nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Directly-Coupled Two-Stage Unpaced Line
|
Lau, Hon-Shiang |
|
1986 |
18 |
3 |
p. 304-312 |
artikel |
2 |
A Framework for Integrated Problem Solving in Manufacturing
|
De, Suranjan |
|
1986 |
18 |
3 |
p. 286-297 |
artikel |
3 |
A Mixed Integer Programming Model for Lot Sizing and Sequencing Packaging Lines in the Process Industries
|
Smith-Daniels, Vicki L. |
|
1986 |
18 |
3 |
p. 278-285 |
artikel |
4 |
Analysis of Multi-Robot Systems
|
Maimon, Oded |
|
1986 |
18 |
3 |
p. 226-234 |
artikel |
5 |
A Physiological Evaluation of Time Standards For Warehouse Operations as Set by Traditional Work Measurement Techniques
|
Garg, Arun |
|
1986 |
18 |
3 |
p. 235-245 |
artikel |
6 |
Application of the Similarity Coefficient Method in Group Technology
|
Seifoddini, Hamid |
|
1986 |
18 |
3 |
p. 271-277 |
artikel |
7 |
Approaches for Discrete Alternative Multiple Criteria Problems for Different Types of Criteria
|
Koksalan, Murat |
|
1986 |
18 |
3 |
p. 262-270 |
artikel |
8 |
A System for Manufacturing Scheduling with Interactive Computer Graphics
|
Jones, Christopher V. |
|
1986 |
18 |
3 |
p. 298-303 |
artikel |
9 |
Biomechanical And Ergonomic Stresses In Warehouse Operations
|
Garg, Arun |
|
1986 |
18 |
3 |
p. 246-250 |
artikel |
10 |
Comparative Analyses of Fixed and Removable Item Mixed Model Assembly Lines
|
Wang, Fangzhi |
|
1986 |
18 |
3 |
p. 313-317 |
artikel |
11 |
Open Networks of Queues with Blocking: Split and Merge Configurations:
|
Altiok, Tayfur |
|
1986 |
18 |
3 |
p. 251-261 |
artikel |
12 |
The Economic Order Quantity for Freight Discount Costs
|
Lee, Chung-Yee |
|
1986 |
18 |
3 |
p. 318-320 |
artikel |