nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A fast procedure for computing the total system cost of an appointment schedule for medical and kindred facilities
|
Lau, Hon-Shiang |
|
2000 |
32 |
9 |
p. 833-839 |
artikel |
2 |
A fast procedure for computing the total system cost of an appointment schedule for medical and kindred facilities
|
Hon-Shiang Lau |
|
2000 |
32 |
9 |
p. 833-839 7 p. |
artikel |
3 |
A fast procedure for computing the total system cost of an appointment schedule for medical and kindred facilities
|
Lau, Hon-Shiang |
|
2000 |
32 |
9 |
p. 833-839 |
artikel |
4 |
Analysis of investments in autonomous maintenance activities
|
McKONE, KATHLEEN E. |
|
2000 |
32 |
9 |
p. 849-859 |
artikel |
5 |
Analysis of investments in autonomous maintenance activities
|
Kathleen E. McKone |
|
2000 |
32 |
9 |
p. 849-859 11 p. |
artikel |
6 |
Analysis of investments in autonomous maintenance activities
|
McKone, Kathleen E. |
|
2000 |
32 |
9 |
p. 849-859 |
artikel |
7 |
Control of a manufacturing system with random product yield and downward substitutability
|
Duenyas, Izak |
|
2000 |
32 |
9 |
p. 785-795 |
artikel |
8 |
Control of a manufacturing system with random product yield and downward substitutability
|
Izak Duenyas |
|
2000 |
32 |
9 |
p. 785-795 11 p. |
artikel |
9 |
Control of a manufacturing system with random product yield and downward substitutability
|
Duenyas, Izak |
|
2000 |
32 |
9 |
p. 785-795 |
artikel |
10 |
Dynamic quality control in assembly systems
|
Zheng, Shaohui |
|
2000 |
32 |
9 |
p. 797-806 |
artikel |
11 |
Dynamic quality control in assembly systems
|
Shaohui Zheng |
|
2000 |
32 |
9 |
p. 797-806 10 p. |
artikel |
12 |
Dynamic quality control in assembly systems
|
Zheng, Shaohui |
|
2000 |
32 |
9 |
p. 797-806 |
artikel |
13 |
Editorial
|
Chao, Xiuli |
|
2000 |
32 |
9 |
p. 5-7 |
artikel |
14 |
Finite-capacity multi-class production scheduling with set-up times
|
Kim, Eungab |
|
2000 |
32 |
9 |
p. 807-818 |
artikel |
15 |
Finite-capacity multi-class production scheduling with set-up times
|
Eungab Kim |
|
2000 |
32 |
9 |
p. 807-818 12 p. |
artikel |
16 |
Finite-capacity multi-class production scheduling with set-up times
|
Kim, Eungab |
|
2000 |
32 |
9 |
p. 807-818 |
artikel |
17 |
Minimizing expected waiting in a medical appointment system
|
Bosch, Peter M. Vanden |
|
2000 |
32 |
9 |
p. 841-848 |
artikel |
18 |
Minimizing expected waiting in a medical appointment system
|
Peter M. Vanden Bosch |
|
2000 |
32 |
9 |
p. 841-848 8 p. |
artikel |
19 |
Minimizing expected waiting in a medical appointment system
|
Vanden Bosch, Peter M. |
|
2000 |
32 |
9 |
p. 841-848 |
artikel |
20 |
Monitoring multivariate aviation safety data by data depth: control charts and threshold systems
|
Cheng, Andrew Y. |
|
2000 |
32 |
9 |
p. 861-872 |
artikel |
21 |
Monitoring multivariate aviation safety data by data depth: control charts and threshold systems
|
Andrew Y. Cheng |
|
2000 |
32 |
9 |
p. 861-872 12 p. |
artikel |
22 |
Monitoring multivariate aviation safety data by data depth: control charts and threshold systems
|
Cheng, Andrew Y. |
|
2000 |
32 |
9 |
p. 861-872 |
artikel |
23 |
Quoting manufacturing due dates subject to a service level constraint
|
Hopp, Wallace J. |
|
2000 |
32 |
9 |
p. 771-784 |
artikel |
24 |
Quoting manufacturing due dates subject to a service level constraint
|
Wallace J. Hopp |
|
2000 |
32 |
9 |
p. 771-784 14 p. |
artikel |
25 |
Quoting manufacturing due dates subject to a service level constraint
|
Hopp, Wallace J. |
|
2000 |
32 |
9 |
p. 771-784 |
artikel |
26 |
Relaxed asynchronous flow-control algorithms for multiclass service networks
|
Rump, Christopher M. |
|
2000 |
32 |
9 |
p. 873-880 |
artikel |
27 |
Relaxed asynchronous flow-control algorithms for multiclass service networks
|
Christopher M. Rump |
|
2000 |
32 |
9 |
p. 873-880 8 p. |
artikel |
28 |
Relaxed asynchronous flow-control algorithms for multiclass service networks
|
Rump, Christopher M. |
|
2000 |
32 |
9 |
p. 873-880 |
artikel |
29 |
Risk intermediation in supply chains
|
Agrawal, Vipul |
|
2000 |
32 |
9 |
p. 819-831 |
artikel |
30 |
Risk intermediation in supply chains
|
Vipul Agrawal |
|
2000 |
32 |
9 |
p. 819-831 13 p. |
artikel |
31 |
Risk intermediation in supply chains
|
Agrawal, Vipul |
|
2000 |
32 |
9 |
p. 819-831 |
artikel |
32 |
Strongly asymptotically optimal design and control of production and service systems
|
Shanthikumar, J. George |
|
2000 |
32 |
9 |
p. 881-890 |
artikel |
33 |
Strongly asymptotically optimal design and control of production and service systems
|
J. George Shanthikumar |
|
2000 |
32 |
9 |
p. 881-890 10 p. |
artikel |
34 |
Strongly asymptotically optimal design and control of production and service systems
|
Shanthikumar, J. George |
|
2000 |
32 |
9 |
p. 881-890 |
artikel |