nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times
|
Rios-Mercado, Roger Z. |
|
1999 |
31 |
8 |
p. 721-731 |
artikel |
2 |
A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times
|
ROGER Z. RÍOS-MERCADO |
|
1999 |
31 |
8 |
p. 721-731 11 p. |
artikel |
3 |
A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times
|
RÍOS-MERCADO, ROGER Z. |
|
1999 |
31 |
8 |
p. 721-731 |
artikel |
4 |
A literature survey on planning and control of warehousing systems
|
BERG, JEROEN P. van den |
|
1999 |
31 |
8 |
p. 751-762 |
artikel |
5 |
A literature survey on planning and control of warehousing systems
|
JEROEN P. van den BERG |
|
1999 |
31 |
8 |
p. 751-762 12 p. |
artikel |
6 |
A literature survey on planning and control of warehousing systems
|
Van den Berg, JEROEN P. |
|
1999 |
31 |
8 |
p. 751-762 |
artikel |
7 |
An analytical comparison of long and short term contracts
|
Cohen, Morris A. |
|
1999 |
31 |
8 |
p. 783-796 |
artikel |
8 |
An analytical comparison of long and short term contracts
|
MORRIS A. COHEN |
|
1999 |
31 |
8 |
p. 783-796 14 p. |
artikel |
9 |
An analytical comparison of long and short term contracts
|
Cohen, MORRIS A. |
|
1999 |
31 |
8 |
p. 783-796 |
artikel |
10 |
A review of: “Decomposition Methods for Complex Factory Scheduling Problems” Irfan M. Ovacik and Reha Uzsoy KJuwer, ISBN 0-7923-9835-1
|
Pinedo, Mihcael |
|
1999 |
31 |
8 |
p. 797-798 |
artikel |
11 |
A review of: “Global Operations and Logistics: Texts and Cases” Philippe-Pierre Dornier, Ricardo Ernst, Michel Fender and Panos Kouvelis
|
cohen, Morris A. |
|
1999 |
31 |
8 |
p. 801-802 |
artikel |
12 |
A review of: “Logistics Engineering and Management, 5th edn” Benjamin S. Blanchard Prentice Hall, 1998, 526 pages, ISBN 0-13-905316-6
|
Wu, S. David |
|
1999 |
31 |
8 |
p. 798-801 |
artikel |
13 |
Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process
|
Golany, B. |
|
1999 |
31 |
8 |
p. 771-781 |
artikel |
14 |
Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process
|
B. GOLANY |
|
1999 |
31 |
8 |
p. 771-781 11 p. |
artikel |
15 |
Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process
|
Golany, B. |
|
1999 |
31 |
8 |
p. 771-781 |
artikel |
16 |
Cyclic scheduling in synchronous production lines
|
Kouvelis, Panos |
|
1999 |
31 |
8 |
p. 709-719 |
artikel |
17 |
Cyclic scheduling in synchronous production lines
|
PANOS KOUVELIS |
|
1999 |
31 |
8 |
p. 709-719 11 p. |
artikel |
18 |
Cyclic scheduling in synchronous production lines
|
Kouvelis, PANOS |
|
1999 |
31 |
8 |
p. 709-719 |
artikel |
19 |
Dry kiln scheduling in furniture production
|
Yaghubian, Arman R. |
|
1999 |
31 |
8 |
p. 733-738 |
artikel |
20 |
Dry kiln scheduling in furniture production
|
ARMAN R. YAGHUBIAN |
|
1999 |
31 |
8 |
p. 733-738 6 p. |
artikel |
21 |
Dry kiln scheduling in furniture production
|
Yaghubian, ARMAN R. |
|
1999 |
31 |
8 |
p. 733-738 |
artikel |
22 |
Experimental investigation of shared storage assignment policies in automated storage/retrieval systems
|
Kulturel, Sadan |
|
1999 |
31 |
8 |
p. 739-749 |
artikel |
23 |
Experimental investigation of shared storage assignment policies in automated storage/retrieval systems
|
SADAN KULTUREL |
|
1999 |
31 |
8 |
p. 739-749 11 p. |
artikel |
24 |
Experimental investigation of shared storage assignment policies in automated storage/retrieval systems
|
Kulturel, SADAN |
|
1999 |
31 |
8 |
p. 739-749 |
artikel |
25 |
Lot streaming and scheduling multiple products in two-machine no-wait flowshops
|
Sriskandarajah, C. |
|
1999 |
31 |
8 |
p. 695-707 |
artikel |
26 |
Lot streaming and scheduling multiple products in two-machine no-wait flowshops
|
C. SRISKANDARAJAH |
|
1999 |
31 |
8 |
p. 695-707 13 p. |
artikel |
27 |
Lot streaming and scheduling multiple products in two-machine no-wait flowshops
|
Sriskandarajah, C. |
|
1999 |
31 |
8 |
p. 695-707 |
artikel |
28 |
Solving an apparel trim placement problem using a maximum cover problem approach
|
Grinde, Roger B. |
|
1999 |
31 |
8 |
p. 763-769 |
artikel |
29 |
Solving an apparel trim placement problem using a maximum cover problem approach
|
ROGER B. GRINDE |
|
1999 |
31 |
8 |
p. 763-769 7 p. |
artikel |
30 |
Solving an apparel trim placement problem using a maximum cover problem approach
|
Grinde, ROGER B. |
|
1999 |
31 |
8 |
p. 763-769 |
artikel |