no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
An Artificial Intelligence Approach to the Scheduling of Flexible Manufacturing Systems
|
Shaw, Michael J. |
|
1989 |
21 |
2 |
p. 170-183 |
article |
2 |
Approximate Analysis for the Merge Configuration of an Open Queueing Network with Blocking
|
Lee, Hyo-Seong |
|
1989 |
21 |
2 |
p. 122-129 |
article |
3 |
Balancing Cycle Time and Workstations
|
Deckro, Richard F. |
|
1989 |
21 |
2 |
p. 106-111 |
article |
4 |
Component Inventory Costs in an Assembly Problem with Uncertain Supplier Lead-Times
|
Kumar, Anurag |
|
1989 |
21 |
2 |
p. 112-121 |
article |
5 |
Control of Material Handling Transporter in Automated Manufacturing
|
Han, Min-Hong |
|
1989 |
21 |
2 |
p. 184-190 |
article |
6 |
Determination of Optimal Buffer Storage Capacities and Optimal Allocation in Multistage Automatic Transfer Lines
|
Jafari, Mohsen A. |
|
1989 |
21 |
2 |
p. 130-135 |
article |
7 |
Due Date Assignment in a Multistage Job Shop
|
Fry, Timothy D. |
|
1989 |
21 |
2 |
p. 153-161 |
article |
8 |
Economic Lot Scheduling for Two-Product Problem
|
Lee, Chung-Yee |
|
1989 |
21 |
2 |
p. 162-169 |
article |
9 |
Efficient Solutions to a Linear Programming Model for Production Scheduling With Capacity Constraints and No Initial Stock
|
McCLAIN, JOHN O. |
|
1989 |
21 |
2 |
p. 144-152 |
article |
10 |
Managing Quality, By David A. Garvin
|
Elmaghraby, Salah E. |
|
1989 |
21 |
2 |
p. 191-192 |
article |
11 |
Utilizing Cut Trees as Design Skeletons for Facility Layout
|
Montreuil, Benoit |
|
1989 |
21 |
2 |
p. 136-143 |
article |