nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A modular architecture for rapid development of CAPP systems for agile manufacturing
|
Feng, Shaw C. |
|
1998 |
30 |
10 |
p. 893-903 |
artikel |
2 |
A modular architecture for rapid development of CAPP systems for agile manufacturing
|
SHAW C. FENG |
|
1998 |
30 |
10 |
p. 893-903 11 p. |
artikel |
3 |
A modular architecture for rapid development of CAPP systems for agile manufacturing
|
Feng, Shaw C. |
|
1998 |
30 |
10 |
p. 893-903 |
artikel |
4 |
A modular, parametric vibratory feeder: a case study for flexible assembly tools for mass customization
|
Joneja, Ajay |
|
1998 |
30 |
10 |
p. 923-931 |
artikel |
5 |
A modular, parametric vibratory feeder: a case study for flexible assembly tools for mass customization
|
AJAY JONEJA |
|
1998 |
30 |
10 |
p. 923-931 9 p. |
artikel |
6 |
A modular, parametric vibratory feeder: a case study for flexible assembly tools for mass customization
|
Joneja, Ajay |
|
1998 |
30 |
10 |
p. 923-931 |
artikel |
7 |
A space partitioning method for facility layout problems with shape constraints
|
Kim, Jae-Gon |
|
1998 |
30 |
10 |
p. 947-957 |
artikel |
8 |
A space partitioning method for facility layout problemswith shape constraints
|
JAE-GON KIM |
|
1998 |
30 |
10 |
p. 947-957 11 p. |
artikel |
9 |
A space partitioning method for facility layout problemswith shape constraints
|
Kim, Jae-Gon |
|
1998 |
30 |
10 |
p. 947-957 |
artikel |
10 |
Blank design optimization on deep drawing of square shells
|
Gea, Hae Chang |
|
1998 |
30 |
10 |
p. 913-921 |
artikel |
11 |
Blank design optimization on deep drawing of square shells
|
HAE CHANG GEA |
|
1998 |
30 |
10 |
p. 913-921 9 p. |
artikel |
12 |
Blank design optimization on deep drawing of square shells
|
Gea, Hae Chang |
|
1998 |
30 |
10 |
p. 913-921 |
artikel |
13 |
Buffer capacity allocation for a desired throughput in production lines
|
Yamashita, Hideaki |
|
1998 |
30 |
10 |
p. 883-891 |
artikel |
14 |
Buffer capacity allocation for a desired throughput in production lines
|
HIDEAKI YAMASHITA |
|
1998 |
30 |
10 |
p. 883-892 10 p. |
artikel |
15 |
Buffer capacity allocation for a desired throughput in production lines
|
Yamashita, Hideaki |
|
1998 |
30 |
10 |
p. 883-892 |
artikel |
16 |
Destructive disassembly to support virtual prototyping
|
Lee, Kyonghun |
|
1998 |
30 |
10 |
p. 959-972 |
artikel |
17 |
Destructive disassembly to support virtual prototyping
|
KYONGHUN LEE |
|
1998 |
30 |
10 |
p. 959-972 14 p. |
artikel |
18 |
Destructive disassembly to support virtual prototyping
|
Lee, Kyonghun |
|
1998 |
30 |
10 |
p. 959-972 |
artikel |
19 |
Interlinking dimensional tolerances with geometric accuracy and surface finish in the process design and manufacture of precision machined components
|
Geddam, A. |
|
1998 |
30 |
10 |
p. 905-912 |
artikel |
20 |
Interlinking dimensional tolerances with geometric accuracy and surface finish in the process design and manufactureof precision machined components
|
A. GEDDAM |
|
1998 |
30 |
10 |
p. 905-912 8 p. |
artikel |
21 |
Interlinking dimensional tolerances with geometric accuracy and surface finish in the process design and manufactureof precision machined components
|
Geddam, A. |
|
1998 |
30 |
10 |
p. 905-912 |
artikel |
22 |
On the mean waiting time of a population constrained open tandem queueing network with constant service times
|
Rhee, Young |
|
1998 |
30 |
10 |
p. 973-979 |
artikel |
23 |
On the mean waiting time of a population constrained open tandem queueing network with constant service times
|
YOUNG RHEE |
|
1998 |
30 |
10 |
p. 973-979 7 p. |
artikel |
24 |
On the mean waiting time of a population constrained open tandem queueing network with constant service times
|
Rhee, Young |
|
1998 |
30 |
10 |
p. 973-979 |
artikel |
25 |
Optimal axis orientation for rectilinear minisum and minimax location
|
Drezner, Zvi |
|
1998 |
30 |
10 |
p. 981-986 |
artikel |
26 |
Optimal axis orientation for rectilinear minisum and minimax location
|
ZVI DREZNER |
|
1998 |
30 |
10 |
p. 981-986 6 p. |
artikel |
27 |
Optimal axis orientation for rectilinear minisum and minimax location
|
Drezner, Zvi |
|
1998 |
30 |
10 |
p. 981-986 |
artikel |
28 |
Planning repair effort in transfer lines
|
Dogan-Sahiner, Esra |
|
1998 |
30 |
10 |
p. 867-881 |
artikel |
29 |
Planning repair effort in transfer lines
|
ESRA DOGAN-SAHINER |
|
1998 |
30 |
10 |
p. 867-882 16 p. |
artikel |
30 |
Planning repair effort in transfer lines
|
Dogan-Sahiner, Esra |
|
1998 |
30 |
10 |
p. 867-882 |
artikel |
31 |
Product family-based assembly sequence design methodology
|
Gupta, Saurabh |
|
1998 |
30 |
10 |
p. 933-945 |
artikel |
32 |
Product family-based assembly sequence design methodology
|
SAURABH GUPTA |
|
1998 |
30 |
10 |
p. 933-945 13 p. |
artikel |
33 |
Product family-based assembly sequence design methodology
|
Gupta, Saurabh |
|
1998 |
30 |
10 |
p. 933-945 |
artikel |
34 |
Review of:“Modeling Techniques for Business Process Re-engineering and Benchmarking”Guy Doumeingts and Jim Browne (eds) Chapman & Hall, 1997
|
Jackman, John |
|
1998 |
30 |
10 |
p. 987-988 |
artikel |
35 |
Review of:“Rapid Analysis of Queuing Systems (RAQS)”Developed by: Professor Manjunath Kamath, Oklahoma
|
Heragu, Sunderesh S. |
|
1998 |
30 |
10 |
p. 989 |
artikel |
36 |
Review of:“Re-engineering for Sustainable Industrial Production”L.M. Camarinha-Matos (ed.) Chapman & Hall, 1997
|
Woo, T.C. |
|
1998 |
30 |
10 |
p. 987 |
artikel |