no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A comparison of existing grouping efficiency measures and a new weighted grouping efficiency measure
|
Sarker, Bhaba R. |
|
2001 |
33 |
1 |
p. 11-27 |
article |
2 |
A comparison of existing grouping efficiency measures and a new weighted grouping efficiency measure
|
Bhaba R. Sarker |
|
2001 |
33 |
1 |
p. 11-27 17 p. |
article |
3 |
A comparison of existing grouping efficiency measures and a new weighted grouping efficiency measure
|
Sarker, Bhaba R. |
|
2001 |
33 |
1 |
p. 11-27 |
article |
4 |
A design methodology for fractal layout organization
|
Gopalakrishnan, Sriram |
|
2001 |
33 |
1 |
p. 79-81 |
article |
5 |
A design methodology for fractal layout organization
|
Sriram Gopalakrishnan |
|
2001 |
33 |
1 |
p. 79-81 3 p. |
article |
6 |
A design methodology for fractal layout organization
|
Gopalakrishnan, Sriram |
|
2001 |
33 |
1 |
p. 79-81 |
article |
7 |
Balancing mixed-model assembly lines to reduce work overload
|
Matanachai, Sittichai |
|
2001 |
33 |
1 |
p. 29-42 |
article |
8 |
Balancing mixed-model assembly lines to reduce work overload
|
Sittichai Matanachai |
|
2001 |
33 |
1 |
p. 29-42 14 p. |
article |
9 |
Balancing mixed-model assembly lines to reduce work overload
|
Matanachai, Sittichai |
|
2001 |
33 |
1 |
p. 29-42 |
article |
10 |
Exact collision detection for a virtual manufacturing simulator
|
Tesic, Rade |
|
2001 |
33 |
1 |
p. 43-54 |
article |
11 |
Exact collision detection for a virtual manufacturing simulator
|
Rade Tesic |
|
2001 |
33 |
1 |
p. 43-54 12 p. |
article |
12 |
Exact collision detection for a virtual manufacturing simulator
|
Tesic, Rade |
|
2001 |
33 |
1 |
p. 43-54 |
article |
13 |
Expected move request waiting times in single-device, polling-based material handling systems
|
Bozer, Yavuz A. |
|
2001 |
33 |
1 |
p. 55-63 |
article |
14 |
Expected move request waiting times in single-device, polling-based material handling systems
|
Yavuz A. Bozer |
|
2001 |
33 |
1 |
p. 55-63 9 p. |
article |
15 |
Expected move request waiting times in single-device, polling-based material handling systems
|
Bozer, Yavuz A. |
|
2001 |
33 |
1 |
p. 55-63 |
article |
16 |
Intelligent dynamic control policies for serial production lines
|
Paternina-Arboleda, Carlos D. |
|
2001 |
33 |
1 |
p. 65-77 |
article |
17 |
Intelligent dynamic control policies for serial production lines
|
Carlos D. Paternina-Arboleda |
|
2001 |
33 |
1 |
p. 65-77 13 p. |
article |
18 |
Intelligent dynamic control policies for serial production lines
|
Paternina-Arboleda, Carlos D. |
|
2001 |
33 |
1 |
p. 65-77 |
article |
19 |
One-machine, Af-product-type, continuous-time scheduling with a common due date: a polynomially solvable case
|
Kogan, Konstantin |
|
2001 |
33 |
1 |
p. 1-10 |
article |
20 |
One-machine, N-product-type, continuous-time scheduling with a common due date: a polynomially solvable case
|
Konstantin Kogan |
|
2001 |
33 |
1 |
p. 1-10 10 p. |
article |
21 |
One-machine, N-product-type, continuous-time scheduling with a common due date: a polynomially solvable case
|
Kogan, Konstantin |
|
2001 |
33 |
1 |
p. 1-10 |
article |