nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Branch and Bound Method for the Scheduling of a Two-Robot Assembly Cell
|
Coupez, D. |
|
1989 |
22 |
14 |
p. 95-98 4 p. |
artikel |
2 |
A Periodic Job Shop Model
|
Serafini, P. |
|
1989 |
22 |
14 |
p. 89-94 6 p. |
artikel |
3 |
Author Index
|
|
|
1989 |
22 |
14 |
p. 139- 1 p. |
artikel |
4 |
Data Integration for Quality Assurance in Computer Integrated Manufacturing
|
Tou, J.T. |
|
1989 |
22 |
14 |
p. 125-131 7 p. |
artikel |
5 |
Decision Architecture for Scheduling Virtual Cellular Manufacturing Systems
|
Drolet, J.R. |
|
1989 |
22 |
14 |
p. 99-103 5 p. |
artikel |
6 |
Effect of Uncertainties and Material Flow Constraints in Manufacturing Systems Control
|
Akella, R. |
|
1989 |
22 |
14 |
p. 17-22 6 p. |
artikel |
7 |
Factory Automation (FA) for Multi-Spec. Order Entry Production Systems
|
Inoue, H. |
|
1989 |
22 |
14 |
p. 119-124 6 p. |
artikel |
8 |
Hierarchical Scheduling of Flexible Manufacturing Systems
|
Kaltwasser, J. |
|
1989 |
22 |
14 |
p. 111-118 8 p. |
artikel |
9 |
Hybrid Knowledge-Based Systems for Industrial Scheduling
|
Hindi, K.S. |
|
1989 |
22 |
14 |
p. 63-68 6 p. |
artikel |
10 |
Introduction
|
Villa, A. |
|
1989 |
22 |
14 |
p. 1-3 3 p. |
artikel |
11 |
Just-in-time Scheduling in a Pipeline Manufacturing System
|
Agnetis, A. |
|
1989 |
22 |
14 |
p. 81-87 7 p. |
artikel |
12 |
Keyword Index
|
|
|
1989 |
22 |
14 |
p. 141- 1 p. |
artikel |
13 |
On the Evaluation of Organizational Structures of Manufacturing Plants
|
El Mhamedi, A. |
|
1989 |
22 |
14 |
p. 51-56 6 p. |
artikel |
14 |
Optimization Aspects of Experimental FMS at the Technical University of Budapest (TUB)
|
Somló, J. |
|
1989 |
22 |
14 |
p. 75-80 6 p. |
artikel |
15 |
Outline of an Environment for the Specification and Prototyping of Scheduling and Control Systems for Manufacturing
|
Brandimarte, P. |
|
1989 |
22 |
14 |
p. 23-29 7 p. |
artikel |
16 |
Performance Evaluation of Cellular Flexible Manufacturing Systems: A Decomposition Approach
|
Ram, R. |
|
1989 |
22 |
14 |
p. 37-44 8 p. |
artikel |
17 |
Planning the Workpiece Populations in Flexible Manufacturing Systems by Means of Approximate Performance Analysis
|
Aicardi, M. |
|
1989 |
22 |
14 |
p. 45-49 5 p. |
artikel |
18 |
Preface
|
Villa, Agostino |
|
1989 |
22 |
14 |
p. vii- 1 p. |
artikel |
19 |
Process Planning: A Knowledge-Based and Optimization Perspective
|
Kusiak, A. |
|
1989 |
22 |
14 |
p. 133-138 6 p. |
artikel |
20 |
Production Scheduling in Automated Manufacturing Via a Computer-Hierarchy—Results of a Pilot Plant
|
Warnecke, H.J. |
|
1989 |
22 |
14 |
p. 105-109 5 p. |
artikel |
21 |
Recent Developments in Perturbation Analysis
|
Ho, Y.C. |
|
1989 |
22 |
14 |
p. 5-10 6 p. |
artikel |
22 |
Sagasse-An Expert System Based Simulator for Flexible Manufacturing Systems
|
Besombes, B. |
|
1989 |
22 |
14 |
p. 31-36 6 p. |
artikel |
23 |
Self Modification of Scheduling in Production
|
Watanabe, T. |
|
1989 |
22 |
14 |
p. 69-74 6 p. |
artikel |
24 |
Synthesis of Feedback Control for Forbidden State Problems in Discrete Manufacturing Systems
|
Holloway, L.E. |
|
1989 |
22 |
14 |
p. 11-16 6 p. |
artikel |
25 |
The Scheduler's Desk—Can it be Automated?
|
McKay, K.N. |
|
1989 |
22 |
14 |
p. 57-61 5 p. |
artikel |