Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             38 results found
no title author magazine year volume issue page(s) type
1 A branch-and-bound algorithm for the hybrid flowshop Moursli, O.
2000
64 1-3 p. 113-125
13 p.
article
2 A concurrent engineering approach to chemical process design Herder, Paulien M
2000
64 1-3 p. 311-318
8 p.
article
3 A cooperative production planning method in the field of continuous process plants Resteanu, Cornel
2000
64 1-3 p. 65-78
14 p.
article
4 A new heuristic based on a hypergraph representation for the tool switching problem Djellab, Housni
2000
64 1-3 p. 165-176
12 p.
article
5 An exact method for cost-oriented assembly line balancing Amen, Matthias
2000
64 1-3 p. 187-195
9 p.
article
6 An information system for building production management Ameziane, Farid
2000
64 1-3 p. 345-358
14 p.
article
7 An integrated modelling approach for complex applications and distributed information systems Gargouri, Faı̈ez
2000
64 1-3 p. 331-344
14 p.
article
8 An LP-based approach for loading and routing in a flexible assembly line Sawik, Tadeusz
2000
64 1-3 p. 49-58
10 p.
article
9 A robust optimization model for stochastic logistic problems Yu, Chian-Son
2000
64 1-3 p. 385-397
13 p.
article
10 A two-phase heuristic approach to the permutation flow-shop scheduling problem Suliman, S.M.A.
2000
64 1-3 p. 143-152
10 p.
article
11 Cell formation using evolutionary algorithms with certain constraints Plaquin, Marie-France
2000
64 1-3 p. 267-278
12 p.
article
12 Cell formation with alternative process plans and machine capacity constraints: A new combined approach Caux, C.
2000
64 1-3 p. 279-284
6 p.
article
13 Co-operative production planning for small- and medium-sized enterprises Mezgár, István
2000
64 1-3 p. 37-48
12 p.
article
14 Customer order lead times for production based on lead time and tardiness costs Bertrand, J.W.M.
2000
64 1-3 p. 257-265
9 p.
article
15 Developing manufacturing management strategies: Influence of technology and other issues Banerjee, S.K
2000
64 1-3 p. 79-90
12 p.
article
16 Economic production quantity model for items with imperfect quality Salameh, M.K.
2000
64 1-3 p. 59-64
6 p.
article
17 Editorial 2000
64 1-3 p. xi-xiii
nvt p.
article
18 Experiences with a concurrent engineering self-assessment tool Landeghem, Rik Van
2000
64 1-3 p. 295-309
15 p.
article
19 Flow simulation and genetic algorithm as optimization tools Fontanili, F.
2000
64 1-3 p. 91-100
10 p.
article
20 Future production systems: Influence of self-organization on approaches to quality engineering Massotte, Pierre
2000
64 1-3 p. 359-377
19 p.
article
21 Generalized inspection strategy for randomly failing systems subjected to random shocks Chelbi, Anis
2000
64 1-3 p. 379-384
6 p.
article
22 Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness Botta-Genoulaz, Valérie
2000
64 1-3 p. 101-111
11 p.
article
23 Index 2000
64 1-3 p. 419-421
3 p.
article
24 Indicators for measuring performances of morphology and material handling systems in flexible manufacturing systems Devise, Olivier
2000
64 1-3 p. 209-218
10 p.
article
25 Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies Kolisch, R.
2000
64 1-3 p. 127-141
15 p.
article
26 Lot-sizing problem with setup times in labor-based capacity production systems Aghezzaf, El-Houssaine
2000
64 1-3 p. 1-9
9 p.
article
27 Maximizing benefits in short-term planning in bottle-glass industry Richard, Pascal
2000
64 1-3 p. 11-19
9 p.
article
28 Measuring the performance of lot-sizing techniques in uncertain environments Jeunet, Jully
2000
64 1-3 p. 197-208
12 p.
article
29 Modeling and simulation of the control framework on a flexible manufacturing system Gertosio, C
2000
64 1-3 p. 285-293
9 p.
article
30 Optimal start times under stochastic activity durations Elmaghraby, S.E.
2000
64 1-3 p. 153-164
12 p.
article
31 Performance evaluation and design of a CONWIP system with inspections Duri, Christelle
2000
64 1-3 p. 219-229
11 p.
article
32 Quantitative models for performance measurement system Suwignjo, P
2000
64 1-3 p. 231-241
11 p.
article
33 Spatial decomposition for a multi-facility production and distribution problem Dhaenens-Flipo, Clarisse
2000
64 1-3 p. 177-186
10 p.
article
34 The feeder rack assignment problem in PCB assembly: A case study Klomp, Cornelis
2000
64 1-3 p. 399-407
9 p.
article
35 The overlapping production planning: A new approach of bounded capacity management Bahroun, Z
2000
64 1-3 p. 21-36
16 p.
article
36 The selection of information systems for production management: An evolving problem Beach, R.
2000
64 1-3 p. 319-329
11 p.
article
37 The two level master production schedule and planning bills in a just in time MRP context Lamouri, Samir
2000
64 1-3 p. 409-415
7 p.
article
38 Work-force management in automated assembly systems Croci, F
2000
64 1-3 p. 243-255
13 p.
article
                             38 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands