nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Adequate and economic factory transformability and the effects on logistical performance
|
Nyhuis, Peter |
|
2007 |
|
3 |
p. 286-307 |
artikel |
2 |
A Generic Model to Solve Tactical Planning Problems inFlexible Manufacturing Systems
|
Mustafa Kubilay Atlihan |
|
1999 |
|
3 |
p. 215-243 29 p. |
artikel |
3 |
A Generic Model to Solve Tactical Planning Problems in Flexible Manufacturing Systems
|
Atlihan, Mustafa Kubilay |
|
1999 |
|
3 |
p. 215-243 |
artikel |
4 |
A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures
|
Alcaide, David |
|
2006 |
|
3 |
p. 201-226 |
artikel |
5 |
A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System
|
Jaejin Jang |
|
2001 |
|
3 |
p. 287-308 22 p. |
artikel |
6 |
A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System
|
Jang, Jaejin |
|
2001 |
|
3 |
p. 287-308 |
artikel |
7 |
A modeling approach for evaluating capacity flexibilities in uncertain markets
|
Zaeh, M. F. |
|
2007 |
|
3 |
p. 151-172 |
artikel |
8 |
A modular control design method for a flexible manufacturing cell including error handling
|
Lee, Seungjoo |
|
2008 |
|
3 |
p. 308-330 |
artikel |
9 |
Analysis of reactive deadlock-free scheduling in flexible job shops
|
Fahmy, Sherif A. |
|
2007 |
|
3 |
p. 264-285 |
artikel |
10 |
An Evaluative Study of Operation Grouping Policies in an FMS
|
Ihsan Sabuncuolu |
|
2003 |
|
3 |
p. 217-239 23 p. |
artikel |
11 |
An Evaluative Study of Operation Grouping Policies in an FMS
|
Sabuncuoğlu, Ihsan |
|
2003 |
|
3 |
p. 217-239 |
artikel |
12 |
An Object-Oriented Approach for Flexible Manufacturing Control Systems Analysis and Design Using the Unified Modeling Language
|
Manfredi Bruccoleri |
|
2003 |
|
3 |
p. 195-216 22 p. |
artikel |
13 |
An Object-Oriented Approach for Flexible Manufacturing Control Systems Analysis and Design Using the Unified Modeling Language
|
Bruccoleri, Manfredi |
|
2003 |
|
3 |
p. 195-216 |
artikel |
14 |
A queueing model for a two-stage stochastic manufacturing system with overlapping operations
|
Nieuwenhuyse, I. Van |
|
2006 |
|
3 |
p. 175-199 |
artikel |
15 |
Assessing capacity scalability policies in RMS using system dynamics
|
Deif, Ahmed M. |
|
2008 |
|
3 |
p. 128-150 |
artikel |
16 |
A Workload Data Aggregation Process for Flexible Manufacturing System Modeling using Queueing Network Models
|
David De Almeida |
|
2001 |
|
3 |
p. 309-350 42 p. |
artikel |
17 |
A Workload Data Aggregation Process for Flexible Manufacturing System Modeling using Queueing Network Models
|
De Almeida, David |
|
2001 |
|
3 |
p. 309-350 |
artikel |
18 |
Complexity Results for Mixed-Model Assembly Lines withApproximation Algorithms for the Single Station Case
|
Oliver Goldschmidt |
|
1997 |
|
3 |
p. 251-272 22 p. |
artikel |
19 |
Complexity Results for Mixed-Model Assembly Lines with Approximation Algorithms for the Single Station Case
|
Goldschmidt, Oliver |
|
1997 |
|
3 |
p. 251-272 |
artikel |
20 |
Contributing Authors
|
Alcaide, David |
|
2006 |
|
3 |
p. 251-253 |
artikel |
21 |
Contributing Authors
|
|
|
2002 |
|
3 |
p. 281-283 3 p. |
artikel |
22 |
Contributing Authors
|
|
|
2005 |
|
3 |
p. 277 |
artikel |
23 |
Contributing Authors
|
|
|
1999 |
|
3 |
p. 315-317 3 p. |
artikel |
24 |
Contributing Authors
|
|
|
2003 |
|
3 |
p. 273-274 2 p. |
artikel |
25 |
Contributing Authors
|
|
|
2003 |
|
3 |
p. 273-274 |
artikel |
26 |
Contributing Authors
|
|
|
1999 |
|
3 |
p. 315-317 |
artikel |
27 |
Contributing Authors
|
|
|
2002 |
|
3 |
p. 281-283 |
artikel |
28 |
Design and Implementation of a Flexible Manufacturing Control System Using Neural Network
|
Magdy M. Abdelhameed |
|
2002 |
|
3 |
p. 263-279 17 p. |
artikel |
29 |
Design and Implementation of a Flexible Manufacturing Control System Using Neural Network
|
Abdelhameed, Magdy M. |
|
2002 |
|
3 |
p. 263-279 |
artikel |
30 |
Direct and Indirect Effects of Product Mix Characteristics on Capacity Management Decisions and Operating Performance
|
Shannon W. Anderson |
|
2001 |
|
3 |
p. 241-265 25 p. |
artikel |
31 |
Direct and Indirect Effects of Product Mix Characteristics on Capacity Management Decisions and Operating Performance
|
Anderson, Shannon W. |
|
2001 |
|
3 |
p. 241-265 |
artikel |
32 |
Dynamic flexibility metrics for capability and capacity
|
Hassanzadeh, Pejman |
|
2008 |
|
3 |
p. 195-216 |
artikel |
33 |
Economic and strategic perspectives on investing in RMS and FMS
|
Kuzgunkaya, O. |
|
2008 |
|
3 |
p. 217-246 |
artikel |
34 |
Enabling change in manufacturing systems
|
ElMaraghy, Hoda A. |
|
2008 |
|
3 |
p. 125-127 |
artikel |
35 |
Estimation of Part Waiting Time and Fleet Sizing in AGV Systems
|
Koo, Pyung-Hoi |
|
2005 |
|
3 |
p. 211-228 |
artikel |
36 |
Evaluating Virtual Cells and Multistage Flow Shops An Analytical Approach
|
Asoo J. Vakharia |
|
1999 |
|
3 |
p. 291-314 24 p. |
artikel |
37 |
Evaluating Virtual Cells and Multistage Flow Shops: An Analytical Approach
|
Vakharia, Asoo J. |
|
1999 |
|
3 |
p. 291-314 |
artikel |
38 |
Flexible Air-Jet Tooling for Vibratory Bowl Feeder Systems
|
Neboja I. Jaki |
|
2002 |
|
3 |
p. 227-248 22 p. |
artikel |
39 |
Flexible Air-Jet Tooling for Vibratory Bowl Feeder Systems
|
Jakšić, Nebojša I. |
|
2002 |
|
3 |
p. 227-248 |
artikel |
40 |
Impact of ramp-up on the optimal capacity-related reconfiguration policy
|
Matta, Andrea |
|
2007 |
|
3 |
p. 173-194 |
artikel |
41 |
Impact of Routing Flexibility on the Performance of an FMSA Simulation Study
|
Rahul Caprihan |
|
1997 |
|
3 |
p. 273-298 26 p. |
artikel |
42 |
Impact of Routing Flexibility on the Performance of an FMS—A Simulation Study
|
Caprihan, Rahul |
|
1997 |
|
3 |
p. 273-298 |
artikel |
43 |
Integrated Modeling Framework for Manufacturing Systems:A Unified Representation of the Physical Process and Information System
|
Hee Won Kang |
|
1998 |
|
3 |
p. 231-265 35 p. |
artikel |
44 |
Integrated Modeling Framework for Manufacturing Systems: A Unified Representation of the Physical Process and Information System
|
Kang, Hee Won |
|
1998 |
|
3 |
p. 231-265 |
artikel |
45 |
Introduction to the Special Issue on Information-Based Manufacturing
|
Michael J. Shaw |
|
1998 |
|
3 |
p. 195-196 2 p. |
artikel |
46 |
Introduction to the Special Issue on Information-Based Manufacturing
|
Shaw, Michael J. |
|
1998 |
|
3 |
p. 195-196 |
artikel |
47 |
Maintenance Integration in Manufacturing Systems From the Modeling Tool to Evaluation
|
Zineb Simeu-Abazi |
|
2001 |
|
3 |
p. 267-285 19 p. |
artikel |
48 |
Maintenance Integration in Manufacturing Systems: From the Modeling Tool to Evaluation
|
Simeu-Abazi, Zineb |
|
2001 |
|
3 |
p. 267-285 |
artikel |
49 |
Object-Oriented Modeling for Flexible Manufacturing Systems
|
Alexander W. Booth |
|
1998 |
|
3 |
p. 301-314 14 p. |
artikel |
50 |
Object-Oriented Modeling for Flexible Manufacturing Systems
|
Booth, Alexander W. |
|
1998 |
|
3 |
p. 301-314 |
artikel |
51 |
On the Consequences of Information Delays in the Scheduling of Semi-Automated Flexible Machines
|
Caprihan, Rahul |
|
2005 |
|
3 |
p. 251-275 |
artikel |
52 |
On the Consequences of Information Delays in the Scheduling of Semi-Automated Flexible Machines
|
Caprihan, Rahul |
|
|
|
3 |
p. 251-275 |
artikel |
53 |
On the Dependability Design of Manufacturing Information Systems
|
António Rocha Quintas |
|
1998 |
|
3 |
p. 267-300 34 p. |
artikel |
54 |
On the Dependability Design of Manufacturing Information Systems
|
Quintas, António Rocha |
|
1998 |
|
3 |
p. 267-300 |
artikel |
55 |
Operational flexibility quantification in a make-to-order assembly system
|
Calvo, Roque |
|
2008 |
|
3 |
p. 247-263 |
artikel |
56 |
Performance Analysis of an FMS Operating Under Different Failure Rates and Maintenance Policies
|
Savsar, Mehmet |
|
2005 |
|
3 |
p. 229-249 |
artikel |
57 |
Performance Analysis of an FMS Operating Under Different Failure Rates and Maintenance Policies
|
Savsar, Mehmet |
|
|
|
3 |
p. 229-249 |
artikel |
58 |
Performance Analysis of Flexible Manufacturing Systemswith a Single Discrete Material-Handling Device
|
Rajan Suri |
|
1997 |
|
3 |
p. 223-249 27 p. |
artikel |
59 |
Performance Analysis of Flexible Manufacturing Systems with a Single Discrete Material-Handling Device
|
Suri, Rajan |
|
1997 |
|
3 |
p. 223-249 |
artikel |
60 |
Production Capacity of Flexible Manufacturing Systems with Fixed Production Ratios
|
Ronald Buitenhek |
|
2002 |
|
3 |
p. 203-225 23 p. |
artikel |
61 |
Production Capacity of Flexible Manufacturing Systems with Fixed Production Ratios
|
Buitenhek, Ronald |
|
2002 |
|
3 |
p. 203-225 |
artikel |
62 |
Reengineering the Order Fulfillment Process in Supply Chain Networks
|
Lin, Fu-Ren |
|
1998 |
|
3 |
p. 197-229 |
artikel |
63 |
Representing the Material Handling System in Tractable QueuingNetwork Models of Flexible Manufacturing Systems A Workload Data Aggregation Approach
|
David De Almeida |
|
1999 |
|
3 |
p. 245-269 25 p. |
artikel |
64 |
Representing the Material Handling System in Tractable Queuing Network Models of Flexible Manufacturing Systems: A Workload Data Aggregation Approach
|
De Almeida, David |
|
1999 |
|
3 |
p. 245-269 |
artikel |
65 |
RETRACTED ARTICLE: Effect of reconfiguration costs on planning for capacity scalability in reconfigurable manufacturing systems
|
Deif, Ahmed M. |
|
2006 |
|
3 |
p. 225-238 |
artikel |
66 |
Reverse simulation for collaborative commerce: A study of integrating object-oriented database technology with object-oriented simulator
|
Du, Timon C. |
|
2006 |
|
3 |
p. 227-250 |
artikel |
67 |
Supervisory Control of Functionally-Expandable Manufacturing Systems
|
A. Ramirez-Serrano |
|
2003 |
|
3 |
p. 241-271 31 p. |
artikel |
68 |
Supervisory Control of Functionally-Expandable Manufacturing Systems
|
Ramirez-Serrano, A. |
|
2003 |
|
3 |
p. 241-271 |
artikel |
69 |
The Effects of Scheduling Rules and Routing Flexibility on the Performance of a Random Flexible Manufacturing System
|
Farzad Mahmoodi |
|
1999 |
|
3 |
p. 271-289 19 p. |
artikel |
70 |
The Effects of Scheduling Rules and Routing Flexibility on the Performance of a Random Flexible Manufacturing System
|
Mahmoodi, Farzad |
|
1999 |
|
3 |
p. 271-289 |
artikel |
71 |
Vehicle Travel Time Models for AGV Systems under Various Dispatching Rules
|
Pyung-Hoi Koo |
|
2002 |
|
3 |
p. 249-261 13 p. |
artikel |
72 |
Vehicle Travel Time Models for AGV Systems under Various Dispatching Rules
|
Koo, Pyung-Hoi |
|
2002 |
|
3 |
p. 249-261 |
artikel |