nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comparison of discrete, single stage lot-sizing heuristics with special emphasis on rules based on the marginal cost principle
|
Wemmerlöv, U. |
|
1982 |
|
1 |
p. 45-53 9 p. |
artikel |
2 |
A computer-aided ‘foundry specific’ planning and estimating system: Its development and some operating results
|
Ajmal, A. |
|
1987 |
|
1 |
p. 55-63 9 p. |
artikel |
3 |
A constant lot size model with equal and unequal sized batch shipments between production stages
|
Goyal, S.K. |
|
1986 |
|
1 |
p. 203-210 8 p. |
artikel |
4 |
Adopting innovational technology in industry
|
Amos, John M. |
|
1982 |
|
1 |
p. 87-93 7 p. |
artikel |
5 |
A geometric programming solution to the optimal recovery of solids from gas cyclones
|
Kermode, R.I. |
|
1982 |
|
1 |
p. 63-68 6 p. |
artikel |
6 |
A goal programming model for project crashing with piecewise linear time-cost trade-off
|
Vrat, Prem |
|
1986 |
|
1 |
p. 161-172 12 p. |
artikel |
7 |
A method for assembly line balancing
|
Betts, J. |
|
1989 |
|
1 |
p. 55-64 10 p. |
artikel |
8 |
A more efficient formulation of the single machine, static demand, lot scheduling problem
|
Boctor, Fayez Fouad |
|
1988 |
|
1 |
p. 3-10 8 p. |
artikel |
9 |
A multicriteria approach to the marking-up of a bid
|
Tarranza, Nathaniel C. |
|
1986 |
|
1 |
p. 139-153 15 p. |
artikel |
10 |
An algorithm for the N/M/parallel/C maxpreemptive due-date scheduling problem
|
Cheng, T.C.E. |
|
1991 |
|
1 |
p. 43-49 7 p. |
artikel |
11 |
Analytic Delphi Method (ADM): A strategic decision making model applied to location planning
|
Azani, Hossein |
|
1990 |
|
1 |
p. 23-28 6 p. |
artikel |
12 |
An input-output model for equipment replacement decisions
|
Tanchoco, J.M.A. |
|
1987 |
|
1 |
p. 69-78 10 p. |
artikel |
13 |
An interactive port capacity expansion simulation model
|
Park, C.S. |
|
1987 |
|
1 |
p. 109-124 16 p. |
artikel |
14 |
An inventory control model designed for a small manufacturer using a programmable calculator
|
Levary, Reuven R. |
|
1982 |
|
1 |
p. 25-35 11 p. |
artikel |
15 |
A note on the economic replenishment interval for an item with a linear trend in demand
|
Goyal, Suresh |
|
1986 |
|
1 |
p. 253-255 3 p. |
artikel |
16 |
A profit maximization model for machine/part assignment in a manufacturing system
|
Leung, Lawrence C. |
|
1986 |
|
1 |
p. 57-67 11 p. |
artikel |
17 |
A quantitative comparison of production and inventory control concepts
|
Ovrin, Peter |
|
1990 |
|
1 |
p. 105-106 2 p. |
artikel |
18 |
A review of cost estimating for advanced composite materials applications
|
Zaloom, Victor |
|
1982 |
|
1 |
p. 81-86 6 p. |
artikel |
19 |
A review of research on AGVS vehicle management
|
Co, Christine G. |
|
1991 |
|
1 |
p. 35-42 8 p. |
artikel |
20 |
A short-cycle product aggregate planning model incorporating improvement curve productivity
|
Khoshnevis, Behrokh |
|
1986 |
|
1 |
p. 217-233 17 p. |
artikel |
21 |
A simple algorithm for determining the optimum policy for jointly replenished items
|
Goyal, S.K. |
|
1987 |
|
1 |
p. 147-150 4 p. |
artikel |
22 |
A simple heuristic method for determining economic order interval for linear demand
|
Goyal, S.K. |
|
1987 |
|
1 |
p. 53-57 5 p. |
artikel |
23 |
A simplified scheme for determining the parameters of an economic design of cumulative sum charts to control non-normal process means
|
Rahim, M.A. |
|
1987 |
|
1 |
p. 39-47 9 p. |
artikel |
24 |
A solution of vehicle routing problems in a multiple objective environment
|
Park, Yang Byung |
|
1986 |
|
1 |
p. 121-132 12 p. |
artikel |
25 |
A tool for constructing production systems on the deductive database system adbis
|
Takagi, T. |
|
1988 |
|
1 |
p. 77-84 8 p. |
artikel |
26 |
A transient state model for predicting maintenance requirements
|
Brammer, K.W. |
|
1987 |
|
1 |
p. 87-98 12 p. |
artikel |
27 |
Author index
|
|
|
1987 |
|
1 |
p. 241- 1 p. |
artikel |
28 |
Author index
|
|
|
1986 |
|
1 |
p. 323- 1 p. |
artikel |
29 |
Bi-criterion single-machine scheduling with forbidden early shipments
|
Fry, Timothy D. |
|
1986 |
|
1 |
p. 133-137 5 p. |
artikel |
30 |
Bottleneck generalized assignment problems
|
Mazzola, J.B. |
|
1988 |
|
1 |
p. 61-65 5 p. |
artikel |
31 |
Client/contractor relationship: Mutual metaphors
|
Bidder, J. |
|
1980 |
|
1 |
p. 2- 1 p. |
artikel |
32 |
Common component inventory problems with a budget constraint: Heuristics and upper bounds
|
Jönsson, Henrik |
|
1989 |
|
1 |
p. 71-81 11 p. |
artikel |
33 |
Common cycle scheduling in a multistage production process
|
Hsu, John I.S. |
|
1990 |
|
1 |
p. 73-80 8 p. |
artikel |
34 |
Comparative energy efficiencies of the dairy manufacturing and processing industry: Australia and New Zealand
|
Cox, G.C. |
|
1986 |
|
1 |
p. 293-303 11 p. |
artikel |
35 |
Computer aided licence selection
|
Forgó, Ferenc |
|
1987 |
|
1 |
p. 161-170 10 p. |
artikel |
36 |
Computer-aided test process models: What do they tell about test cost?
|
Hungerford, James F |
|
1989 |
|
1 |
p. 11-21 11 p. |
artikel |
37 |
Copper econometric models
|
Hu, S.David |
|
1980 |
|
1 |
p. 53-70 18 p. |
artikel |
38 |
Corrigendum
|
|
|
1987 |
|
1 |
p. 181- 1 p. |
artikel |
39 |
Cost accounting for the construction firm
|
Grubbström, R.W. |
|
1986 |
|
1 |
p. 78- 1 p. |
artikel |
40 |
Cost and price indices
|
Boyd, Norman |
|
1986 |
|
1 |
p. 267-270 4 p. |
artikel |
41 |
Cost and price indices
|
Boyd, Norman |
|
1987 |
|
1 |
p. 1-12 12 p. |
artikel |
42 |
Cost and price indices
|
Boyd, Norman |
|
1986 |
|
1 |
p. 1-12 12 p. |
artikel |
43 |
Cost and price indices
|
Boyd, Norman |
|
1982 |
|
1 |
p. 13-18 6 p. |
artikel |
44 |
Cost and price indices
|
Boyd, Norman |
|
1986 |
|
1 |
p. 189-201 13 p. |
artikel |
45 |
Cost and price indices
|
Boyd, Norman |
|
1987 |
|
1 |
p. 125-131 7 p. |
artikel |
46 |
Cost and price indices
|
|
|
1980 |
|
1 |
p. 3-6 4 p. |
artikel |
47 |
Design for a comprehensive maintenance planning recording and optimization system
|
Sherwin, D.J. |
|
1990 |
|
1 |
p. 37-42 6 p. |
artikel |
48 |
Determination of confidence intervals for the economic tool life
|
Goyal, S.K. |
|
1987 |
|
1 |
p. 49-52 4 p. |
artikel |
49 |
Deterministic lot-sizing procedures for multi-stage assembly systems
|
Cole, F. |
|
1982 |
|
1 |
p. 37-44 8 p. |
artikel |
50 |
Diary of events
|
|
|
1980 |
|
1 |
p. 73-74 2 p. |
artikel |
51 |
Diary of events
|
|
|
1991 |
|
1 |
p. 93-94 2 p. |
artikel |
52 |
Diary of events
|
|
|
1989 |
|
1 |
p. 101-103 3 p. |
artikel |
53 |
Diary of events
|
|
|
1990 |
|
1 |
p. 107-108 2 p. |
artikel |
54 |
Diary of events
|
|
|
1986 |
|
1 |
p. 79-80 2 p. |
artikel |
55 |
Diary of events
|
|
|
1986 |
|
1 |
p. 321-322 2 p. |
artikel |
56 |
Diary of events
|
|
|
1987 |
|
1 |
p. 185-186 2 p. |
artikel |
57 |
Diary of events
|
|
|
1987 |
|
1 |
p. 65-66 2 p. |
artikel |
58 |
Diary of events
|
|
|
1986 |
|
1 |
p. 259-260 2 p. |
artikel |
59 |
Diary of events
|
|
|
1982 |
|
1 |
p. 95-96 2 p. |
artikel |
60 |
Diary of events
|
|
|
1989 |
|
1 |
p. 79-80 2 p. |
artikel |
61 |
Diary of events
|
|
|
1987 |
|
1 |
p. 75-76 2 p. |
artikel |
62 |
Diary of events
|
|
|
1987 |
|
1 |
p. 239-240 2 p. |
artikel |
63 |
Diary of events
|
|
|
1986 |
|
1 |
p. 187-188 2 p. |
artikel |
64 |
Discount pricing policies for new products
|
Martin, G.E. |
|
1989 |
|
1 |
p. 23-31 9 p. |
artikel |
65 |
Due-date determination for an single-machine shop with SPT dispatching
|
Cheng, T.C.E. |
|
1986 |
|
1 |
p. 35-41 7 p. |
artikel |
66 |
Economic analysis of production system duplication policies using the RAMCOST model
|
Ntuen, C.A. |
|
1987 |
|
1 |
p. 99-107 9 p. |
artikel |
67 |
Economic ordering policy during special discount periods for dynamic inventory problems under certainty
|
Goyal, S.K. |
|
1990 |
|
1 |
p. 101-104 4 p. |
artikel |
68 |
Economic order quantities with discounting
|
Clarke, Harry R. |
|
1987 |
|
1 |
p. 215-221 7 p. |
artikel |
69 |
Economics and financial studies for engineers
|
Rose, Aaron |
|
1987 |
|
1 |
p. 71- 1 p. |
artikel |
70 |
Economic selection of a process level under acceptance sampling by variables
|
Carlsson, Olle |
|
1989 |
|
1 |
p. 69-78 10 p. |
artikel |
71 |
Economics selection: Cumulative bibliography
|
Rose, Aaron |
|
1980 |
|
1 |
p. 71- 1 p. |
artikel |
72 |
Editorial Board
|
|
|
1991 |
|
1 |
p. v-vi nvt p. |
artikel |
73 |
Editorial Board
|
|
|
1988 |
|
1 |
p. iv- 1 p. |
artikel |
74 |
Editorial Board
|
|
|
1990 |
|
1 |
p. v-viii nvt p. |
artikel |
75 |
Editorial Board
|
|
|
1987 |
|
1 |
p. ii- 1 p. |
artikel |
76 |
Editorial Board
|
|
|
1989 |
|
1 |
p. iv- 1 p. |
artikel |
77 |
Editorial Board
|
|
|
1989 |
|
1 |
p. IFC- 1 p. |
artikel |
78 |
Editorial Board
|
|
|
1982 |
|
1 |
p. iv- 1 p. |
artikel |
79 |
Editorial Board
|
|
|
1986 |
|
1 |
p. vi- 1 p. |
artikel |
80 |
Editorial Board
|
|
|
1987 |
|
1 |
p. ii- 1 p. |
artikel |
81 |
Editorial Board
|
|
|
1980 |
|
1 |
p. iii- 1 p. |
artikel |
82 |
Editorial note
|
Grubbström, Robert W. |
|
1980 |
|
1 |
p. 1- 1 p. |
artikel |
83 |
Editorial note
|
Grubbström, Robert W. |
|
1982 |
|
1 |
p. 1- 1 p. |
artikel |
84 |
Efforts to promote the economic and technological development of the Republic of China
|
Chien, Robert C. |
|
1986 |
|
1 |
p. 263-265 3 p. |
artikel |
85 |
Electricity and industrial productivity: A technical and economic perspective
|
Rose, Aaron |
|
1987 |
|
1 |
p. 71-72 2 p. |
artikel |
86 |
Equipment replacement decisions
|
Tanchoco, J.M.A. |
|
1987 |
|
1 |
p. 67- 1 p. |
artikel |
87 |
Erratum
|
|
|
1986 |
|
1 |
p. 261- 1 p. |
artikel |
88 |
Estimates of the minimum nondominated criterion values in multiple-criteria decision-making
|
Dessouky, M.I. |
|
1986 |
|
1 |
p. 95-104 10 p. |
artikel |
89 |
Ex-ante measures for evaluating forecasting models
|
Steece, Bert |
|
1986 |
|
1 |
p. 25-34 10 p. |
artikel |
90 |
Expert simulation systems for manufacturing planning
|
Palaniswami, Shanthakumar |
|
1987 |
|
1 |
p. 59-62 4 p. |
artikel |
91 |
Facilities layout with multiple objectives: MFLAP
|
Waghodekar, P.H. |
|
1986 |
|
1 |
p. 105-112 8 p. |
artikel |
92 |
Fourth international symposium on inventories, August 25–29, 1986, Budapest, Hungary
|
|
|
1986 |
|
1 |
p. 82-83 2 p. |
artikel |
93 |
Goal achievement through goal programming: Short versus long term
|
Rifai, Ahmed K. |
|
1986 |
|
1 |
p. 155-160 6 p. |
artikel |
94 |
Heirarchical spare parts inventory systems
|
Rose, Aaron |
|
1987 |
|
1 |
p. 237-238 2 p. |
artikel |
95 |
Hierarchical production planning: Comparison of some heuristics
|
Mohanty, R.P. |
|
1987 |
|
1 |
p. 203-214 12 p. |
artikel |
96 |
Implementing just-in-time concepts into European companies
|
Wildemann, Horst |
|
1987 |
|
1 |
p. 27-37 11 p. |
artikel |
97 |
Improving lot sizing decisions based on heuristic methods
|
Goyal, S.K. |
|
1986 |
|
1 |
p. 287-291 5 p. |
artikel |
98 |
Inflation and managing profitability
|
De Santiago, Miguel |
|
1987 |
|
1 |
p. 151-159 9 p. |
artikel |
99 |
Inflation exchange rates and the world economy
|
Rose, Aaron |
|
1987 |
|
1 |
p. 237- 1 p. |
artikel |
100 |
Integration of network analysis systems with MRP in a make-to-order manufacturing environment
|
Harhalakis, G. |
|
1988 |
|
1 |
p. 47-59 13 p. |
artikel |
101 |
International manufacturing: An analysis on factory level on the centre-periphery relations
|
van de Ven, A.D.M. |
|
1989 |
|
1 |
p. 11-33 23 p. |
artikel |
102 |
International technology transfer for improved production functions
|
Chacko, George K. |
|
1986 |
|
1 |
p. 245-252 8 p. |
artikel |
103 |
Inventory grouping for joint replenishment
|
Chakravarty, Amiya K. |
|
1982 |
|
1 |
p. 19-24 6 p. |
artikel |
104 |
Inventory system costs: Source data for analysis
|
Brooking, Stanley A. |
|
1987 |
|
1 |
p. 1-12 12 p. |
artikel |
105 |
IXth International conference on production research
|
|
|
1986 |
|
1 |
p. 81- 1 p. |
artikel |
106 |
Learning curves and production functions: An integration
|
Gulledge Jr., Thomas R. |
|
1990 |
|
1 |
p. 3-12 10 p. |
artikel |
107 |
Learning negotiation
|
Ostwald, Phillip F. |
|
1987 |
|
1 |
p. 187-192 6 p. |
artikel |
108 |
Lot sizing in a practical manufacturing system
|
O'Grady, P.J. |
|
1987 |
|
1 |
p. 13-26 14 p. |
artikel |
109 |
Mathematical formulation of the economic dispatch problem of a power system by using a linear load flow model
|
Leonidopoulos, Georgios |
|
1991 |
|
1 |
p. 11-20 10 p. |
artikel |
110 |
Minimizing production costs for a robotic assembly system
|
Dessouky, Maged M. |
|
1991 |
|
1 |
p. 81-92 12 p. |
artikel |
111 |
Multicriteria scheduling of dynamic production activities
|
Wȩglarz, Jan |
|
1988 |
|
1 |
p. 19-24 6 p. |
artikel |
112 |
Multi-item inventory grouping with dependent set-up cost and group overhead cost
|
Chakravarty, Amiya K. |
|
1986 |
|
1 |
p. 13-23 11 p. |
artikel |
113 |
Multiobjective models for selection of priority areas and industrial projects for investment promotion
|
Jose, Virginia D. |
|
1986 |
|
1 |
p. 173-184 12 p. |
artikel |
114 |
Multiple-criteria decision-making: Balancing a variety of needs and goals
|
Tabucanon, MarioT. |
|
1986 |
|
1 |
p. 85-87 3 p. |
artikel |
115 |
Multiple projects — Multiple resources constrained scheduling: A multiobjective analysis
|
Mohanty, R.P. |
|
1989 |
|
1 |
p. 83-92 10 p. |
artikel |
116 |
News from the International Society for Inventory Research (ISIR)
|
|
|
1987 |
|
1 |
p. 63-64 2 p. |
artikel |
117 |
News from the International Society for Inventory Research (ISIR)
|
|
|
1987 |
|
1 |
p. 73-74 2 p. |
artikel |
118 |
News from the International Society for Inventory Research (ISIR)
|
|
|
1986 |
|
1 |
p. 185-186 2 p. |
artikel |
119 |
News from the International Society for Inventory Research (ISIR)
|
|
|
1987 |
|
1 |
p. 183-184 2 p. |
artikel |
120 |
News from the International Society for Inventory Research (ISIR)
|
|
|
1986 |
|
1 |
p. 257-258 2 p. |
artikel |
121 |
News from the International Society for Inventory Research (ISIR)
|
|
|
1986 |
|
1 |
p. 319-320 2 p. |
artikel |
122 |
Nonlinear multiproduct CVP analysis with 0–1 mixed integer programming
|
Tsai, Wen-Hsien |
|
1990 |
|
1 |
p. 81-91 11 p. |
artikel |
123 |
Note on aggregation in linear programming problems
|
Frolik, Jan |
|
1986 |
|
1 |
p. 69-72 4 p. |
artikel |
124 |
Obituary
|
Geraerds, W.M.J. |
|
1990 |
|
1 |
p. 1- 1 p. |
artikel |
125 |
On improving replenishment policies for linear trend in demand
|
Goyal, S.K. |
|
1986 |
|
1 |
p. 73-76 4 p. |
artikel |
126 |
On the validity of reorderpoint inventory models for regular and sporadic demand
|
Alscher, Jürgen |
|
1986 |
|
1 |
p. 43-55 13 p. |
artikel |
127 |
Optimal policies for claiming payment under price escalation clause types of contracts
|
Keller, A.Z. |
|
1982 |
|
1 |
p. 69-80 12 p. |
artikel |
128 |
Optimal production plan in a tool wear process with rewards for acceptable, undersized and oversized parts
|
Arcelus, F.J. |
|
1987 |
|
1 |
p. 13-19 7 p. |
artikel |
129 |
Optimal slack due-date determination and sequencing
|
Cheng, T.C.E. |
|
1986 |
|
1 |
p. 305-309 5 p. |
artikel |
130 |
Optimal system design with multiple criteria: De Novo programming approach
|
Zeleny, Milan |
|
1986 |
|
1 |
p. 89-94 6 p. |
artikel |
131 |
Optimization of spare parts in a multilevel maintenance system
|
Kostić, Ing.Svetislav |
|
1990 |
|
1 |
p. 93-99 7 p. |
artikel |
132 |
Orderbook profiles: Managing beyond the schedules
|
Nicholson, T.A.J. |
|
1987 |
|
1 |
p. 65-70 6 p. |
artikel |
133 |
Performance of constrained multi-item inventory systems within a rolling horizon regime
|
Alscher, J. |
|
1987 |
|
1 |
p. 193-202 10 p. |
artikel |
134 |
Pilot-to-project cash flow estimation
|
Blank, Leland |
|
1986 |
|
1 |
p. 311-318 8 p. |
artikel |
135 |
Present value expressions for capital equipment investment — The Hong Kong tax systems
|
Leung, Lawrence C. |
|
1987 |
|
1 |
p. 171-180 10 p. |
artikel |
136 |
Present worth analysis of capital projects using a polynomial cash flow model
|
Almond, Brian |
|
1980 |
|
1 |
p. 33-42 10 p. |
artikel |
137 |
Process engineering, biology and profitability of a new protein biosynthesis method
|
Heisel, Michael |
|
1980 |
|
1 |
p. 21-32 12 p. |
artikel |
138 |
Procurement under uncertain supply lead times — A dual- sourcing technique could save costs
|
Ramasesh, Ranga V. |
|
1991 |
|
1 |
p. 59-68 10 p. |
artikel |
139 |
Production in less developed countries: A sensitivity analysis
|
van de Ven, A.D.M. |
|
1986 |
|
1 |
p. 235-243 9 p. |
artikel |
140 |
Production rate, learning, and program costs: Survey and bibliography
|
Gulledge Jr., Thomas R. |
|
1987 |
|
1 |
p. 223-236 14 p. |
artikel |
141 |
Production scheduling on parallel machines subject to staircase demands
|
Slowinski, Roman |
|
1988 |
|
1 |
p. 11-17 7 p. |
artikel |
142 |
Production with optimum irrigation management under saline conditions
|
Knapp, Keith C. |
|
1988 |
|
1 |
p. 41-46 6 p. |
artikel |
143 |
Productivity measurement in multi-product manufacturing firms
|
Ray, Pradip K. |
|
1987 |
|
1 |
p. 39-54 16 p. |
artikel |
144 |
Quality costing: The lessons learnt from a study carried out in two phases
|
Eldridge, S. |
|
1989 |
|
1 |
p. 33-44 12 p. |
artikel |
145 |
Quality management systems performance boundaries versus system demands
|
G. Andrews, Harold |
|
1989 |
|
1 |
p. 93-100 8 p. |
artikel |
146 |
Reducing the cost of quality through test data management
|
Manikas, Paul N |
|
1989 |
|
1 |
p. 1-10 10 p. |
artikel |
147 |
Reduction of manufacturing lead-time through selection of machining rate and unit handling size
|
Egbelu, Pius J. |
|
1991 |
|
1 |
p. 21-34 14 p. |
artikel |
148 |
Replacement of auxiliary power supply system—A case study in an urban railway
|
Mak, S.M.L. |
|
1991 |
|
1 |
p. 1-9 9 p. |
artikel |
149 |
Replacement policy: The impact of technological advances
|
Jones, M.S. |
|
1987 |
|
1 |
p. 79-86 8 p. |
artikel |
150 |
Scale economies and the “0.6 rule”
|
Tribe, M.A. |
|
1986 |
|
1 |
p. 271-278 8 p. |
artikel |
151 |
Scheduling in large scale production systems: A medium term production management model
|
Meier, Klaus |
|
1988 |
|
1 |
p. 67-74 8 p. |
artikel |
152 |
Simulation study of production inventory management in a mylar capacitor manufacturing company
|
Cheng, T.C.E. |
|
1990 |
|
1 |
p. 43-50 8 p. |
artikel |
153 |
Sizing segregation bins in bulk conveyor systems with discrete loading sources
|
Carnahan, J.V. |
|
1991 |
|
1 |
p. 69-80 12 p. |
artikel |
154 |
Some implications of learning theory for assembly line design and labor productivity
|
Boucher, Thomas O. |
|
1987 |
|
1 |
p. 31-38 8 p. |
artikel |
155 |
Stability of a two-stage production and inventory model
|
Richter, Knut |
|
1990 |
|
1 |
p. 65-71 7 p. |
artikel |
156 |
Stochastic cash flow evaluation under conditions of uncertain timing
|
Estes, John H. |
|
1989 |
|
1 |
p. 65-70 6 p. |
artikel |
157 |
Strategies in spare parts management using a reliability engineering approach
|
Sheikh, Anwar K. |
|
1991 |
|
1 |
p. 51-57 7 p. |
artikel |
158 |
Supplier's discount policy with a single price break point
|
Hwang, Hark |
|
1986 |
|
1 |
p. 279-286 8 p. |
artikel |
159 |
The build-up of value in manufacturing and construction and in the economy
|
Pick, H.J. |
|
1989 |
|
1 |
p. 49-68 20 p. |
artikel |
160 |
The capacitated transportation-production problem: Computational experience
|
Rao, Ram C. |
|
1989 |
|
1 |
p. 45-54 10 p. |
artikel |
161 |
The comparative efficiency of western coal-fired steam-electric generating plants: 1977–1979
|
Färe, Rolf |
|
1987 |
|
1 |
p. 21-30 10 p. |
artikel |
162 |
The design of a scientific inventory control system
|
Murdoch, John |
|
1987 |
|
1 |
p. 133-145 13 p. |
artikel |
163 |
The effect of discounting on inventory lot sizing models
|
Park, Chan S. |
|
1989 |
|
1 |
p. 35-48 14 p. |
artikel |
164 |
The energy scene
|
Bondi, Sir Hermann |
|
1982 |
|
1 |
p. 3-11 9 p. |
artikel |
165 |
The influence of inflation on productivity calculations: A case study
|
Yousif, A.S.H. |
|
1990 |
|
1 |
p. 13-21 9 p. |
artikel |
166 |
The internal rate of return method — A critical study
|
Rapp, Birger |
|
1980 |
|
1 |
p. 43-52 10 p. |
artikel |
167 |
The inventory control problem and the optimal supply price: Micro theoretic
|
Dompere, Kofi Kissi |
|
1990 |
|
1 |
p. 51-64 14 p. |
artikel |
168 |
The local search approach to flexible flow line scheduling
|
Kochhar, Sandeep |
|
1988 |
|
1 |
p. 25-37 13 p. |
artikel |
169 |
The location-allocation problem using multi-objectives
|
Mitra, Amitava |
|
1986 |
|
1 |
p. 113-120 8 p. |
artikel |
170 |
The matching of sales plans and production schedules using a microcomputer
|
Kuutti, Jorma |
|
1990 |
|
1 |
p. 29-36 8 p. |
artikel |
171 |
The production switching heuristic under non-stationary demand
|
Lambrecht, M.R. |
|
1982 |
|
1 |
p. 55-61 7 p. |
artikel |
172 |
The time-cost tradeoff in research and development: A review
|
Graves, Samuel B. |
|
1989 |
|
1 |
p. 1-9 9 p. |
artikel |
173 |
Title index
|
|
|
1986 |
|
1 |
p. 323- 1 p. |
artikel |
174 |
Title index
|
|
|
1987 |
|
1 |
p. 241- 1 p. |
artikel |
175 |
Transport system optimization and pricing
|
Grubbström, R.W. |
|
1986 |
|
1 |
p. 77-78 2 p. |
artikel |
176 |
Utilizing traveling—Salesman subtours to create sales districts
|
Feiring, Bruce R. |
|
1986 |
|
1 |
p. 211-215 5 p. |
artikel |
177 |
Watching inflation in project cost estimating
|
Williams, L.F. |
|
1980 |
|
1 |
p. 7-19 13 p. |
artikel |