nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Closed-Form Methodology for Computing Present Worth Statistics of Risky Discrete Cash-Flows
|
Tanchoco, Jose M. A. |
|
1977 |
9 |
3 |
p. 278-287 |
artikel |
2 |
An Application of Facilities Location Theory to the Design of Forest Harvesting Areas
|
Dykstra, Dennis P. |
|
1977 |
9 |
3 |
p. 270-277 |
artikel |
3 |
Availability of Maintained Systems: A State-of-the-Art Survey
|
Lie, C. H. |
|
1977 |
9 |
3 |
p. 247-259 |
artikel |
4 |
Book Review
|
|
|
1977 |
9 |
3 |
p. 305 |
artikel |
5 |
Editorial
|
|
|
1977 |
9 |
3 |
p. 222 |
artikel |
6 |
Education and Professional Practice: Criticism and Feedback
|
Morris, William T. |
|
1977 |
9 |
3 |
p. 260-269 |
artikel |
7 |
Efficient Points in Location Problems
|
Wendell, Richard E. |
|
1977 |
9 |
3 |
p. 238-246 |
artikel |
8 |
Guest Reviewers
|
|
|
1977 |
9 |
3 |
p. 316 |
artikel |
9 |
Maintenance Scheduling for Multicomponent Equipment
|
Vergin, Roger C. |
|
1977 |
9 |
3 |
p. 297-305 |
artikel |
10 |
Minimizing the Sum of Completion Times of n Jobs over m Machines in a Flowshop—A Branch and Bound Approach
|
Bansal, S. P. |
|
1977 |
9 |
3 |
p. 306-311 |
artikel |
11 |
Order Quantity, Product Popularity, and The Location of Stock in a Warehouse
|
Wilson, Hoyt G. |
|
1977 |
9 |
3 |
p. 230-237 |
artikel |
12 |
Scheduling on Parallel Machines to Minimize Two Criteria Related to Job Tardiness
|
Nunnikhoven, Thomas S. |
|
1977 |
9 |
3 |
p. 288-296 |
artikel |
13 |
Some Relationships Between Dynamic Shop Operations and the Capacity Rating Methodology
|
Wilhelm, W. E. |
|
1977 |
9 |
3 |
p. 223-229 |
artikel |
14 |
The Effects of Inspector Error on The Operation of a c-Chart
|
Dorris, Alan L. |
|
1977 |
9 |
3 |
p. 312-315 |
artikel |