nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Cascading Auction Protocol as a Framework for Integrating Process Planning and Heterarchical Shop Floor Control
|
Patrick McDonnell |
|
1999 |
|
1 |
p. 37-62 26 p. |
artikel |
2 |
A Cascading Auction Protocol as a Framework for Integrating Process Planning and Heterarchical Shop Floor Control
|
McDonnell, Patrick |
|
1999 |
|
1 |
p. 37-62 |
artikel |
3 |
A Classification for Hoist Scheduling Problems
|
Marie-Ange Manier |
|
2003 |
|
1 |
p. 37-55 19 p. |
artikel |
4 |
A Classification for Hoist Scheduling Problems
|
Manier, Marie-Ange |
|
2003 |
|
1 |
p. 37-55 |
artikel |
5 |
A Comparison Between Machine Flexibility and Routing Flexibility
|
Hitoshi Tsubone |
|
1999 |
|
1 |
p. 83-101 19 p. |
artikel |
6 |
A Comparison Between Machine Flexibility and Routing Flexibility
|
Tsubone, Hitoshi |
|
1999 |
|
1 |
p. 83-101 |
artikel |
7 |
A fuzzy dispatching strategy for due-date scheduling of FMSs with information delays
|
Caprihan, Rahul |
|
2006 |
|
1 |
p. 29-53 |
artikel |
8 |
A Genetic Algorithm Approach to the Scheduling of FMSs with Multiple Routes
|
Chunwei Zhao |
|
2001 |
|
1 |
p. 71-88 18 p. |
artikel |
9 |
A Genetic Algorithm Approach to the Scheduling of FMSs with Multiple Routes
|
Zhao, Chunwei |
|
2001 |
|
1 |
p. 71-88 |
artikel |
10 |
A Loop Material Flow System Design for Automated Guided Vehicles
|
Ardavan Asef-Vaziri |
|
2001 |
|
1 |
p. 33-48 16 p. |
artikel |
11 |
A Loop Material Flow System Design for Automated Guided Vehicles
|
Asef-Vaziri, Ardavan |
|
2001 |
|
1 |
p. 33-48 |
artikel |
12 |
Analogy-Based Multiple Process Planning System with Resource Conflicts
|
David Ben-Arieh |
|
1999 |
|
1 |
p. 63-82 20 p. |
artikel |
13 |
Analogy-Based Multiple Process Planning System with Resource Conflicts
|
Ben-Arieh, David |
|
1999 |
|
1 |
p. 63-82 |
artikel |
14 |
An Analytical Queueing Network Model forFlexible Manufacturing Systems with a Discrete Handling Device andTransfer Blockings
|
David De Almeida |
|
2000 |
|
1 |
p. 25-57 33 p. |
artikel |
15 |
An Analytical Queueing Network Model for Flexible Manufacturing Systems with a Discrete Handling Device and Transfer Blockings
|
De Almeida, David |
|
2000 |
|
1 |
p. 25-57 |
artikel |
16 |
An Efficient Heuristic Approach to Recognize the Infeasibility of a Loading Problem
|
Vernon Ning Hsu |
|
1997 |
|
1 |
p. 31-50 20 p. |
artikel |
17 |
An Efficient Heuristic Approach to Recognize the Infeasibility of a Loading Problem
|
Hsu, Vernon Ning |
|
1997 |
|
1 |
p. 31-50 |
artikel |
18 |
An Object-Oriented Modeling and Simulation Environment for Reactive Systems Development
|
Bernard T. Barcio |
|
1997 |
|
1 |
p. 51-80 30 p. |
artikel |
19 |
An Object-Oriented Modeling and Simulation Environment for Reactive Systems Development
|
Barcio, Bernard T. |
|
1997 |
|
1 |
p. 51-80 |
artikel |
20 |
A note on productivity gains in flexible robotic cells
|
Geismar, H. Neil |
|
2005 |
|
1 |
p. 5-21 |
artikel |
21 |
A review of some issues and identification of some barriers in the implementation of FMS
|
Raj, Tilak |
|
|
|
1 |
p. 1-40 |
artikel |
22 |
A review of some issues and identification of some barriers in the implementation of FMS
|
Raj, Tilak |
|
2007 |
|
1 |
p. 1-40 |
artikel |
23 |
A Simulation Study of an Object-Oriented Integration Testbed for Process Planning and Production Scheduling
|
Daguang Zhang |
|
1999 |
|
1 |
p. 19-35 17 p. |
artikel |
24 |
A Simulation Study of an Object-Oriented Integration Testbed for Process Planning and Production Scheduling
|
Zhang, Daguang |
|
1999 |
|
1 |
p. 19-35 |
artikel |
25 |
A Supervisory Control Approach for Execution Control of an FMC
|
Sangkyun Kim |
|
2001 |
|
1 |
p. 5-31 27 p. |
artikel |
26 |
A Supervisory Control Approach for Execution Control of an FMC
|
Kim, Sangkyun |
|
2001 |
|
1 |
p. 5-31 |
artikel |
27 |
A Synergistic Framework for Evaluating Business Process Improvements
|
Joseph Sarkis |
|
2002 |
|
1 |
p. 53-71 19 p. |
artikel |
28 |
A Synergistic Framework for Evaluating Business Process Improvements
|
Sarkis, Joseph |
|
2002 |
|
1 |
p. 53-71 |
artikel |
29 |
Availability Analysis for Multitask Production Systems
|
Lori E. Seward |
|
2004 |
|
1 |
p. 91-110 20 p. |
artikel |
30 |
Availability Analysis for Multitask Production Systems
|
Seward, Lori E. |
|
2004 |
|
1 |
p. 91-110 |
artikel |
31 |
Bottleneck Allocation Methodology An Integrated ManufacturingManagement ModelA Systems Study
|
Gerhard Plenert |
|
2000 |
|
1 |
p. 81-101 21 p. |
artikel |
32 |
Bottleneck Allocation Methodology: An Integrated Manufacturing Management Model—A Systems Study
|
Plenert, Gerhard |
|
2000 |
|
1 |
p. 81-101 |
artikel |
33 |
Business Process Reengineering and Flexibility A Case for Unification
|
Guy Fitzgerald |
|
2002 |
|
1 |
p. 73-86 14 p. |
artikel |
34 |
Business Process Reengineering and Flexibility: A Case for Unification
|
Fitzgerald, Guy |
|
2002 |
|
1 |
p. 73-86 |
artikel |
35 |
Contributing Authors
|
|
|
2005 |
|
1 |
p. 67-68 |
artikel |
36 |
Contributing Authors
|
|
|
2004 |
|
1 |
p. 111-114 4 p. |
artikel |
37 |
Contributing Authors
|
|
|
2003 |
|
1 |
p. 87-89 3 p. |
artikel |
38 |
Contributing Authors
|
|
|
2004 |
|
1 |
p. 111-114 |
artikel |
39 |
Contributing Authors
|
|
|
2003 |
|
1 |
p. 87-89 |
artikel |
40 |
Contributing Authors
|
, |
|
2006 |
|
1 |
p. 75-76 |
artikel |
41 |
Controlling flexible manufacturing systems based on a dynamic selection of the appropriate operational criteria and scheduling policy
|
Shnits, Boris |
|
2006 |
|
1 |
p. 1-27 |
artikel |
42 |
Design Guidelines for Deadlock-Handling Strategies in Flexible Manufacturing Systems
|
Mark Lawley |
|
1997 |
|
1 |
p. 5-30 26 p. |
artikel |
43 |
Design Guidelines for Deadlock-Handling Strategies in Flexible Manufacturing Systems
|
Lawley, Mark |
|
1997 |
|
1 |
p. 5-30 |
artikel |
44 |
Diagnosing Manufacturing Variation Using Second-Order and Fourth-Order Statistics
|
Ho Young Lee |
|
2004 |
|
1 |
p. 45-64 20 p. |
artikel |
45 |
Diagnosing Manufacturing Variation Using Second-Order and Fourth-Order Statistics
|
Lee, Ho Young |
|
2004 |
|
1 |
p. 45-64 |
artikel |
46 |
Enabling BPR in Maintenance Through a Performance Measurement System Framework
|
K. Y. Kutucuoglu |
|
2002 |
|
1 |
p. 33-52 20 p. |
artikel |
47 |
Enabling BPR in Maintenance Through a Performance Measurement System Framework
|
Kutucuoglu, K. Y. |
|
2002 |
|
1 |
p. 33-52 |
artikel |
48 |
Estimation of the mean waiting time of a customer subject to balking: a simulation study
|
Jang, Jaejin |
|
2007 |
|
1 |
p. 63 |
artikel |
49 |
Fitting Circles and Spheres to Coordinate Measuring Machine Data
|
Gass, Saul I. |
|
1998 |
|
1 |
p. 5-25 |
artikel |
50 |
Flexibility and Pricing Decisions for High-Volume Products with Short Life Cycles
|
Richard M. Franza |
|
1998 |
|
1 |
p. 43-71 29 p. |
artikel |
51 |
Flexibility and Pricing Decisions for High-Volume Products with Short Life Cycles
|
Franza, Richard M. |
|
1998 |
|
1 |
p. 43-71 |
artikel |
52 |
Grouping PCBs with Minimum Feeder Changes
|
Jouni Smed |
|
2003 |
|
1 |
p. 19-35 17 p. |
artikel |
53 |
Grouping PCBs with Minimum Feeder Changes
|
Smed, Jouni |
|
2003 |
|
1 |
p. 19-35 |
artikel |
54 |
Guest Editorial Business Process Reengineering An Analysis Perspective
|
Zahir Irani |
|
2002 |
|
1 |
p. 5-10 6 p. |
artikel |
55 |
Guest Editorial: Business Process Reengineering: An Analysis Perspective
|
Irani, Zahir |
|
2002 |
|
1 |
p. 5-10 |
artikel |
56 |
How Radical Was IT-Enabled BPR Evidence on Financial and Business Impacts
|
Leslie P. Willcocks |
|
2002 |
|
1 |
p. 11-31 21 p. |
artikel |
57 |
How Radical Was IT-Enabled BPR? Evidence on Financial and Business Impacts
|
Willcocks, Leslie P. |
|
2002 |
|
1 |
p. 11-31 |
artikel |
58 |
Identifying Sources of Variation in Sheet Metal Stamping
|
Karl D. Majeske |
|
2003 |
|
1 |
p. 5-18 14 p. |
artikel |
59 |
Identifying Sources of Variation in Sheet Metal Stamping
|
Majeske, Karl D. |
|
2003 |
|
1 |
p. 5-18 |
artikel |
60 |
Introduction Modeling and Analysis for Complex Production Systems. Position Statement
|
Dariusz Ceglarek |
|
2004 |
|
1 |
p. 5-9 5 p. |
artikel |
61 |
Introduction: Modeling and Analysis for Complex Production Systems. Position Statement
|
Ceglarek, Dariusz |
|
2004 |
|
1 |
p. 5-9 |
artikel |
62 |
Manufacturing Flexibility Assessing Managerial Perception andUtilization
|
Marcio Zukin |
|
2000 |
|
1 |
p. 5-23 19 p. |
artikel |
63 |
Manufacturing Flexibility: Assessing Managerial Perception and Utilization
|
Zukin, Marcio |
|
2000 |
|
1 |
p. 5-23 |
artikel |
64 |
Models and Algorithms for Failure Diagnosis and Recovery in FMSs
|
Abdoul Karim Armand Toguyéni |
|
2003 |
|
1 |
p. 57-85 29 p. |
artikel |
65 |
Models and Algorithms for Failure Diagnosis and Recovery in FMSs
|
Toguyéni, Abdoul Karim Armand |
|
2003 |
|
1 |
p. 57-85 |
artikel |
66 |
Optimal Sequencing Rules for Some Large-Scale FlexibleManufacturing Problems Under the Manhattan and Chebychev Metrics
|
Gilbert Laporte |
|
1998 |
|
1 |
p. 27-42 16 p. |
artikel |
67 |
Optimal Sequencing Rules for Some Large-Scale Flexible Manufacturing Problems Under the Manhattan and Chebychev Metrics
|
Laporte, Gilbert |
|
1998 |
|
1 |
p. 27-42 |
artikel |
68 |
Optimization of workcell layouts in a mixed-model assembly line environment
|
Klampfl, Erica |
|
2007 |
|
1 |
p. 65 |
artikel |
69 |
Planning and Sequencing Heuristics for Feature-Based Control of Holonic Machining Equipment
|
Junho Shin |
|
2001 |
|
1 |
p. 49-70 22 p. |
artikel |
70 |
Planning and Sequencing Heuristics for Feature-Based Control of Holonic Machining Equipment
|
Shin, Junho |
|
2001 |
|
1 |
p. 49-70 |
artikel |
71 |
Reengineering the Stock Replenishment System An Australian Case Study
|
Amrik S. Sohal |
|
2002 |
|
1 |
p. 87-98 12 p. |
artikel |
72 |
Reengineering the Stock Replenishment System: An Australian Case Study
|
Sohal, Amrik S. |
|
2002 |
|
1 |
p. 87-98 |
artikel |
73 |
RFID-enhanced multi-agent based control for a machining system
|
Higuera, Andrés García |
|
|
|
1 |
p. 41-61 |
artikel |
74 |
RFID-enhanced multi-agent based control for a machining system
|
Higuera, Andrés García |
|
2007 |
|
1 |
p. 41-61 |
artikel |
75 |
Scheduling of FMSs with information delays: A simulation study
|
Caprihan, Rahul |
|
2005 |
|
1 |
p. 39-65 |
artikel |
76 |
Sequencing of Parts in Robotic Cells
|
Haoxun Chen |
|
1997 |
|
1 |
p. 81-104 24 p. |
artikel |
77 |
Sequencing of Parts in Robotic Cells
|
Chen, Haoxun |
|
1997 |
|
1 |
p. 81-104 |
artikel |
78 |
Stable Earliest Starting Schedules for CyclicJob Shops A Linear System Approach
|
Tae-Eog Lee |
|
2000 |
|
1 |
p. 59-80 22 p. |
artikel |
79 |
Stable Earliest Starting Schedules for Cyclic Job Shops: A Linear System Approach
|
Lee, Tae-Eog |
|
2000 |
|
1 |
p. 59-80 |
artikel |
80 |
Teams and their Motivation for Business Process Reengineering A Research Note
|
Jyoti Choudrie |
|
2002 |
|
1 |
p. 99-107 9 p. |
artikel |
81 |
Teams and their Motivation for Business Process Reengineering: A Research Note
|
Choudrie, Jyoti |
|
2002 |
|
1 |
p. 99-107 |
artikel |
82 |
The Application and Evaluation of Bankers Algorithm for Deadlock-Free Buffer Space Allocation in Flexible Manufacturing Systems
|
Mark Lawley |
|
1998 |
|
1 |
p. 73-100 28 p. |
artikel |
83 |
The Application and Evaluation of Banker's Algorithm for Deadlock-Free Buffer Space Allocation in Flexible Manufacturing Systems
|
Lawley, Mark |
|
1998 |
|
1 |
p. 73-100 |
artikel |
84 |
The Effects of Workstation Flexibility on the (N × N) Job Shop Problem
|
K. Pflughoeft |
|
1999 |
|
1 |
p. 103-113 11 p. |
artikel |
85 |
The Effects of Workstation Flexibility on the (N × N) Job Shop Problem
|
Pflughoeft, K. |
|
1999 |
|
1 |
p. 103-113 |
artikel |
86 |
Time-Based Competition in Multistage Manufacturing Stream-of-Variation Analysis (SOVA) MethodologyReview
|
D. Ceglarek |
|
2004 |
|
1 |
p. 11-44 34 p. |
artikel |
87 |
Time-Based Competition in Multistage Manufacturing: Stream-of-Variation Analysis (SOVA) Methodology—Review
|
Ceglarek, D. |
|
2004 |
|
1 |
p. 11-44 |
artikel |
88 |
Tolerance Analysis for Design of Multistage Manufacturing Processes Using Number-Theoretical Net Method (NT-net)
|
Wenzhen Huang |
|
2004 |
|
1 |
p. 65-90 26 p. |
artikel |
89 |
Tolerance Analysis for Design of Multistage Manufacturing Processes Using Number-Theoretical Net Method (NT-net)
|
Huang, Wenzhen |
|
2004 |
|
1 |
p. 65-90 |
artikel |
90 |
Towards an Integration of Process Planning and Production Planning and Control for Flexible Manufacturing Systems
|
Gerard J.C. Gaalman |
|
1999 |
|
1 |
p. 5-17 13 p. |
artikel |
91 |
Towards an Integration of Process Planning and Production Planning and Control for Flexible Manufacturing Systems
|
Gaalman, Gerard J.C. |
|
1999 |
|
1 |
p. 5-17 |
artikel |
92 |
Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first
|
Koo, Pyung-Hoi |
|
2005 |
|
1 |
p. 23-38 |
artikel |