nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
ANALYTICAL TOOLS FOR ASSEMBLY LINE DESIGN AND SEQUENCING
|
Rachamadugu, Ram M. V. |
|
1994 |
26 |
2 |
p. 2-11 |
artikel |
2 |
A NOTE ON HIERARCHICAL MINIMIZATION OF FLOWTIMES ON PARALLEL-MACHINES
|
Cheng, T. C. E. |
|
1994 |
26 |
2 |
p. 109-111 |
artikel |
3 |
DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINE
|
Lei, L. |
|
1994 |
26 |
2 |
p. 25-33 |
artikel |
4 |
DISCOUNTING DECISIONS IN A SUPPLIER-BUYER RELATIONSHIP WITH A LINEAR BUYER'S DEMAND
|
Parlar, Mahmut |
|
1994 |
26 |
2 |
p. 34-41 |
artikel |
5 |
IMPROVED MANPOWER UTILIZATION IN LIVE-RUN SHIFT OF NEWSPAPER PRINTING OPERATIONS
|
Kumar, Sameer |
|
1994 |
26 |
2 |
p. 62-75 |
artikel |
6 |
LOT SIZING IN ASSEMBLY SYSTEMS WITH RANDOM COMPONENT YIELDS
|
Gerchak, Yigal |
|
1994 |
26 |
2 |
p. 19-24 |
artikel |
7 |
MULTI-ITEM LOTSIZING IN CAPACITATED MULTI-STAGE SERIAL SYSTEMS
|
Billington, Peter |
|
1994 |
26 |
2 |
p. 12-18 |
artikel |
8 |
OPTIMAL LOT SIZES FOR UNIT AND SHIPPING DISCOUNT SITUATIONS
|
Tersine, Richard J. |
|
1994 |
26 |
2 |
p. 97-101 |
artikel |
9 |
ORDER EXPEDITION IN MULTI-ECHELON PRODUCTION/DISTRIBUTION SYSTEMS
|
Aggarwal, Prabhu K. |
|
1994 |
26 |
2 |
p. 86-96 |
artikel |
10 |
SINGLE-STAGE, MULTI-PRODUCT PRODUCTION/INVENTORY SYSTEMS WITH BACKORDERS
|
Altiok, Tayfur |
|
1994 |
26 |
2 |
p. 52-61 |
artikel |
11 |
THE EFFECTS OF INSPECTION ERRORS TO THE IMPERFECT EMQ MODEL
|
Liou, Ming-Jong |
|
1994 |
26 |
2 |
p. 42-51 |
artikel |
12 |
THE KANBAN ASSIGNMENT PROBLEM IN SERIAL JUST-IN-TIME PRODUCTION SYSTEMS
|
Co, Henry C. |
|
1994 |
26 |
2 |
p. 76-85 |
artikel |
13 |
THE OPTIMALITY OF THE “CUT ACROSS THE BOARD” RULE APPLIED TO AN INVENTORY MODEL
|
Rosenblatt, Meir J. |
|
1994 |
26 |
2 |
p. 102-108 |
artikel |