nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An Improved Extended Basic Period Procedure for Solving the Economic Lot Scheduling Problem
|
Haessler, Robert W. |
|
1979 |
11 |
4 |
p. 336-340 |
artikel |
2 |
Approximate Optimal Solution for a D-Policy in an M/G/X Queuing System
|
Sivazlian, B. D. |
|
1979 |
11 |
4 |
p. 341-343 |
artikel |
3 |
A Problem of Assigning Suppliers to Plants
|
Murphy, Richard A. |
|
1979 |
11 |
4 |
p. 303-307 |
artikel |
4 |
Conveyor Theory: A Survey
|
Muth, Eginhard J. |
|
1979 |
11 |
4 |
p. 270-277 |
artikel |
5 |
Heuristic Procedures for the Single Operation, Multi-Item Loading Problem
|
Lambrecht, M. R. |
|
1979 |
11 |
4 |
p. 319-326 |
artikel |
6 |
Justification for Installing Buffer Stocks in Unbalanced Two Stage Automatic Transfer Lines
|
Okamura, Kenjiro |
|
1979 |
11 |
4 |
p. 308-312 |
artikel |
7 |
Lower Bound Solutions to Multi-Stage Production Scheduling Problems with Startup Delays
|
Bigham, P. E. |
|
1979 |
11 |
4 |
p. 313-318 |
artikel |
8 |
Note on: An Order Level Lot Size Inventory Model for Deteriorating Items by Y. K. Shah
|
Aggarwal, S. P. |
|
1979 |
11 |
4 |
p. 344-346 |
artikel |
9 |
Performance Effects of Variables in Dynamic Visual Inspection
|
Rizzi, Anthony M. |
|
1979 |
11 |
4 |
p. 278-285 |
artikel |
10 |
Staff Scheduling with Day-Off and Workstretch Constraints
|
Baker, Kenneth R. |
|
1979 |
11 |
4 |
p. 286-292 |
artikel |
11 |
Stoop or Squat: A Biomechanical and Metabolic Evaluation
|
Garg, Arun |
|
1979 |
11 |
4 |
p. 293-302 |
artikel |
12 |
Using Utility Functions for Aggregate Scheduling in Health Maintenance Organizations (HMO'S)
|
Vargas, Gustavo |
|
1979 |
11 |
4 |
p. 327-335 |
artikel |