no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A greedy algorithm to determine the number of transporters in a cyclic electroplating process
|
Armstrong, Ronald |
|
1996 |
28 |
5 |
p. 347-355 |
article |
2 |
A structured procedure for analysis and design of order pick systems
|
Yoon, Chang S. |
|
1996 |
28 |
5 |
p. 379-389 |
article |
3 |
Co-production models with random functionality yields
|
Gerchak, Yigal |
|
1996 |
28 |
5 |
p. 391-403 |
article |
4 |
Estimating the parameters of the weighted l p norm by linear regression
|
Brimberg, Jack |
|
1996 |
28 |
5 |
p. 363-367 |
article |
5 |
Joint optimization of maintenance and inventory policies for a simple system
|
Armstrong, Michael J. |
|
1996 |
28 |
5 |
p. 415-424 |
article |
6 |
Large-scale classroom scheduling
|
Mooney, Edward L. |
|
1996 |
28 |
5 |
p. 369-378 |
article |
7 |
On production batches, transfer batches, and lead times
|
Benjaafar, Saifallah |
|
1996 |
28 |
5 |
p. 357-362 |
article |
8 |
The effects of work-in-process inventory costs on the design and scheduling of assembly lines with low throughput and high component costs
|
Rosenblatt, Meir J. |
|
1996 |
28 |
5 |
p. 405-414 |
article |
9 |
Tool handling and scheduling in a two-machine flexible manufacturing cell
|
Agnetis, Alessandro |
|
1996 |
28 |
5 |
p. 425-437 |
article |