nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A decomposition method for multi-product kanban systems with setup times and lost sales
|
Krieg, Georg N. |
|
2002 |
34 |
7 |
p. 613-625 |
artikel |
2 |
A decomposition method for multiproduct kanban systems with setup times and lost sales
|
Georg N. Krieg |
|
2002 |
34 |
7 |
p. 613-625 13 p. |
artikel |
3 |
A decomposition method for multi-product kanban systems with setup times and lost sales
|
Krieg, Georg N. |
|
2002 |
34 |
7 |
p. 613-625 |
artikel |
4 |
A review of: “Manufacturing Processes and Equipment” J. TLUSTY Prentice Hall, Upper Saddle River, NJ ISBN 0-201-49865-0
|
Raman, Shivakumar |
|
2002 |
34 |
7 |
p. 647-648 |
artikel |
5 |
Base stock versus WIP cap in single-stage make-to-stock production-inventory systems
|
Liberopoulos, George |
|
2002 |
34 |
7 |
p. 627-636 |
artikel |
6 |
Base stock versus WIP cap in singlestage maketostock productioninventory systems
|
George Liberopoulos |
|
2002 |
34 |
7 |
p. 627-636 10 p. |
artikel |
7 |
Base stock versus WIP cap in single-stage make-to-stock production–inventory systems
|
Liberopoulos, George |
|
2002 |
34 |
7 |
p. 627-636 |
artikel |
8 |
Book Review: Manufacturing Processes and Equipment
|
J. Tlusty |
|
2002 |
34 |
7 |
p. 647-648 2 p. |
artikel |
9 |
Book Review: Manufacturing Processes and Equipment
|
Tlusty, J. |
|
2002 |
34 |
7 |
p. 647-648 |
artikel |
10 |
Design of product specifications and control policies in a single-stage production system
|
Kouikoglou, Vassilis S. |
|
2002 |
34 |
7 |
p. 591-600 |
artikel |
11 |
Design of product specifications and control policies in a singlestage production system
|
Vassilis S. Kouikoglou |
|
2002 |
34 |
7 |
p. 591-600 10 p. |
artikel |
12 |
Design of product specifications and control policies in a single-stage production system
|
Kouikoglou, Vassilis S. |
|
2002 |
34 |
7 |
p. 591-600 |
artikel |
13 |
Intelligent agent modeling of an industrial warehousing problem
|
Kim, Byung-In |
|
2002 |
34 |
7 |
p. 601-612 |
artikel |
14 |
Intelligent agent modeling of an industrial warehousing problem
|
ByungIn Kim |
|
2002 |
34 |
7 |
p. 601-612 12 p. |
artikel |
15 |
Intelligent agent modeling of an industrial warehousing problem
|
Kim, Byung-In |
|
2002 |
34 |
7 |
p. 601-612 |
artikel |
16 |
Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control
|
Yang, Taho |
|
2002 |
34 |
7 |
p. 637-646 |
artikel |
17 |
Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control
|
Taho Yang |
|
2002 |
34 |
7 |
p. 637-646 10 p. |
artikel |
18 |
Modeling and implementation of a neurofuzzy system for surface mount assembly defect prediction and control
|
Yang, Taho |
|
2002 |
34 |
7 |
p. 637-646 |
artikel |