nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A framework to develop an analysis agent for evaluating human performance in manufacturing systems
|
Shahrokhi, M. |
|
2009 |
2 |
1 |
p. 55-60 6 p. |
artikel |
2 |
A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
|
Sun, Hainan |
|
2009 |
2 |
1 |
p. 29-34 6 p. |
artikel |
3 |
An investigation of quality in CO2 laser cutting of aluminum
|
Stournaras, A. |
|
2009 |
2 |
1 |
p. 61-69 9 p. |
artikel |
4 |
Contents
|
|
|
2009 |
2 |
1 |
p. CO4- 1 p. |
artikel |
5 |
Corporate Membership in CIRP
|
|
|
2009 |
2 |
1 |
p. I- 1 p. |
artikel |
6 |
5-DOF harmonic frequency control using contactless magnetic guides
|
Denkena, B. |
|
2009 |
2 |
1 |
p. 21-28 8 p. |
artikel |
7 |
4D ultrasonic measurements—A new approach using mechanical image dissection techniques
|
Schmitt, R. |
|
2009 |
2 |
1 |
p. 8-12 5 p. |
artikel |
8 |
Editorial Board
|
|
|
2009 |
2 |
1 |
p. CO2- 1 p. |
artikel |
9 |
Extension of cutting force formulae for microcutting
|
Fleischer, J. |
|
2009 |
2 |
1 |
p. 75-80 6 p. |
artikel |
10 |
Guide for Authors
|
|
|
2009 |
2 |
1 |
p. CO3- 1 p. |
artikel |
11 |
Investigation on capability of the reaming process using minimal quantity lubrication
|
De Chiffre, Leonardo |
|
2009 |
2 |
1 |
p. 47-54 8 p. |
artikel |
12 |
Process planning for IT-equipment remanufacturing
|
Kernbaum, Sebastian |
|
2009 |
2 |
1 |
p. 13-20 8 p. |
artikel |
13 |
State of art in standardization in GPS area
|
Humienny, Zbigniew |
|
2009 |
2 |
1 |
p. 1-7 7 p. |
artikel |
14 |
The cause of the uncertainty of the elastic limit
|
Prohászka, J. |
|
2009 |
2 |
1 |
p. 70-74 5 p. |
artikel |
15 |
Virtual meshing simulation for gear conformity verification
|
Vincent, Jean-Paul |
|
2009 |
2 |
1 |
p. 35-46 12 p. |
artikel |