nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An order batching algorithm for wave picking in a parallel-aisle warehouse
|
Gademann, A.J.R.M. |
|
2001 |
33 |
5 |
p. 385-398 |
artikel |
2 |
An order batching algorithm for wave picking in a parallel-aisle warehouse
|
A.J.R.M. (noud) Gademann |
|
2001 |
33 |
5 |
p. 385-398 14 p. |
artikel |
3 |
An order batching algorithm for wave picking in a parallel-aisle warehouse
|
Gademann, A.J.R.M. (noud) |
|
2001 |
33 |
5 |
p. 385-398 |
artikel |
4 |
A solution to the hub center problem via a single-relocation algorithm with tabu search
|
Pamuk, F. Selcen |
|
2001 |
33 |
5 |
p. 399-411 |
artikel |
5 |
A solution to the hub center problem via a single-relocation algorithm with tabu search
|
F. Selcen Pamuk |
|
2001 |
33 |
5 |
p. 399-411 13 p. |
artikel |
6 |
A solution to the hub center problem via a single-relocation algorithm with tabu search
|
Pamuk, F. Selcen |
|
2001 |
33 |
5 |
p. 399-411 |
artikel |
7 |
A variable redefinition approach for the lot sizing problem with strong set-up interactions
|
Bhatia, Manish |
|
2001 |
33 |
5 |
p. 357-370 |
artikel |
8 |
A variable redefinition approach for the lot sizing problem with strong set-up interactions
|
Manish Bhatia |
|
2001 |
33 |
5 |
p. 357-370 14 p. |
artikel |
9 |
A variable redefinition approach for the lot sizing problem with strong set-up interactions
|
Bhatia, Manish |
|
2001 |
33 |
5 |
p. 357-370 |
artikel |
10 |
Coordinating a three-level supply chain with quantity discounts
|
Munson, Charles L. |
|
2001 |
33 |
5 |
p. 371-384 |
artikel |
11 |
Coordinating a three-level supply chain with quantity discounts
|
Charles L. Munson |
|
2001 |
33 |
5 |
p. 371-384 14 p. |
artikel |
12 |
Coordinating a three-level supply chain with quantity discounts
|
Munson, Charles L. |
|
2001 |
33 |
5 |
p. 371-384 |
artikel |
13 |
Erratum
|
|
|
2001 |
33 |
5 |
p. 427 |
artikel |
14 |
Erratum
|
|
|
2001 |
33 |
5 |
p. 427 |
artikel |
15 |
Erratum
|
|
|
2001 |
33 |
5 |
p. 427-427 1 p. |
artikel |
16 |
Optimal production run length and inspection schedules in a deteriorating production process
|
Kim, Chang Hyun |
|
2001 |
33 |
5 |
p. 421-426 |
artikel |
17 |
Optimal production run length and inspection schedules in a deteriorating production process
|
Chang Hyun Kim |
|
2001 |
33 |
5 |
p. 421-426 6 p. |
artikel |
18 |
Optimal production run length and inspection schedules in a deteriorating production process
|
Kim, Chang Hyun |
|
2001 |
33 |
5 |
p. 421-426 |
artikel |
19 |
Single machine batch scheduling with sequential job processing
|
Cheng, T.C.E. |
|
2001 |
33 |
5 |
p. 413-420 |
artikel |
20 |
Single machine batch scheduling with sequential job processing
|
T.C.E. Cheng |
|
2001 |
33 |
5 |
p. 413-420 8 p. |
artikel |
21 |
Single machine batch scheduling with sequential job processing
|
Cheng, T.C.E. |
|
2001 |
33 |
5 |
p. 413-420 |
artikel |