nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Comparative Study of Continuous and Periodic Inspection Policies in Deteriorating Production Systems
|
Rosenblatt, Meir J. |
|
1986 |
18 |
1 |
p. 2-9 |
artikel |
2 |
A Heuristic for Multiple Lot Sizing For an Order Under Variable Yield
|
Sepehri, Mehran |
|
1986 |
18 |
1 |
p. 63-69 |
artikel |
3 |
An Evaluation Model for Quantifying System Value
|
Pienaar, Abre |
|
1986 |
18 |
1 |
p. 10-15 |
artikel |
4 |
A New Approach to Aggregate Production Planning
|
Akinc, Umit |
|
1986 |
18 |
1 |
p. 88-94 |
artikel |
5 |
A Search Performance Test for Visual Lobe Size
|
Courtney, Alan J. |
|
1986 |
18 |
1 |
p. 56-62 |
artikel |
6 |
A Statistical Methodology for the Analysis of the Life-Cycle of Reusable Containers
|
Goh, T. N. |
|
1986 |
18 |
1 |
p. 42-47 |
artikel |
7 |
Comments on a DP Model for The Optimal Inspection Strategy
|
Elmaghraby, Salah E. |
|
1986 |
18 |
1 |
p. 104-108 |
artikel |
8 |
Control Charts Using Coupled Exponentially Weighted Moving Averages
|
Sweet, Arnold L. |
|
1986 |
18 |
1 |
p. 26-33 |
artikel |
9 |
Cost-Minimization Model for Reducing Sulphur Dioxide Emission from Coal-Fired Generating Stations
|
Bookbinder, James H. |
|
1986 |
18 |
1 |
p. 34-41 |
artikel |
10 |
Design for Line Flexibility
|
Chow, We-Min |
|
1986 |
18 |
1 |
p. 95-103 |
artikel |
11 |
Economic Production Cycles with Imperfect Production Processes
|
Rosenblatt, Meir J. |
|
1986 |
18 |
1 |
p. 48-55 |
artikel |
12 |
Evaluating a Modified Heuristic for the Multiple-Vehicle Scheduling Problem
|
Benton, W. C. |
|
1986 |
18 |
1 |
p. 70-78 |
artikel |
13 |
Guest Reviewers for 1985
|
|
|
1986 |
18 |
1 |
p. 109-111 |
artikel |
14 |
On Spending Money
|
Kabak, Irwin W. |
|
1986 |
18 |
1 |
p. 79-87 |
artikel |
15 |
Simulated Versus Real Life Data in Testing the Efficiency of Scheduling Algorithms
|
Amar, Amar Dev |
|
1986 |
18 |
1 |
p. 16-25 |
artikel |