nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Data processing Model of IEC 61499 Function Blocks with Integer-Valued Data Types
|
Gerber, Christian |
|
2008 |
41 |
3 |
p. 175-180 6 p. |
artikel |
2 |
A Genetic Algorithm for Replenishment of Two-Level Assembly Systems
|
Hnaien, Faicel |
|
2008 |
41 |
3 |
p. 151-156 6 p. |
artikel |
3 |
Agent Approach for Transportation Modelling and Optimisation
|
Kozlak, Jaroslaw |
|
2008 |
41 |
3 |
p. 14-19 6 p. |
artikel |
4 |
Agent Environment for Supply Chain Modelling and Management
|
Nawarecki, Edward |
|
2008 |
41 |
3 |
p. 9-13 5 p. |
artikel |
5 |
A Model of a Quality Control for Integrated Manufacturing Systems
|
Korytkowski, P. |
|
2008 |
41 |
3 |
p. 187-192 6 p. |
artikel |
6 |
A Multi-Objective Approach for Transfer Line Optimization
|
Makdessian, Lina |
|
2008 |
41 |
3 |
p. 205-210 6 p. |
artikel |
7 |
An Automatic Method to Identify Human Alternative Movement Application to the Ingress Movement
|
El Menceur M-O, Ait |
|
2008 |
41 |
3 |
p. 75-80 6 p. |
artikel |
8 |
Application of Uncertain Variables to Production Planning in a Class of Manufacturing Systems
|
Gasior, Dariusz |
|
2008 |
41 |
3 |
p. 112-117 6 p. |
artikel |
9 |
A Road-map to the Implementation of Advanced ICTs in Maintenance Organization
|
Elefante, Danilo |
|
2008 |
41 |
3 |
p. 263-268 6 p. |
artikel |
10 |
Basics of Modelling IEC 61499 Function Blocks with Integer-Valued Data Types
|
Ivanova-Vasileva, Ioanna |
|
2008 |
41 |
3 |
p. 169-174 6 p. |
artikel |
11 |
Benchmarking of ERP Systems Implementation: Case Study
|
Klos, S. |
|
2008 |
41 |
3 |
p. 52-57 6 p. |
artikel |
12 |
Capturing Product Development Knowledge with Task Patterns: Approach and Economic Effects
|
Sandkuhl, Kurt |
|
2008 |
41 |
3 |
p. 58-63 6 p. |
artikel |
13 |
Challenges in the Development of an E-Maintenance System
|
Adgar, Adam |
|
2008 |
41 |
3 |
p. 257-262 6 p. |
artikel |
14 |
CNC Machine Scheduling Problems with the Tool Aging
|
Janiak, Adam |
|
2008 |
41 |
3 |
p. 122-126 5 p. |
artikel |
15 |
Contribution for an Optimal Choice of Business and Maintenance Plans, Based on an Adaptive Failure Law
|
SCHUTZ, Jérémie |
|
2008 |
41 |
3 |
p. 216-221 6 p. |
artikel |
16 |
Deadlock freeness supervisor for Marked Graph
|
Hatem, Sioud |
|
2008 |
41 |
3 |
p. 145-150 6 p. |
artikel |
17 |
Decision Control System for HSM*
|
Vallejo, Antonio Jr |
|
2008 |
41 |
3 |
p. 70-74 5 p. |
artikel |
18 |
Designing Structure of Operations of Technological Ppocess of Machining Shafts in CIM Considering the Technological Inheritance
|
Witold, Halas |
|
2008 |
41 |
3 |
p. 181-186 6 p. |
artikel |
19 |
Discovery of Knowledge in Electrical Power systems *
|
Jedrzejec, Bartosz |
|
2008 |
41 |
3 |
p. 40-45 6 p. |
artikel |
20 |
3D Laser Scanning in Digitization of Current Production Systems
|
Gregor, Prof.Ing. Milan |
|
2008 |
41 |
3 |
p. 86-93 8 p. |
artikel |
21 |
Early Detection of Bearing Damage by Means of Decision Trees
|
Kilundu, Bovic |
|
2008 |
41 |
3 |
p. 211-215 5 p. |
artikel |
22 |
Evaluating the Role of Maintenance Maturity in Adoption of New ICT in the Process Industry
|
Fumagalli, Luca |
|
2008 |
41 |
3 |
p. 251-256 6 p. |
artikel |
23 |
Front cover
|
|
|
2008 |
41 |
3 |
p. i-xi nvt p. |
artikel |
24 |
Improving Digital Interaction for Operator-Driven Process-Plant Operation
|
DOBRE Gérard, Dragoş |
|
2008 |
41 |
3 |
p. 94-99 6 p. |
artikel |
25 |
Increasing Flexibility and Availability of Manufacturing Systems - Dynamic Reconfiguration of Automation Software at Runtime on Sensor Faults
|
Wannagat, A. |
|
2008 |
41 |
3 |
p. 278-283 6 p. |
artikel |
26 |
Integrated Approach for Design of Machining Systems
|
Dolgui, A. |
|
2008 |
41 |
3 |
p. 302-307 6 p. |
artikel |
27 |
Intelligent Control of Power Generation States
|
Bakhtadze, Natalia N. |
|
2008 |
41 |
3 |
p. 1-8 8 p. |
artikel |
28 |
Intelligent Monitoring of an Industrial Robot
|
FAWAZ, K. |
|
2008 |
41 |
3 |
p. 139-144 6 p. |
artikel |
29 |
Intelligent Robotic Multisensorial System to Build Metallic Structures
|
Corrales, J.A. |
|
2008 |
41 |
3 |
p. 133-138 6 p. |
artikel |
30 |
Inversion of Fuzzy Neural Networks for the Reduction of Noise in the Control Loop
|
Nentwig, Mirko |
|
2008 |
41 |
3 |
p. 157-162 6 p. |
artikel |
31 |
Knowledge based and CLP-driven approach to multi product small-size production flow
|
Bach, I. |
|
2008 |
41 |
3 |
p. 32-39 8 p. |
artikel |
32 |
Machine-Part Grouping and Cluster Analysis
|
Owsinski, Jan W. |
|
2008 |
41 |
3 |
p. 296-301 6 p. |
artikel |
33 |
MAINTENANCE STRATEGY DEVELOPMENT WITHIN SME'S: THE DEVELOPMENT OF AN INTEGRATED APPROACH
|
Baglee, David |
|
2008 |
41 |
3 |
p. 222-227 6 p. |
artikel |
34 |
Maintenance Strategy Selection: a comparison between Fuzzy Logic and Analytic Hierarchy Process
|
Ierace, Stefano |
|
2008 |
41 |
3 |
p. 228-233 6 p. |
artikel |
35 |
Milling Strategy Prediction with SOM Neural Network
|
Klancnik, S. |
|
2008 |
41 |
3 |
p. 163-168 6 p. |
artikel |
36 |
Modular Modeling of Maintenance Activities for Multi-Sites Structure
|
Ahmad, ALALI ALHOUAIJ |
|
2008 |
41 |
3 |
p. 269-277 9 p. |
artikel |
37 |
Multi-objective Optimization of Dependability Attributes Using An Asynchronous Heterogeneous Hierarchical Parallel Genetic Algorithm
|
Wenhua, Zeng |
|
2008 |
41 |
3 |
p. 199-204 6 p. |
artikel |
38 |
Neural Networks as Classification Models in Intelligent CAPP Systems
|
Rojek, Izabela |
|
2008 |
41 |
3 |
p. 64-69 6 p. |
artikel |
39 |
New Maintenance Opportunities in Legacy Plants
|
Tucci, Mario |
|
2008 |
41 |
3 |
p. 234-238 5 p. |
artikel |
40 |
Ontology-Based Knowledge Sharing in Flexible Supply Networks
|
Smirnov, Alexander |
|
2008 |
41 |
3 |
p. 46-51 6 p. |
artikel |
41 |
OVERVIEW ON OPPORTUNISTIC MAINTENANCE
|
Thomas, Édouard |
|
2008 |
41 |
3 |
p. 245-250 6 p. |
artikel |
42 |
OWL Ontology to Support Evolvable Assembly Systems
|
Ribeiro, Luis |
|
2008 |
41 |
3 |
p. 290-295 6 p. |
artikel |
43 |
Review, Classification and Comparative Analysis of Maintenance Management Models
|
Campos, Mónica López |
|
2008 |
41 |
3 |
p. 239-244 6 p. |
artikel |
44 |
RFID-IMSII Methodology for the Management of a Real Factory Simulation Connected with a Physical Platform
|
Encinas, J.C. |
|
2008 |
41 |
3 |
p. 100-105 6 p. |
artikel |
45 |
Scheduling of Unit-time Jobs with Distinct Due Windows on Parallel Processors
|
Janiak, Adam |
|
2008 |
41 |
3 |
p. 118-121 4 p. |
artikel |
46 |
Simulated Annealing with Adaptive Neighborhood Applied to the Placement over Containers with Fixed Dimensions
|
de Castro Martins, Thiago |
|
2008 |
41 |
3 |
p. 106-111 6 p. |
artikel |
47 |
Specification of a Device Interface for Service-Oriented Automation Control Components
|
Barbosa, José |
|
2008 |
41 |
3 |
p. 284-289 6 p. |
artikel |
48 |
Specificity of Bottlenecks in Conditions of Unit and Small-Batch Production
|
Matuszek, J. |
|
2008 |
41 |
3 |
p. 26-31 6 p. |
artikel |
49 |
Stiffness Analysis Of Multi-Chain Parallel Robotic Systems
|
Pashkevich, Anatol |
|
2008 |
41 |
3 |
p. 127-132 6 p. |
artikel |
50 |
The Modelling and Simulation Method in Computer Aided Cooperation
|
Matuszek, Józef |
|
2008 |
41 |
3 |
p. 20-25 6 p. |
artikel |
51 |
Towards a Holistic Approach for Intelligent Manufacturing Systems Synthesis
|
Stanescu, Aurelian |
|
2008 |
41 |
3 |
p. 193-198 6 p. |
artikel |
52 |
Virtual Manufacturing in Research & Industry
|
Ŝtefánik, Ing. Andrej |
|
2008 |
41 |
3 |
p. 81-85 5 p. |
artikel |