Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             24 results found
no title author magazine year volume issue page(s) type
1 Analytic models for when and how to expedite in make-to-order systems Arslan, Hasan
2001
33 11 p. 1019-1029
article
2 Analytic Models for When and How to Expedite in Make-to-Order Systems Arslan, Hasan
2001
33 11 p. 1019-1030
article
3 Analytic Models for When and How to Expedite in Make-to-Order Systems Hasan Arslan
2001
33 11 p. 1019-1030
12 p.
article
4 An extension of the goma model for determining the optimal number of depots Rutten, W.G.M.M.
2001
33 11 p. 1031-1036
article
5 An Extension of the GOMA Model for Determining the Optimal Number of Depots Rutten, W.G.M.M.
2001
33 11 p. 1031-1036
article
6 An Extension of the GOMA Model for Determining the Optimal Number of Depots W.G.M.M. Rutten
2001
33 11 p. 1031-1036
6 p.
article
7 Economic lot-sizing with remanufacturing options Golany, Boaz
2001
33 11 p. 995-1003
article
8 Economic Lot-Sizing with Remanufacturing Options Golany, Boaz
2001
33 11 p. 995-1004
article
9 Economic Lot-Sizing with Remanufacturing Options Boaz Golany
2001
33 11 p. 995-1004
10 p.
article
10 Integrated project scheduling and material planning with variable activity duration and rewards Dod1N, B.
2001
33 11 p. 1005-1018
article
11 Integrated Project Scheduling and Material Planning with Variable Activity Duration and Rewards Dodin, B.
2001
33 11 p. 1005-1018
article
12 Integrated Project Scheduling and Material Planning with Variable Activity Duration and Rewards B. Dodin
2001
33 11 p. 1005-1018
14 p.
article
13 Marketing/manufacturing trade-offs in product line management Morgan, Leslie Olin
2001
33 11 p. 949-962
article
14 Marketing/Manufacturing Trade-Offs in Product Line Management Morgan, Leslie Olin
2001
33 11 p. 949-962
article
15 Marketing/Manufacturing Trade-Offs in Product Line Management Leslie Olin Morgan
2001
33 11 p. 949-962
14 p.
article
16 Scheduling of customized jobs on a single machine under item availability Gerodimos, A. E.
2001
33 11 p. 975-984
article
17 Scheduling of Customized Jobs on a Single Machine under Item Availability Gerodimos, A.E.
2001
33 11 p. 975-984
article
18 Scheduling of Customized Jobs on a Single Machine under Item Availability A.E. Gerodimos
2001
33 11 p. 975-984
10 p.
article
19 Sequencing three-stage flexible flowshops with identical machines to minimize makespan Soewandi, Hanijanto
2001
33 11 p. 985-993
article
20 Sequencing Three-Stage Flexible Flowshops with Identical Machines to Minimize Makespan Soewandi, Hanijanto
2001
33 11 p. 985-994
article
21 Sequencing Three-Stage Flexible Flowshops with Identical Machines to Minimize Makespan Hanijanto Soewandi
2001
33 11 p. 985-994
10 p.
article
22 The plant location and technology acquisition problem Dasc, Abdullah
2001
33 11 p. 963-973
article
23 The Plant Location and Technology Acquisition Problem Dasci, Abdullah
2001
33 11 p. 963-974
article
24 The Plant Location and Technology Acquisition Problem Abdullah Dasci
2001
33 11 p. 963-974
12 p.
article
                             24 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands