nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Deterministic Repair Model for Goods-Producing Equipment
|
Shanker, Kripa |
|
1984 |
16 |
3 |
p. 240-247 |
artikel |
2 |
A Location-Allocation Model for a Two-Echelon Repair-Inventory System
|
Vrat, Singh Prem |
|
1984 |
16 |
3 |
p. 222-228 |
artikel |
3 |
An Algorithm for NC Turret Punch Press Tool Location and Hit Sequencing
|
Walas, Robert A. |
|
1984 |
16 |
3 |
p. 280-287 |
artikel |
4 |
An Instructive Exercise in Dynamic Programming
|
Dixon, P. |
|
1984 |
16 |
3 |
p. 292-294 |
artikel |
5 |
A Tightened m-Level Continuous Sampling Plan for Markov-Dependent Production Processes
|
Kumar, V. S. Sampath |
|
1984 |
16 |
3 |
p. 257-261 |
artikel |
6 |
Availability Model of Periodically Tested Standby Combustion Turbine Units
|
Sim, S. H. |
|
1984 |
16 |
3 |
p. 288-291 |
artikel |
7 |
Book Reviews
|
Gangwar, Anshumali |
|
1984 |
16 |
3 |
p. 295 |
artikel |
8 |
Expected Performance of Some Lot-Sizing Heuristics in a Rolling-Schedule Environment
|
Huang, H. C. |
|
1984 |
16 |
3 |
p. 248-256 |
artikel |
9 |
Matrix-Flowgraph Methods with Applications to the Analysis of Systems Whose Missions are of Uncertain Duration
|
John, Bryant |
|
1984 |
16 |
3 |
p. 271-279 |
artikel |
10 |
On Optimizing Bin Picking and Insertion Plans for Assembly Robots
|
Drezner, Zvi |
|
1984 |
16 |
3 |
p. 262-270 |
artikel |
11 |
Prototype models for two-dimensional layout design of robot systems
|
Sarin, S. C. |
|
1984 |
16 |
3 |
p. 206-215 |
artikel |
12 |
Quadratic Approximation to Linear Loss Integrals for Some Non-Normal Distributions
|
Das, Chandrasekhar |
|
1984 |
16 |
3 |
p. 195-205 |
artikel |
13 |
Scheduling Nurses Using Goal-Programming Techniques
|
Musa, A. A. |
|
1984 |
16 |
3 |
p. 216-221 |
artikel |
14 |
Some Comparative and Design Aspects of Series Production Systems
|
Sarker, Bhaba R. |
|
1984 |
16 |
3 |
p. 229-239 |
artikel |