nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Adaptive Smoothing for Forecasting Seasonal Series
|
Sweet, Arnold L. |
|
1981 |
13 |
3 |
p. 243-248 |
artikel |
2 |
A Fuzzy Sets Approach to Information Retrieval from A Criminal History Data Base
|
Dube, Rajesh |
|
1981 |
13 |
3 |
p. 212-222 |
artikel |
3 |
An Integrated CAD/Automated Process Planning System
|
Chang, Tien-Chien |
|
1981 |
13 |
3 |
p. 223-233 |
artikel |
4 |
Availability Characteristics of an Unbalanced Buffered Series Production System With Repair Priority
|
Bryant, John L. |
|
1981 |
13 |
3 |
p. 249-257 |
artikel |
5 |
Book Reviews
|
Tabucanon, M. T. |
|
1981 |
13 |
3 |
p. 283-284 |
artikel |
6 |
Combining Cycle Determination with Forward Time Calculations in Deterministic Activity Networks
|
Rhodes, Ben T. |
|
1981 |
13 |
3 |
p. 206-211 |
artikel |
7 |
Economical Quality Control Policies for a Single Cause System
|
Saniga, Erwin M. |
|
1981 |
13 |
3 |
p. 258-264 |
artikel |
8 |
Formulas for Computing the Moments of Stochastic Lead Time Demand
|
Wan, Wei-Xun |
|
1981 |
13 |
3 |
p. 281-282 |
artikel |
9 |
Initialization of Exponential Smoothing Forecasts
|
Taylor, Sam G. |
|
1981 |
13 |
3 |
p. 199-205 |
artikel |
10 |
Optimization of the Second-Order Logarithmic Machining Economics Problem by Extended Geometric Programming Part II: Posynomial Constraints
|
Hough, Clarence L. |
|
1981 |
13 |
3 |
p. 234-242 |
artikel |
11 |
The Escalating Stockout Cost Problem
|
Kennedy, W. J. |
|
1981 |
13 |
3 |
p. 277-280 |
artikel |
12 |
The Long Term Effectiveness of Expected Net Present Value Maximization in an Environment of Incomplete and Uncertain Information
|
Oakford, R. V. |
|
1981 |
13 |
3 |
p. 265-276 |
artikel |