nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Accounting versus economic valuation in a simple inventory model
|
Norstrøm, Carl J. |
|
1988 |
|
3 |
p. 229-232 4 p. |
artikel |
2 |
A computer-aided single machine batch scheduling system
|
Peach, K.N. |
|
1989 |
|
3 |
p. 221-231 11 p. |
artikel |
3 |
A computer-automated statistical process control method with timely response
|
Papadakis, Emmanuel P. |
|
1990 |
|
3 |
p. 301-310 10 p. |
artikel |
4 |
A constant lot size model with equal and unequal sized batch shipments between production stages
|
Goyal, S.K. |
|
1986 |
|
3 |
p. 203-210 8 p. |
artikel |
5 |
A dynamic cost function for an airframe production program
|
Womer, Norman K. |
|
1983 |
|
3 |
p. 213-227 15 p. |
artikel |
6 |
A flexible multiobjective production planning framework for automated manufacturing systems
|
O'Grady, P.J. |
|
1984 |
|
3 |
p. 189-198 10 p. |
artikel |
7 |
A multiple objective programming framework for tradeoffs in project scheduling
|
Deckro, Richard F. |
|
1990 |
|
3 |
p. 255-264 10 p. |
artikel |
8 |
Analysis of capital investment: A conceptual cash flow model
|
Persson, Ingvar |
|
1990 |
|
3 |
p. 277-284 8 p. |
artikel |
9 |
Analysis of product quality determination process in developing countries using an empirical model
|
Goonatilake, P.C.L. |
|
1983 |
|
3 |
p. 229-234 6 p. |
artikel |
10 |
An EOQ model for items with stock dependent consumption rate and exponential decay
|
Padmanabhan, G. |
|
1990 |
|
3 |
p. 241-246 6 p. |
artikel |
11 |
A network flow approach to optimal slack due-date determination
|
Quaddus, M.A. |
|
1990 |
|
3 |
p. 265-267 3 p. |
artikel |
12 |
A new approach to the dynamic lot size model
|
Chyr, Fuchiao |
|
1990 |
|
3 |
p. 255-263 9 p. |
artikel |
13 |
A note on the economic replenishment interval for an item with a linear trend in demand
|
Goyal, Suresh |
|
1986 |
|
3 |
p. 253-255 3 p. |
artikel |
14 |
A physical system theory approach to material flow and productivity analysis
|
Singh, Sushil N. |
|
1988 |
|
3 |
p. 207-215 9 p. |
artikel |
15 |
A planning method of production for an iron industry through the analysis of the break even point
|
Poiaga, Luigi |
|
1988 |
|
3 |
p. 175-182 8 p. |
artikel |
16 |
A short-cycle product aggregate planning model incorporating improvement curve productivity
|
Khoshnevis, Behrokh |
|
1986 |
|
3 |
p. 217-233 17 p. |
artikel |
17 |
A simple algorithm for determining the optimum policy for jointly replenished items
|
Goyal, S.K. |
|
1987 |
|
3 |
p. 147-150 4 p. |
artikel |
18 |
Author index
|
|
|
1991 |
|
3 |
p. 303- 1 p. |
artikel |
19 |
Author index
|
|
|
1990 |
|
3 |
p. 317- 1 p. |
artikel |
20 |
Author index
|
|
|
1990 |
|
3 |
p. 321- 1 p. |
artikel |
21 |
Bicriterion jobshop scheduling with total flowtime and sum of squared lateness
|
Dileepan, Parthasarati |
|
1991 |
|
3 |
p. 295-299 5 p. |
artikel |
22 |
Capacity allocation and material flow in planning group technology cells
|
Shtub, Avraham |
|
1988 |
|
3 |
p. 217-228 12 p. |
artikel |
23 |
Capital budgeting and plant capacity
|
Krinsky, Itzhak |
|
1991 |
|
3 |
p. 233-241 9 p. |
artikel |
24 |
Characterization of production-inventory systems in the hungarian industry
|
Chikán, Attila |
|
1990 |
|
3 |
p. 285-292 8 p. |
artikel |
25 |
Comparing cost estimates of processes at different stages of development
|
Klumpar, Ivan V. |
|
1988 |
|
3 |
p. 183-188 6 p. |
artikel |
26 |
Comparison between just-in-time and EOQ system
|
Chyr, Fuchiao |
|
1990 |
|
3 |
p. 233-240 8 p. |
artikel |
27 |
Complexity of single model assembly line balancing problems
|
Bhattacharjee, T.K. |
|
1990 |
|
3 |
p. 203-214 12 p. |
artikel |
28 |
Computer-Aided Design— A new tool for the cost engineer?
|
Westney, Richard E. |
|
1983 |
|
3 |
p. 205-212 8 p. |
artikel |
29 |
Computer aided licence selection
|
Forgò, Ferenc |
|
1987 |
|
3 |
p. 161-170 10 p. |
artikel |
30 |
Corrigendum
|
Cheng, T.C.E. |
|
1987 |
|
3 |
p. 181- 1 p. |
artikel |
31 |
Cost and price indices
|
Boyd, Norman |
|
1984 |
|
3 |
p. 137-144 8 p. |
artikel |
32 |
Cost and price indices
|
Boyd, Norman |
|
1988 |
|
3 |
p. 157-168 12 p. |
artikel |
33 |
Cost and price indices
|
Boyd, Norman |
|
1987 |
|
3 |
p. 125-131 7 p. |
artikel |
34 |
Cost and price indices
|
Boyd, Norman |
|
1983 |
|
3 |
p. 175-186 12 p. |
artikel |
35 |
Cost and price indices
|
Boyd, Norman |
|
1986 |
|
3 |
p. 189-201 13 p. |
artikel |
36 |
Cost-benefit analysis of quality circles
|
Turban, Efraim |
|
1984 |
|
3 |
p. 199-209 11 p. |
artikel |
37 |
Costs of production in the Shenzhen special economic zone of China
|
Chan, J.C.M. |
|
1988 |
|
3 |
p. 199-209 11 p. |
artikel |
38 |
Dairy of events
|
|
|
1984 |
|
3 |
p. 235-236 2 p. |
artikel |
39 |
Decision and risk analysis for construction management
|
Rose, Aaron |
|
1983 |
|
3 |
p. 243- 1 p. |
artikel |
40 |
Design of a model generator for simulation in SLAM
|
Co, Henry C. |
|
1988 |
|
3 |
p. 189-198 10 p. |
artikel |
41 |
Diary of events
|
|
|
1991 |
|
3 |
p. 301-302 2 p. |
artikel |
42 |
Diary of events
|
|
|
1990 |
|
3 |
p. 314-316 3 p. |
artikel |
43 |
Diary of events
|
|
|
1983 |
|
3 |
p. 245- 1 p. |
artikel |
44 |
Diary of events
|
|
|
1986 |
|
3 |
p. 259-260 2 p. |
artikel |
45 |
Diary of events
|
|
|
1987 |
|
3 |
p. 185-186 2 p. |
artikel |
46 |
Diary of events
|
|
|
1988 |
|
3 |
p. 239-240 2 p. |
artikel |
47 |
Diary of events
|
|
|
1988 |
|
3 |
p. 245-246 2 p. |
artikel |
48 |
Diary of events
|
|
|
1990 |
|
3 |
p. 319-320 2 p. |
artikel |
49 |
Dynamic simulation of mobile robot navigation in warehousing environments
|
Pandit, Ram |
|
1991 |
|
3 |
p. 211-225 15 p. |
artikel |
50 |
Economic appraisal of energy conservation measures on a hydrofiner unit
|
McKay, G. |
|
1983 |
|
3 |
p. 195-203 9 p. |
artikel |
51 |
Economic ordering policy for deterministic two-echelon distribution systems
|
Das, C. |
|
1991 |
|
3 |
p. 227-231 5 p. |
artikel |
52 |
Effectiveness and efficiency of product quality inspection processes
|
Lubicz, Marek |
|
1984 |
|
3 |
p. 215-222 8 p. |
artikel |
53 |
Erratum
|
|
|
1986 |
|
3 |
p. 261- 1 p. |
artikel |
54 |
Estimating the internal rate of return from fuzzy data
|
Pohjola, V.J. |
|
1990 |
|
3 |
p. 215-221 7 p. |
artikel |
55 |
Flexible manufacturing systems in practice — results of a study of operational use
|
Hackstein, R. |
|
1991 |
|
3 |
p. 259-276 18 p. |
artikel |
56 |
Forecasting of working-capital requirements under capital constraints — A Monte Carlo simulation approach
|
Gupta, Yash P. |
|
1984 |
|
3 |
p. 223-234 12 p. |
artikel |
57 |
From enterprise analysis to conceptual database design in production systems
|
DiLeva, A |
|
1989 |
|
3 |
p. 171-182 12 p. |
artikel |
58 |
Goal programming applications for some problems in materials management
|
Mohanty, R.P. |
|
1984 |
|
3 |
p. 157-164 8 p. |
artikel |
59 |
Idle capacity and timeliness in mix change decisions
|
Azzone, Giovanni |
|
1990 |
|
3 |
p. 269-274 6 p. |
artikel |
60 |
Including variability of discrete estimates in engineering economic comparisons
|
Kennedy Jr., W.J. |
|
1988 |
|
3 |
p. 211-216 6 p. |
artikel |
61 |
Inflation and managing profitability
|
De Santiago, Miguel |
|
1987 |
|
3 |
p. 151-159 9 p. |
artikel |
62 |
Inflation in engineering economic analysis
|
Rose, Aaron |
|
1983 |
|
3 |
p. 244- 1 p. |
artikel |
63 |
Inspect or monitor?
|
Sherwin, D.J. |
|
1990 |
|
3 |
p. 223-231 9 p. |
artikel |
64 |
International technology transfer for improved production functions
|
Chacko, George K. |
|
1986 |
|
3 |
p. 245-252 8 p. |
artikel |
65 |
Inventory replenishment policies for the case of decreasing trend in demand
|
Ramani, S. |
|
1988 |
|
3 |
p. 169-174 6 p. |
artikel |
66 |
Investment justification in flexible manufacturing systems
|
Kakati, M. |
|
1991 |
|
3 |
p. 203-209 7 p. |
artikel |
67 |
Joint ordering of two products with lost sales permitted
|
Goyal, Suresh Kumar |
|
1989 |
|
3 |
p. 209-212 4 p. |
artikel |
68 |
Lot sizing under dynamic demand conditions: A review
|
De Bodt, Marc A. |
|
1984 |
|
3 |
p. 165-187 23 p. |
artikel |
69 |
Mathematics in oil production
|
Hallefjord, Åsa |
|
1990 |
|
3 |
p. 311-312 2 p. |
artikel |
70 |
Maximizing throughput in some simple time-constrained scheduling situations
|
Huisman, H.H. |
|
1990 |
|
3 |
p. 293-299 7 p. |
artikel |
71 |
Minimizing a generalized quadratic penalty function of job completion times: An improved branch-and-bound approach
|
Sen, Tapan |
|
1990 |
|
3 |
p. 197-202 6 p. |
artikel |
72 |
Minimizing a quadratic function of job lateness on a single machine
|
Gupta, Sushil K. |
|
1983 |
|
3 |
p. 187-194 8 p. |
artikel |
73 |
Models of manufacturing systems in different operational contexts
|
Rhodes, D.J. |
|
1989 |
|
3 |
p. 161-169 9 p. |
artikel |
74 |
Multiple machine replacement analysis
|
Leung, Lawrence C. |
|
1990 |
|
3 |
p. 265-275 11 p. |
artikel |
75 |
News from the International Society for Inventory Research (ISIR)
|
|
|
1990 |
|
3 |
p. 313- 1 p. |
artikel |
76 |
News from the international society for inventory research (ISIR)
|
|
|
1986 |
|
3 |
p. 257-258 2 p. |
artikel |
77 |
News from the international society for inventory research (ISIR)
|
|
|
1987 |
|
3 |
p. 183-184 2 p. |
artikel |
78 |
Numerical evaluation of heuristics for the multi-item single-level capacitated lot-size problem
|
Günther, H.O. |
|
1988 |
|
3 |
p. 233-243 11 p. |
artikel |
79 |
On manpower planning in the presence of learning
|
Gerchak, Yigal |
|
1990 |
|
3 |
p. 295-303 9 p. |
artikel |
80 |
On the determination of overplanning margins for components in a consumer electronics factory
|
Kamp, A.P.G.M. |
|
1989 |
|
3 |
p. 183-193 11 p. |
artikel |
81 |
On the selection of industry location alternatives
|
Arcelus, F.J. |
|
1989 |
|
3 |
p. 213-219 7 p. |
artikel |
82 |
Optimizing the location of input/output stations within facilities layout
|
Montreuil, Benoit |
|
1988 |
|
3 |
p. 177-187 11 p. |
artikel |
83 |
Persistent pitfalls and applicable approaches for justification of advanced manufacturing systems
|
Canada, John R. |
|
1990 |
|
3 |
p. 247-253 7 p. |
artikel |
84 |
Present value expressions for capital equipment investment — the hong kong tax systems
|
C. Leung, Lawrence |
|
1987 |
|
3 |
p. 171-180 10 p. |
artikel |
85 |
Product cost-estimation by the designer
|
Wierda, Leo S. |
|
1988 |
|
3 |
p. 189-198 10 p. |
artikel |
86 |
Production cost in the periphery: The case of Greece
|
Pappis, Costas P. |
|
1990 |
|
3 |
p. 285-294 10 p. |
artikel |
87 |
Production in less developed countries: A sensitivity analysis
|
van de Ven, A.D.M. |
|
1986 |
|
3 |
p. 235-243 9 p. |
artikel |
88 |
Reorder point inventory models for stationary and non-stationary demand
|
Häfner, H. |
|
1988 |
|
3 |
p. 199-205 7 p. |
artikel |
89 |
Selecting systems to support Computer-Integrated Manufacturing (CIM)
|
Boaden, R.J. |
|
1990 |
|
3 |
p. 305-318 14 p. |
artikel |
90 |
Simulating the design and analysis of quality control systems in manufacturing
|
Palaniswami, S. |
|
1988 |
|
3 |
p. 217-227 11 p. |
artikel |
91 |
Statistical modeling of overhead costs
|
Boger, Dan C. |
|
1984 |
|
3 |
p. 145-156 12 p. |
artikel |
92 |
Systematic machine-condition monitoring — a case study from Parenco paper mill in Holland
|
o'Sullivan, Matt |
|
1991 |
|
3 |
p. 277-293 17 p. |
artikel |
93 |
Technoeconomic study for production of copper from Saudi Ore
|
Fakeeha, A.H. |
|
1990 |
|
3 |
p. 275-283 9 p. |
artikel |
94 |
The design of a scientific inventory control system
|
Murdoch, John |
|
1987 |
|
3 |
p. 133-145 13 p. |
artikel |
95 |
The overall rate of return as a profit measure for capital projects
|
Au, Tung |
|
1983 |
|
3 |
p. 235-241 7 p. |
artikel |
96 |
The service parts control problem
|
Yamashina, H. |
|
1989 |
|
3 |
p. 195-208 14 p. |
artikel |
97 |
Title index
|
|
|
1991 |
|
3 |
p. 304- 1 p. |
artikel |
98 |
Title index
|
|
|
1990 |
|
3 |
p. 322- 1 p. |
artikel |
99 |
Title index
|
|
|
1990 |
|
3 |
p. 318- 1 p. |
artikel |
100 |
Two heuristic methods for grouping inventory items
|
Goyal, S.K. |
|
1984 |
|
3 |
p. 211-214 4 p. |
artikel |
101 |
Using multiple time-series analysis, of assembly-line production of automobile engines — a case study
|
Somers, Toni M. |
|
1991 |
|
3 |
p. 243-258 16 p. |
artikel |
102 |
Utilizing traveling—Salesman subtours to create sales districts
|
Feiring, Bruce R. |
|
1986 |
|
3 |
p. 211-215 5 p. |
artikel |
103 |
Warehouse logistic systems — A CAD model
|
Perlmann, A.M. |
|
1988 |
|
3 |
p. 229-237 9 p. |
artikel |