nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A neural network-based algorithm that searches for the measuring points of a rule surface
|
Lin, Zone-Ching |
|
2000 |
32 |
4 |
p. 333-343 |
artikel |
2 |
A neural network-based algorithm that searches for the measuring points of a rule surface
|
ZONE-CHING LIN |
|
2000 |
32 |
4 |
p. 333-343 11 p. |
artikel |
3 |
A neural network-based algorithm that searches for the measuring points of a rule surface
|
Lin, Zone-Ching |
|
2000 |
32 |
4 |
p. 333-343 |
artikel |
4 |
Design of flexible plant layouts
|
Benjaafar, Saifallah |
|
2000 |
32 |
4 |
p. 309-322 |
artikel |
5 |
Design of flexible plant layouts
|
SAIFALLAH BENJAAFAR |
|
2000 |
32 |
4 |
p. 309-322 14 p. |
artikel |
6 |
Design of flexible plant layouts
|
Benjaafar, Saifallah |
|
2000 |
32 |
4 |
p. 309-322 |
artikel |
7 |
Extended kanban control system: combining kanban and base stock
|
Dallery, Yves |
|
2000 |
32 |
4 |
p. 369-386 |
artikel |
8 |
Extended kanban control system: combining kanban and base stock
|
YVES DALLERY |
|
2000 |
32 |
4 |
p. 369-386 18 p. |
artikel |
9 |
Extended kanban control system: combining kanban and base stock
|
Dallery, Yves |
|
2000 |
32 |
4 |
p. 369-386 |
artikel |
10 |
Minimal investment budgets for flow line configuration
|
Kimms, Alf |
|
2000 |
32 |
4 |
p. 287-298 |
artikel |
11 |
Minimal investment budgets for flow line configuration
|
ALF KIMMS |
|
2000 |
32 |
4 |
p. 287-298 12 p. |
artikel |
12 |
Minimal investment budgets for flow line configuration
|
Kimms, Alf |
|
2000 |
32 |
4 |
p. 287-298 |
artikel |
13 |
Modeling work group effectiveness in high-technology manufacturing environments
|
Bailey, Diane E. |
|
2000 |
32 |
4 |
p. 361-368 |
artikel |
14 |
Modeling work group effectiveness in high-technology manufacturing environments
|
DIANE E. BAILEY |
|
2000 |
32 |
4 |
p. 361-368 8 p. |
artikel |
15 |
Modeling work group effectiveness in high-technology manufacturing environments
|
Bailey, Diane E. |
|
2000 |
32 |
4 |
p. 361-368 |
artikel |
16 |
Performance of real-time distributed arrival time control in heterarchical manufacturing systems
|
Prabhu, Vittaldas V. |
|
2000 |
32 |
4 |
p. 323-331 |
artikel |
17 |
Performance of real-time distributed arrival time control in heterarchical manufacturing systems
|
VITTALDAS V. PRABHU |
|
2000 |
32 |
4 |
p. 323-331 9 p. |
artikel |
18 |
Performance of real-time distributed arrival time control in heterarchical manufacturing systems
|
Prabhu, Vittaldas V. |
|
2000 |
32 |
4 |
p. 323-331 |
artikel |
19 |
Process setup adjustment with quadratic loss
|
Trietsch, Dan |
|
2000 |
32 |
4 |
p. 299-307 |
artikel |
20 |
Process setup adjustment with quadratic loss
|
DAN TRIETSCH |
|
2000 |
32 |
4 |
p. 299-307 9 p. |
artikel |
21 |
Process setup adjustment with quadratic loss
|
Trietsch, Dan |
|
2000 |
32 |
4 |
p. 299-307 |
artikel |
22 |
The fixture planning of modular fixtures for measurement
|
Lin, Zone-Ching |
|
2000 |
32 |
4 |
p. 345-359 |
artikel |
23 |
The fixture planning of modular fixtures for measurement
|
ZONE-CHING LIN |
|
2000 |
32 |
4 |
p. 345-359 15 p. |
artikel |
24 |
The fixture planning of modular fixtures for measurement
|
Lin, Zone-Ching |
|
2000 |
32 |
4 |
p. 345-359 |
artikel |