans for water mains replacement considering risk and cost-benefit assessment
|
Giustolisi, Orazio |
|
2006 |
|
3 |
p. 175-190 |
artikel |
76 |
Diagnosis analysis of a small-scale incinerator by neural networks model
|
Chen, Jeng-Chung |
|
2008 |
|
3 |
p. 201-213 |
artikel |
77 |
Discussion of paper
|
Miles, J. C. |
|
1990 |
|
3 |
p. 185-186 |
artikel |
78 |
Discussion of Papers
|
|
|
1987 |
|
3 |
p. 160-163 |
artikel |
79 |
Discussion of papers
|
Juang, C. H. |
|
1988 |
|
3 |
p. 164-166 |
artikel |
80 |
DUALISTIC SYSTEMS OF CIVIL ENGINEERING PRACTICE
|
Riihela, Sakari |
|
1995 |
|
3 |
p. 237-248 |
artikel |
81 |
DYNAMIC MODELLING OF SEDIMENTATION IN THE ACTIVATED SLUDGE PROCESS
|
Marsili-Libelli, S. |
|
1993 |
|
3 |
p. 207-224 |
artikel |
82 |
Economic level of reliability for the rehabilitation of hydraulic networks
|
Tricarico, C. |
|
2006 |
|
3 |
p. 191-207 |
artikel |
83 |
EDITORIAL
|
Jowitt, Paul W. |
|
1987 |
|
3 |
p. 114 |
artikel |
84 |
Editorial
|
Savic, Dragan |
|
2006 |
|
3 |
p. 127-128 |
artikel |
85 |
Editorial
|
|
|
1985 |
|
3 |
p. 130-131 |
artikel |
86 |
Efficient energy management of a large-scale water supply system
|
Bounds, Peter |
|
2006 |
|
3 |
p. 209-220 |
artikel |
87 |
Entropy-based optimum sizing of trusses
|
Xingsi, Li |
|
1988 |
|
3 |
p. 121-128 |
artikel |
88 |
Eriang loading models in earthmoving
|
Carmichael, David G. |
|
1986 |
|
3 |
p. 118-124 |
artikel |
89 |
Erratum
|
|
|
1987 |
|
3 |
p. 164 |
artikel |
90 |
Expert system outline for the classification of sustainable flood retention basins (SFRBs)
|
Scholz, Miklas |
|
2007 |
|
3 |
p. 193-209 |
artikel |
91 |
EXPLICIT CALCULATION OF WATER QUALITY PARAMETERS IN PIPE DISTRIBUTION SYSTEMS
|
Boulos, P. F. |
|
1993 |
|
3 |
p. 187-206 |
artikel |
92 |
Explicit network calibration for multiple loading conditions
|
Boulos, Paul F. |
|
1991 |
|
3 |
p. 153-160 |
artikel |
93 |
Finite element analysis of plates on elastic foundations: an automated approach
|
Dick, Robert Earl |
|
1986 |
|
3 |
p. 125-132 |
artikel |
94 |
Forensic project management: The underlying causes of rework in construction projects
|
Love, Peter E. D. |
|
2004 |
|
3 |
p. 207-228 |
artikel |
95 |
Frequency-constrained optimization of space frames having general cross-sectional relationships*
|
McGee, Oliver G. |
|
1991 |
|
3 |
p. 161-173 |
artikel |
96 |
From uncertainty to approximate reasoning: part 1: conceptual models and engineering interpretations
|
Dong, Wei-Min |
|
1986 |
|
3 |
p. 143-154 |
artikel |
97 |
Fuzzy multi-attribute decision making in pavement management
|
Gunaratne, M. |
|
1985 |
|
3 |
p. 166-170 |
artikel |
98 |
GALILEO'S CONFIRMATION OF A FALSE HYPOTHESIS: A PARADIGM OF LOGICAL ERROR IN DESIGN
|
Petroski, Henry |
|
1992 |
|
3 |
p. 251-263 |
artikel |
99 |
Incremental formulation for structural reliability analysis
|
Tang, K. |
|
1988 |
|
3 |
p. 153-158 |
artikel |
100 |
International comparison of cost for the construction sector: towards a conceptual model
|
Sawhney, Anil |
|
2004 |
|
3 |
p. 151-167 |
artikel |
101 |
Investigation of path requirements in a water distribution network
|
Bouchart, F. |
|
1990 |
|
3 |
p. 127-134 |
artikel |
102 |
Jaynes, Bayes and fuzzy identification
|
Brown, Colin B. |
|
1987 |
|
3 |
p. 142-146 |
artikel |
103 |
LEARNING ABOUT COMPLEX SYSTEMS
|
Elms, David G. |
|
1992 |
|
3 |
p. 265-272 |
artikel |
104 |
LEONARDO DA VINCI'S TENSILE STRENGTH TESTS: IMPLICATIONS FOR THE DISCOVERY OF ENGINEERING MECHANICS
|
Lund, Jay R. |
|
2001 |
|
3 |
p. 243-250 |
artikel |
105 |
LINEAR PROGRAMMING SOLUTION OF MASONRY ARCH STABILITY
|
Chilton, Brian J. |
|
1995 |
|
3 |
p. 219-235 |
artikel |
106 |
Managing complex water resources systems
|
Miles, J. C. |
|
2003 |
|
3 |
p. 185-196 |
artikel |
107 |
Mathematical similarities in engineering network analysis
|
Templeman, A. B. |
|
1984 |
|
3 |
p. 114-122 |
artikel |
108 |
Minimum volume of curtailed reinforcement in rectangular slabs
|
Ahmed, M. Z. |
|
1984 |
|
3 |
p. 151-159 |
artikel |
109 |
Multicriteria capacity expansion planning for an urban water system with random data
|
Urbaniak, A. |
|
1988 |
|
3 |
p. 129-136 |
artikel |
110 |
Near-optimal rehabilitation scheduling of water distribution systems based on a multi-objective genetic algorithm
|
Alvisi, Stefano |
|
2006 |
|
3 |
p. 143-160 |
artikel |
111 |
Neural networks based concrete airfield pavement layer moduli backcalculation
|
Ceylan, Halil |
|
2008 |
|
3 |
p. 185-199 |
artikel |
112 |
ON-LINE DETECTION OF STRUCTURAL DAMAGE USING NEURAL NETWORKS
|
Wong, Felix S. |
|
1997 |
|
3 |
p. 167-197 |
artikel |
113 |
Optimal design of water distribution systems
|
Gengdong, Cheng |
|
1989 |
|
3 |
p. 111-121 |
artikel |
114 |
Optimal design program for gravity sanitary sewers
|
Nzewi, Emmanuel U. |
|
1985 |
|
3 |
p. 132-141 |
artikel |
115 |
OPTIMAL MAINTENANCE SCHEDULING FOR WATER DISTRIBUTION SYSTEMS
|
Lansey, K. E. |
|
1992 |
|
3 |
p. 211-226 |
artikel |
116 |
OPTIMAL SHIPPING STRATEGY OF SOLID WASTE STREAMS BASED ON ENERGY RECOVERY AND THROUGHPUT REQUIREMENTS OF INCINERATION FACILITIES
|
Chang, Y. H. |
|
2001 |
|
3 |
p. 193-214 |
artikel |
117 |
Optimization in risk management
|
Cooke, Roger |
|
1989 |
|
3 |
p. 122-128 |
artikel |
118 |
Optimization of ductility in concrete ductile frames
|
Sabol, Thomas A. |
|
1986 |
|
3 |
p. 133-142 |
artikel |
119 |
Optimization of refuse storage systems
|
Khan, M. Z. Ali |
|
1984 |
|
3 |
p. 145-150 |
artikel |
120 |
OPTIMUM DESIGN OF FLEXIBLE WATER DISTRIBUTION NETWORKS
|
Tanyimboh, T. T. |
|
1993 |
|
3 |
p. 243-258 |
artikel |
121 |
Parameterized analysis of the choice between do-nothing and act-now options
|
Milke, Mark W. |
|
2007 |
|
3 |
p. 179-191 |
artikel |
122 |
PIPE SYSTEM PRESSURE PROBABILITIES WITH FLUCTUATING DEMANDS
|
Walters, G. A. |
|
1993 |
|
3 |
p. 259-274 |
artikel |
123 |
Plastic Analysis by Mathematical Programming
|
Munro, J. |
|
1996 |
|
3 |
p. 1-2 |
artikel |
124 |
Positioning, within water distribution networks, of monitoring stations aiming at an early detection of intentional contamination
|
Cozzolino, L. |
|
2006 |
|
3 |
p. 161-174 |
artikel |
125 |
Post-optimal analysis of a degenerate optimal solution to the Hitchcock formulation
|
Leclerc, Guy |
|
1989 |
|
3 |
p. 92-101 |
artikel |
126 |
Prediction models for sewer infrastructure utilizing rule-based simulation
|
Ruwanpura, Janaka |
|
2004 |
|
3 |
p. 169-185 |
artikel |
127 |
Prediction of skid resistance coefficient of cement concrete roads with fuzzy logic
|
Ustuntas, Taner |
|
2007 |
|
3 |
p. 233-246 |
artikel |
128 |
Probabilistic network analysis for project completion time*
|
Putcha, Chandra S. |
|
1991 |
|
3 |
p. 179-184 |
artikel |
129 |
Project correlation in portfolio theory
|
Eldukair, Z. A. |
|
1990 |
|
3 |
p. 170-177 |
artikel |
130 |
PROJECT-LEVEL EVALUATION OF HIGHWAY MAINTENANCE USING STATE INCREMENT DYNAMIC PROGRAMMING
|
Ravirala, Venkatesh |
|
1996 |
|
3 |
p. 223-238 |
artikel |
131 |
Properties of the iterative optimization-equilibrium algorithm
|
Friesz, Terry L. |
|
1985 |
|
3 |
p. 142-154 |
artikel |
132 |
QUALITATIVE QUERYING OF PHYSICAL PROCESS SIMULATIONS
|
Chandra, S. |
|
1993 |
|
3 |
p. 225-242 |
artikel |
133 |
Recent developments in engineering education
|
Elms, D. G. |
|
1984 |
|
3 |
p. 170-171 |
artikel |
134 |
RELIABILITY OF EXISTING STRUCTURES
|
Hong, Han Ping |
|
1998 |
|
3 |
p. 187-206 |
artikel |
135 |
RISK ANALYSIS IN CONSTRUCTION NETWORKS USING A MODIFIED STOCHASTIC ASSIGNMENT MODEL
|
Guo, Qiu Ling |
|
2001 |
|
3 |
p. 215-241 |
artikel |
136 |
Risk assessment for gas pipelines using fuzzy sets
|
Ikejima, Kenji |
|
1987 |
|
3 |
p. 147-152 |
artikel |
137 |
Robots and automated systems for the civil and construction industries
|
Bradley, D. A. |
|
1990 |
|
3 |
p. 135-139 |
artikel |
138 |
SEARCH FOR CRITICAL SLIP CIRCLE USING GENETIC ALGORITHMS
|
Goh, Anthony T. C. |
|
2000 |
|
3 |
p. 181-211 |
artikel |
139 |
Seasonally differentiated power station cooling
|
Rudolph, K. -U. |
|
1986 |
|
3 |
p. 155-163 |
artikel |
140 |
Sensitivity analysis for multi-attribute project selection problems
|
Guikema, Seth |
|
2003 |
|
3 |
p. 143-162 |
artikel |
141 |
Sequencing of hydro projects by using mixed integer programming
|
Mdoda, Gavin N. |
|
1988 |
|
3 |
p. 148-152 |
artikel |
142 |
Shape considerations in spatial optimization
|
Benabdallah, Salah |
|
1991 |
|
3 |
p. 145-152 |
artikel |
143 |
Simulated aircraft load testing and non-destructive evaluation of bituminous pavements
|
Gopalakrishnan, Kasthurirangan |
|
2008 |
|
3 |
p. 215-225 |
artikel |
144 |
Simulation of ON/OFF controlled systems
|
Berlin, Miriam |
|
1985 |
|
3 |
p. 155-165 |
artikel |
145 |
SOIL LABORATORY DATA INTERPRETATION USING GENERALIZED REGRESSION NEURAL NETWORK
|
Goh, Anthony T. C. |
|
1999 |
|
3 |
p. 175-195 |
artikel |
146 |
SOME IDEAS ON A SYSTEMIC APPROACH
|
Beard, Alan N. |
|
1999 |
|
3 |
p. 197-209 |
artikel |
147 |
Statistical distributions of health risks
|
Fiering, Myron B. |
|
1984 |
|
3 |
p. 129-138 |
artikel |
148 |
Sustaining the environment in a developing world
|
|
|
1987 |
|
3 |
p. 115-123 |
artikel |
149 |
System bounds: a critical study
|
Ramachandran, Kanagasabai |
|
1984 |
|
3 |
p. 123-128 |
artikel |
150 |
The choice of optimal checking strategies for error control in structural engineering
|
Nessim, M. A. |
|
1989 |
|
3 |
p. 83-91 |
artikel |
151 |
The interpretation of measurements from civil engineering systems
|
Comerford, J. B. |
|
1989 |
|
3 |
p. 136-142 |
artikel |
152 |
THE REFLECTIVE SYSTEMS PRACTITIONERS
|
Brown, Colin B. |
|
1996 |
|
3 |
p. 173 |
artikel |
153 |
Towards a process based information architecture for construction
|
Sanvido, Victor E. |
|
1990 |
|
3 |
p. 157-169 |
artikel |
154 |
Towards machine learning from case histories
|
Stone, J. R. |
|
1989 |
|
3 |
p. 129-135 |
artikel |
155 |
TRANSCENDING THE LIMITS
|
Elms, David |
|
1995 |
|
3 |
p. 185-189 |
artikel |
156 |
TWO NEW GA-BASED METHODS FOR MULTIOBJECTIVE OPTIMIZATION
|
Coello, Carlos A. Coello |
|
1998 |
|
3 |
p. 207-243 |
artikel |
157 |
UNCERTAINTY AND SENSITIVITY ANALYSIS IN A LOW-HEAD HYDRO SYSTEM
|
Desai, V. R. |
|
1995 |
|
3 |
p. 207-217 |
artikel |
158 |
USING ELECTRE TO RANK OPTIONS WITHIN AN ENVIRONMENTAL APPRAISAL-TWO CASE STUDIES
|
Rogers, M.G. |
|
1996 |
|
3 |
p. 203-221 |
artikel |
159 |
UTILITY THEORY VIOLATIONS BY MULTI-CRITERIA HIERARCHICAL WEIGHTING METHODS
|
Lund, Jay R. |
|
1994 |
|
3 |
p. 197-207 |
artikel |
160 |
VALIDATION OF PROBABILISTIC MODELS
|
Lind, Niels C. |
|
1996 |
|
3 |
p. 175-183 |
artikel |
161 |
VERTICAL CAPACITY OF PILES USING FUZZY SETS
|
Elton, David J. |
|
2000 |
|
3 |
p. 237-262 |
artikel |
162 |
WASTE FLOW ALLOCATION PLANNING THROUGH A GREY FUZZY QUADRATIC PROGRAMMING APPROACH
|
Huang, Guo H. |
|
1994 |
|
3 |
p. 209-243 |
artikel |