Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             24 results found
no title author magazine year volume issue page(s) type
1 Batching and scheduling to minimize the makespan in the two-machine flowshop Cheng, T. C. Edwin
1998
30 5 p. 447-453
article
2 Batching and scheduling to minimize the makespan in the two-machine flowshop T.C. EDWIN CHENG
1998
30 5 p. 447-453
7 p.
article
3 Batching and scheduling to minimize the makespan in the two-machine flowshop Cheng, T.C. Edwin
1998
30 5 p. 447-453
article
4 Greedy heuristics for rapid scheduling of trains on a single track Cai, X.
1998
30 5 p. 481-493
article
5 Greedy heuristics for rapid scheduling of trains on a single track X. CAI
1998
30 5 p. 481-493
13 p.
article
6 Greedy heuristics for rapid scheduling of trains on a single track Cai, X.
1998
30 5 p. 481-493
article
7 Production, operating risk and market uncertainty: a valuation perspective on controlled policies Kamrad, Bardia
1998
30 5 p. 455-468
article
8 Production, operating risk and market uncertainty: a valuation perspective on controlled policies BARDIA KAMRAD
1998
30 5 p. 455-468
14 p.
article
9 Production, operating risk and market uncertainty: a valuation perspective on controlled policies Kamrad, Bardia
1998
30 5 p. 455-468
article
10 Routing orderpickers in a warehouse: a comparison between optimal and heuristic solutions De Koster, Rene
1998
30 5 p. 469-480
article
11 Routing orderpickers in a warehouse: a comparison between optimal and heuristic solutions RENÉ DE KOSTER
1998
30 5 p. 469-480
12 p.
article
12 Routing orderpickers in a warehouse: a comparison between optimal and heuristic solutions Koster, RenÉ De
1998
30 5 p. 469-480
article
13 Scheduling with multiple-job-on-one-processor pattern Li, Chung-Lun
1998
30 5 p. 433-445
article
14 Scheduling with multiple-job-on-one-processor pattern CHUNG-LUN LI
1998
30 5 p. 433-445
13 p.
article
15 Scheduling with multiple-job-on-one-processor pattern Li, Chung-lun
1998
30 5 p. 433-445
article
16 Scope versus focus: issues of flexibility, capacity, and number of production facilities Benjaafar, Saifallah
1998
30 5 p. 413-425
article
17 Scope versus focus: issues of flexibility, capacity, and number of production facilities SAIFALLAH BENJAAFAR
1998
30 5 p. 413-425
13 p.
article
18 Scope versus focus: issues of flexibility, capacity, and number of production facilities Benjaafar, Saifallah
1998
30 5 p. 413-425
article
19 The impact of priority rule combinations on lateness and tardiness Barman, Samir
1998
30 5 p. 495-504
article
20 The impact of priority rule combinations on lateness and tardiness SAMIR BARMAN
1998
30 5 p. 495-504
10 p.
article
21 The impact of priority rule combinations on lateness and tardiness Barman, Samir
1998
30 5 p. 495-504
article
22 The multiple lot sizing problem with rigid demand and interrupted geometric yield Zhang, Alex X.
1998
30 5 p. 427-431
article
23 The multiple lot sizing problem with rigid demand and interrupted geometric yield ALEX X. ZHANG
1998
30 5 p. 427-431
5 p.
article
24 The multiple lot sizing problem with rigid demand and interrupted geometric yield Zhang, Alex X.
1998
30 5 p. 427-431
article
                             24 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands