nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST
|
Steiner, George |
|
1993 |
25 |
5 |
p. 90-97 |
artikel |
2 |
DEALER INVENTORY MANAGEMENT SYSTEMS
|
Ernst, Ricardo |
|
1993 |
25 |
5 |
p. 36-49 |
artikel |
3 |
DETERMINISTIC APPROXIMATIONS FOR INVENTORY MANAGEMENT AT SERVICE FACILITIES
|
Berman, Oded |
|
1993 |
25 |
5 |
p. 98-104 |
artikel |
4 |
FOCUSED ISSUE ON SCHEDULING AND LOGISTICS POSITION STATEMENT
|
|
|
1993 |
25 |
5 |
p. 2-4 |
artikel |
5 |
MULTIPLE-SHIFT WORKFORCE SCHEDULING UNDER THE 3-4 COMPRESSED WORKWEEK WITH A HIERARCHICAL WORKFORCE
|
Hung, Rudy |
|
1993 |
25 |
5 |
p. 82-89 |
artikel |
6 |
NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
|
Drexl, Andreas |
|
1993 |
25 |
5 |
p. 74-81 |
artikel |
7 |
ON THE USE OF BUFFER INVENTORIES TO MINIMIZE COSTS WITH AN UNRELIABLE MACHINE
|
Klastorin, T. D. |
|
1993 |
25 |
5 |
p. 50-62 |
artikel |
8 |
PLANNING TIMELY ARRIVALS TO A STOCHASTIC PRODUCTION OR SERVICE SYSTEM
|
Liao, Chtng-Jong |
|
1993 |
25 |
5 |
p. 63-73 |
artikel |
9 |
PRODUCTION CONTROL FOR A TANDEM TWO-MACHINE SYSTEM
|
Van Ryzin, Garrett |
|
1993 |
25 |
5 |
p. 5-20 |
artikel |
10 |
PRODUCTION SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM WITH SETUPS
|
Ghosh, Soumen |
|
1993 |
25 |
5 |
p. 21-35 |
artikel |
11 |
THE COST OF FOLLOWING THE OPTIMAL INVENTORY POLICY
|
Robinson, Lawrence W. |
|
1993 |
25 |
5 |
p. 105-108 |
artikel |