nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Achievements in the development and future development of SAPOR-S systems for automatic programming of NC lathes
|
Gatalo, Ratko |
|
1988 |
|
1-2 |
p. 91-102 12 p. |
artikel |
2 |
Advanced manufacturing systems
|
Spur, Günter |
|
1988 |
|
1-2 |
p. 7-12 6 p. |
artikel |
3 |
Advanced Resource Planning
|
Vandaele, Nico |
|
2003 |
|
1-2 |
p. 211-218 8 p. |
artikel |
4 |
Advances in metal forming processes
|
Altan, Taylan |
|
1988 |
|
1-2 |
p. 121-128 8 p. |
artikel |
5 |
A generalized Petri net modeling approach for the control of re-entrant flow semiconductor wafer fabrication
|
Odrey, Nicholas G. |
|
2001 |
|
1-2 |
p. 5-11 7 p. |
artikel |
6 |
A genetic-based approach to simulation of self-organizing assembly
|
Brezocnik, Miran |
|
2001 |
|
1-2 |
p. 113-120 8 p. |
artikel |
7 |
AI tools and techniques for manufacturing systems
|
Bratko, Ivan |
|
1988 |
|
1-2 |
p. 27-31 5 p. |
artikel |
8 |
A manufacturing planning and control system for a flexible manufacturing system
|
Slomp, J. |
|
1993 |
|
1-2 |
p. 109-114 6 p. |
artikel |
9 |
A methodology for expressing CIM reference architectures
|
Böhms, H.M. |
|
1993 |
|
1-2 |
p. 131-140 10 p. |
artikel |
10 |
A modeling technique for loading and scheduling problems in FMS
|
Gamila, Mansour Abou |
|
2003 |
|
1-2 |
p. 45-54 10 p. |
artikel |
11 |
An attempt to implement expert system techniques in CAPP
|
Sluga, Alojz |
|
1988 |
|
1-2 |
p. 77-82 6 p. |
artikel |
12 |
An integrated approach for the configuration of automated manufacturing systems
|
Matta, A. |
|
2001 |
|
1-2 |
p. 19-26 8 p. |
artikel |
13 |
An integration of production management rules and fabrication know-how for real-time cell production control
|
Gendreau, D. |
|
1993 |
|
1-2 |
p. 115-122 8 p. |
artikel |
14 |
Announcements
|
|
|
1988 |
|
1-2 |
p. 295- 1 p. |
artikel |
15 |
A particular class of spline in reconstruction of revolution surfaces from 3-D data measured by CMM
|
Caliò, F. |
|
2003 |
|
1-2 |
p. 219-224 6 p. |
artikel |
16 |
Apparatus for visually locating and communicating with mobile robots
|
|
|
1990 |
|
1-2 |
p. i- 1 p. |
artikel |
17 |
Application of new technologies for fully integrated robotized automobile engine production
|
Micheletti, G.F. |
|
1988 |
|
1-2 |
p. 141-148 8 p. |
artikel |
18 |
Application of robots in assembly automation
|
Vukobratović, M. |
|
1988 |
|
1-2 |
p. 175-180 6 p. |
artikel |
19 |
A process for solvent welded rapid prototype tooling
|
Cormier, Denis |
|
2001 |
|
1-2 |
p. 151-157 7 p. |
artikel |
20 |
A product modeling system for top-down design of machine assembly with kinematic motion
|
Kikkawa, Koichi |
|
1993 |
|
1-2 |
p. 49-55 7 p. |
artikel |
21 |
A re-configurable multi-agent system architecture for error recovery in production systems
|
Odrey, Nicholas G. |
|
2003 |
|
1-2 |
p. 35-43 9 p. |
artikel |
22 |
A robust trajectory tracking control of a polishing robot system based on CAM data
|
Lee, M.C. |
|
2001 |
|
1-2 |
p. 177-183 7 p. |
artikel |
23 |
Aspects of computer support of engineering processes
|
Agerman, Erik |
|
1993 |
|
1-2 |
p. 21-31 11 p. |
artikel |
24 |
Automated design of sheet metal punches for bending multiple parts in a single setup
|
Alva, Ujval |
|
2001 |
|
1-2 |
p. 33-47 15 p. |
artikel |
25 |
Automation technology—on the way to an open system architecture
|
Pritschow, G. |
|
1990 |
|
1-2 |
p. 103-111 9 p. |
artikel |
26 |
CAD system with product assembly/disassembly planning function
|
Arai, Eiji |
|
1993 |
|
1-2 |
p. 41-48 8 p. |
artikel |
27 |
Call for papers european journal of operational research
|
|
|
1990 |
|
1-2 |
p. 191- 1 p. |
artikel |
28 |
Communication and control in small batch part manufacturing
|
Tiemersma, J.J. |
|
1993 |
|
1-2 |
p. 123-129 7 p. |
artikel |
29 |
Company management between complexity and specialization
|
Warnecke, Hans-Jürgen |
|
1990 |
|
1-2 |
p. 73-80 8 p. |
artikel |
30 |
Computer-aided process planning—State of the art and future development
|
Eversheim, W. |
|
1993 |
|
1-2 |
p. 65-70 6 p. |
artikel |
31 |
Computer-integrated mechanical engineering (CIME)
|
Neipp, Gerhard |
|
1990 |
|
1-2 |
p. 89-101 13 p. |
artikel |
32 |
Contoured edge slice generation in rapid prototyping via 5-axis machining
|
Taylor, James B. |
|
2001 |
|
1-2 |
p. 13-18 6 p. |
artikel |
33 |
Control loop architecture and information system of a flexible manufacturing cell
|
Couturier, Jean-François |
|
1993 |
|
1-2 |
p. 141-146 6 p. |
artikel |
34 |
Coordinate measuring techniques in quality assurance
|
Sostar, A. |
|
1988 |
|
1-2 |
p. 259-265 7 p. |
artikel |
35 |
Corporate management in the industrial society of the future
|
Spur, G. |
|
1990 |
|
1-2 |
p. 3-14 12 p. |
artikel |
36 |
Criteria for selecting control systems in flexible manufacturing
|
Waller, S. |
|
1990 |
|
1-2 |
p. 81-88 8 p. |
artikel |
37 |
Cycle time management during production ramp-up
|
Haller, Martin |
|
2003 |
|
1-2 |
p. 183-188 6 p. |
artikel |
38 |
Demand-controlled production using an interconnected manufacturing system: Realization and application
|
Hammer, Helmut |
|
1990 |
|
1-2 |
p. 113-125 13 p. |
artikel |
39 |
Design and performances of a one-degree-of-freedom guided nano-actuator
|
Lambert, P. |
|
2003 |
|
1-2 |
p. 89-98 10 p. |
artikel |
40 |
Designing an Internet-based group decision support system
|
Wang, Kung-Jeng |
|
2003 |
|
1-2 |
p. 65-77 13 p. |
artikel |
41 |
Design management in the face of growing product complexity
|
Weck, Manfred |
|
1990 |
|
1-2 |
p. 51-62 12 p. |
artikel |
42 |
Design of cellular manufacturing systems—An industrial case study
|
Gu, Peihua |
|
1993 |
|
1-2 |
p. 147-151 5 p. |
artikel |
43 |
Design of robot manipulators based on kinematic analyses
|
Lenarčič, Jadran |
|
1988 |
|
1-2 |
p. 203-209 7 p. |
artikel |
44 |
Design of the database for CAD based on group technology
|
Grum, J. |
|
1988 |
|
1-2 |
p. 49-62 14 p. |
artikel |
45 |
Development of a model for part reorientation in vibratory bowl feeders with active air jet tooling
|
Jaksic, Nebojsa I. |
|
2001 |
|
1-2 |
p. 145-149 5 p. |
artikel |
46 |
Dialog between demanding customers and leading manufacturers as a recipe for successful growth and change
|
Skår, Rolf |
|
1990 |
|
1-2 |
p. 149-156 8 p. |
artikel |
47 |
Editorial Board
|
|
|
1990 |
|
1-2 |
p. IFC- 1 p. |
artikel |
48 |
Editorial Board
|
|
|
1993 |
|
1-2 |
p. IFC- 1 p. |
artikel |
49 |
Editorial Board
|
|
|
1988 |
|
1-2 |
p. IFC- 1 p. |
artikel |
50 |
Editorial for the special issue of RCIM for FAIM 2002
|
Ahmad, Munir |
|
2003 |
|
1-2 |
p. 1-2 2 p. |
artikel |
51 |
Editorial for the special issue of RCIM for FAIM
|
Ahmad, Munir |
|
2001 |
|
1-2 |
p. 3-4 2 p. |
artikel |
52 |
Editorial: Software survey section
|
|
|
1993 |
|
1-2 |
p. I-III nvt p. |
artikel |
53 |
Editorial: Software survey section
|
|
|
1988 |
|
1-2 |
p. I-III nvt p. |
artikel |
54 |
Emergence of intelligence in next-generation manufacturing systems
|
Brezocnik, Miran |
|
2003 |
|
1-2 |
p. 55-63 9 p. |
artikel |
55 |
Expert system for wire cutting EDM, based on pulse classification and thermal modeling
|
Dekeyser, W. |
|
1988 |
|
1-2 |
p. 219-224 6 p. |
artikel |
56 |
Expert system shell for building photofinishing diagnostic systems
|
|
|
1990 |
|
1-2 |
p. ii- 1 p. |
artikel |
57 |
Expert system with three classes of rules
|
|
|
1990 |
|
1-2 |
p. i- 1 p. |
artikel |
58 |
Explanation of random vibrations in cutting on grounds of deterministic chaos
|
Grabec, I. |
|
1988 |
|
1-2 |
p. 129-134 6 p. |
artikel |
59 |
Extended production flow analysis
|
Dekleva, J. |
|
1988 |
|
1-2 |
p. 63-68 6 p. |
artikel |
60 |
Flat tactile sensor
|
|
|
1990 |
|
1-2 |
p. ii- 1 p. |
artikel |
61 |
Flexible automation for the customer's sake
|
Winter, Rudolf |
|
1990 |
|
1-2 |
p. 157-169 13 p. |
artikel |
62 |
Fluid distribution to multiple users through distributed intelligence sub-centers
|
|
|
1990 |
|
1-2 |
p. iii- 1 p. |
artikel |
63 |
FMS— Research and industrial development in coordination
|
Sohlenius, Gunnar |
|
1988 |
|
1-2 |
p. 271-276 6 p. |
artikel |
64 |
Gear shaving center for FMS
|
Bossi, O. |
|
1988 |
|
1-2 |
p. 149-154 6 p. |
artikel |
65 |
Grinding of non-circular contours on CNC cylindrical grinding machines
|
Frank, A. |
|
1988 |
|
1-2 |
p. 211-218 8 p. |
artikel |
66 |
Handling disturbances in small volume production
|
Bellgran, Monica |
|
2003 |
|
1-2 |
p. 123-134 12 p. |
artikel |
67 |
High-speed, high-power spindles for flexible manufacturing systems: Applications and results
|
Fiorito, Carlo |
|
1988 |
|
1-2 |
p. 155-163 9 p. |
artikel |
68 |
Identifying automated component handling requirements in a small batch multiple variant production system
|
Edmondson, N.F. |
|
2001 |
|
1-2 |
p. 139-143 5 p. |
artikel |
69 |
Industry on the move: the architecture of change
|
Henn, Gunter |
|
2003 |
|
1-2 |
p. 3-11 9 p. |
artikel |
70 |
Information system structure for a task level robot assembly language for on-line program generation
|
Holm, Hans |
|
1993 |
|
1-2 |
p. 77-88 12 p. |
artikel |
71 |
Information technology prospects for the year 2000
|
Kircher, Herbert |
|
1990 |
|
1-2 |
p. 183-189 7 p. |
artikel |
72 |
Integrated design-to-control approach for holonic manufacturing systems
|
Wang, Lihui |
|
2001 |
|
1-2 |
p. 159-167 9 p. |
artikel |
73 |
Integrating dimensioning and tolerancing in computer-aided process planning
|
Weill, R. |
|
1988 |
|
1-2 |
p. 41-48 8 p. |
artikel |
74 |
Integrating Java 3D model and sensor data for remote monitoring and control
|
Wang, Lihui |
|
2003 |
|
1-2 |
p. 13-19 7 p. |
artikel |
75 |
Intelligent AGV driving toward an autonomous decentralized manufacturing system
|
Watanabe, Michiko |
|
2001 |
|
1-2 |
p. 57-64 8 p. |
artikel |
76 |
Just-in-sequence material supply—a simulation based solution in electronics production
|
Werner, Sebastian |
|
2003 |
|
1-2 |
p. 107-111 5 p. |
artikel |
77 |
Knowledge processing for computer-aided product gestaltung
|
Frank-Lothar, Krause |
|
1990 |
|
1-2 |
p. 27-38 12 p. |
artikel |
78 |
Knowledge system with improved request processing
|
|
|
1990 |
|
1-2 |
p. ii- 1 p. |
artikel |
79 |
Laser welding of light alloys and superalloys
|
Ricciardi, G. |
|
1988 |
|
1-2 |
p. 225-231 7 p. |
artikel |
80 |
Lumber yield optimization software validation and performance review
|
Buehlmann, Urs |
|
2001 |
|
1-2 |
p. 27-32 6 p. |
artikel |
81 |
Machining of aerospace titanium alloys
|
Nabhani, Farhad |
|
2001 |
|
1-2 |
p. 99-106 8 p. |
artikel |
82 |
Management of new technologies in production and logistics
|
Wildemann, Horst |
|
1990 |
|
1-2 |
p. 63-71 9 p. |
artikel |
83 |
Manufacturing cell performance improvement: a simulation study
|
Selen, Willem J |
|
2001 |
|
1-2 |
p. 169-176 8 p. |
artikel |
84 |
Manufacturing Editorial Board
|
|
|
2003 |
|
1-2 |
p. EX2- 1 p. |
artikel |
85 |
Manufacturing engineering: The birth and growth of a new science
|
Horváth, Mátyás |
|
1988 |
|
1-2 |
p. 285-292 8 p. |
artikel |
86 |
Manufacturing intelligence
|
|
|
1988 |
|
1-2 |
p. 293- 1 p. |
artikel |
87 |
Manufacturing process productivity through tribology
|
Ivkovic, B. |
|
1988 |
|
1-2 |
p. 135-138 4 p. |
artikel |
88 |
Manufacturing systems theory and its relation to the basic disciplines of science: From measurements to systems
|
Franksen, Ole Immanuel |
|
1988 |
|
1-2 |
p. 13-25 13 p. |
artikel |
89 |
Marketing advantages via new manufacturing technologies
|
Plinke, Wulff |
|
1990 |
|
1-2 |
p. 127-131 5 p. |
artikel |
90 |
Market-oriented quality management—a strategy with regard to the single European market
|
Hansen, Wolfgang |
|
1990 |
|
1-2 |
p. 143-147 5 p. |
artikel |
91 |
MaxFlow theory for availability calculation of automated material handling systems
|
Beschorner, Alin |
|
2003 |
|
1-2 |
p. 141-145 5 p. |
artikel |
92 |
Methodbases and product models as bases for integrated design and manufacturing
|
Krause, F.-L. |
|
1988 |
|
1-2 |
p. 33-40 8 p. |
artikel |
93 |
Methods of cooperation among government, research institutes, universities and industry which further the development of manufacturing technology in Japan
|
Sata, Toshio |
|
1988 |
|
1-2 |
p. 267-269 3 p. |
artikel |
94 |
Methods of identification of geometrical data in robot kinematics
|
Duelen, G. |
|
1988 |
|
1-2 |
p. 181-185 5 p. |
artikel |
95 |
Microelectronic tools for the individual system engineer
|
Trontelj, Lojze |
|
1988 |
|
1-2 |
p. 245-251 7 p. |
artikel |
96 |
Micromechanism fabrication using silicon fusion bonding
|
Liu, Zhixiong |
|
2001 |
|
1-2 |
p. 131-137 7 p. |
artikel |
97 |
Minimizing the mean flow time in a two-machine group-scheduling problem with carryover sequence dependency
|
Logendran, Rasaratnam |
|
2003 |
|
1-2 |
p. 21-33 13 p. |
artikel |
98 |
Modelling machining processes with a view to their optimization and to the adaptive control of metal cutting machine tools
|
Oxley, P.L.B. |
|
1988 |
|
1-2 |
p. 103-119 17 p. |
artikel |
99 |
MRP-controlled manufacturing environment disturbed by uncertainty
|
Koh, S.C.L. |
|
2003 |
|
1-2 |
p. 157-171 15 p. |
artikel |
100 |
Natural frequencies and biplanar response of generalized rotating spindle systems
|
Gartner, Joseph R. |
|
1988 |
|
1-2 |
p. 165-174 10 p. |
artikel |
101 |
Neural network system for adaptive sensory-motor coordination of multijoint robots for single postures
|
|
|
1990 |
|
1-2 |
p. i- 1 p. |
artikel |
102 |
Next generation stamping dies — controllability and flexibility
|
Cao, Jian |
|
2001 |
|
1-2 |
p. 49-56 8 p. |
artikel |
103 |
Nonlinear regenerative chatter in turning
|
Deshpande, Naren |
|
2001 |
|
1-2 |
p. 107-112 6 p. |
artikel |
104 |
Object collision detection method and apparatus
|
|
|
1990 |
|
1-2 |
p. iii- 1 p. |
artikel |
105 |
Object-instead of function-oriented data management for tool management as an example application
|
Tönshoff, H.K. |
|
1990 |
|
1-2 |
p. 133-141 9 p. |
artikel |
106 |
On the two cases of Yugoslav attempts in adaptive control
|
S̆olaja, V.B. |
|
1988 |
|
1-2 |
p. 241-244 4 p. |
artikel |
107 |
Optimization of cutting conditions during cutting by using neural networks
|
Zuperl, Uros |
|
2003 |
|
1-2 |
p. 189-199 11 p. |
artikel |
108 |
Optimization of cutting process by GA approach
|
Cus, Franci |
|
2003 |
|
1-2 |
p. 113-121 9 p. |
artikel |
109 |
Optimization of quality costs
|
Oppermann, M. |
|
2003 |
|
1-2 |
p. 135-140 6 p. |
artikel |
110 |
Organizational integration of flexible manufacturing systems in conventional workshop structures
|
Eversheim, W. |
|
1990 |
|
1-2 |
p. 39-49 11 p. |
artikel |
111 |
Overview of CIM activities in the European community
|
Mac Conaill, Patricia |
|
1993 |
|
1-2 |
p. 9-12 4 p. |
artikel |
112 |
Performance parameters optimization of a pneumatic programmable palletizer using Taguchi method
|
Lambiase, Alfredo |
|
2003 |
|
1-2 |
p. 147-155 9 p. |
artikel |
113 |
Possibilities of graphic simulation of NC programs
|
Potthast, A. |
|
1988 |
|
1-2 |
p. 83-90 8 p. |
artikel |
114 |
Preface
|
Spur, Günter |
|
1990 |
|
1-2 |
p. 1- 1 p. |
artikel |
115 |
Preface
|
Kals, Hubert |
|
1993 |
|
1-2 |
p. 1-2 2 p. |
artikel |
116 |
Principles of design: Axiomatic design of manufacturing processes systems and products
|
|
|
1988 |
|
1-2 |
p. 295- 1 p. |
artikel |
117 |
Process modeling and analysis of manufacturing supply chain networks using object-oriented Petri nets
|
Dong, Ming |
|
2001 |
|
1-2 |
p. 121-129 9 p. |
artikel |
118 |
Production engineering and information technology in the scope of the third framework programme for research and technological development
|
Pandolfi, F.M. |
|
1993 |
|
1-2 |
p. 3-7 5 p. |
artikel |
119 |
Production planning and control—The tool to ensure logistical quality
|
Wiendahl, Hans-Peter |
|
1993 |
|
1-2 |
p. 99-107 9 p. |
artikel |
120 |
Publisher's note
|
|
|
2001 |
|
1-2 |
p. 1- 1 p. |
artikel |
121 |
Qualitative reasoning about design objects
|
Veerkamp, Paul |
|
1993 |
|
1-2 |
p. 33-39 7 p. |
artikel |
122 |
Results of the Eureka FAMOS research programme: A European contribution to manufacturing technology
|
Jovane, Francesco |
|
1993 |
|
1-2 |
p. 13-19 7 p. |
artikel |
123 |
Robotized rectifier bridge assembly incorporating diode classification and dependable positioning
|
Kralj, A. |
|
1988 |
|
1-2 |
p. 197-201 5 p. |
artikel |
124 |
Role of laser sensor systems in automation and flexible manufacturing
|
Golnabi, Hossein |
|
2003 |
|
1-2 |
p. 201-210 10 p. |
artikel |
125 |
Rules for expanding robot applications
|
Seliger, G. |
|
1988 |
|
1-2 |
p. 187-196 10 p. |
artikel |
126 |
SAPT—Knowledge-based CAPP system
|
Milačić, V.R. |
|
1988 |
|
1-2 |
p. 69-76 8 p. |
artikel |
127 |
Scheduling manufacturing systems in an agile environment
|
He, David |
|
2001 |
|
1-2 |
p. 87-97 11 p. |
artikel |
128 |
Scientific problems of flexible manufacturing systems development and methods for their resolution
|
Solomentsev, Y.M. |
|
1988 |
|
1-2 |
p. 139- 1 p. |
artikel |
129 |
Selection procedures for manufacturing processes for design engineers
|
van den Molengraaf, Jeroen C.M. |
|
1993 |
|
1-2 |
p. 57-64 8 p. |
artikel |
130 |
Simulation of cutting forces in ball-end milling
|
Milfelner, Matjaz |
|
2003 |
|
1-2 |
p. 99-106 8 p. |
artikel |
131 |
Software survey section
|
|
|
1990 |
|
1-2 |
p. I-III nvt p. |
artikel |
132 |
Some fundamental aspects of manufacturing science highlighted by dymamics and thermodynamics
|
Zun, I. |
|
1988 |
|
1-2 |
p. 277-283 7 p. |
artikel |
133 |
Some prospects for pulsed laser manufacturing processes
|
Mozina, Janez |
|
1988 |
|
1-2 |
p. 233-239 7 p. |
artikel |
134 |
Surface integrity as a quality criterion for fabrication processes
|
Leskovar, P. |
|
1988 |
|
1-2 |
p. 253-257 5 p. |
artikel |
135 |
The application of computers in automobile development
|
Seiffert, Ulrich |
|
1990 |
|
1-2 |
p. 171-181 11 p. |
artikel |
136 |
The definition of assembly line balancing difficulty and evaluation of balance solution quality
|
Driscoll, J. |
|
2001 |
|
1-2 |
p. 81-86 6 p. |
artikel |
137 |
The feature approach for the integrated design and machining of forming dies
|
Bernard, Alain |
|
1993 |
|
1-2 |
p. 71-76 6 p. |
artikel |
138 |
The integration of process planning and machine loading in small batch part manufacturing
|
Lenderink, A. |
|
1993 |
|
1-2 |
p. 89-98 10 p. |
artikel |
139 |
The precepts and sciences of manufacturing
|
Merchant, M.E. |
|
1988 |
|
1-2 |
p. 1-6 6 p. |
artikel |
140 |
University-industry interaction for the innovation of new products and processes: A U.S. model
|
Suh, Nam P. |
|
1990 |
|
1-2 |
p. 15-25 11 p. |
artikel |
141 |
Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective
|
Kim, Dong-Won |
|
2003 |
|
1-2 |
p. 173-181 9 p. |
artikel |
142 |
Vector space model for the generalized parts grouping problem
|
Samatova, Nagiza F. |
|
2001 |
|
1-2 |
p. 73-80 8 p. |
artikel |
143 |
Virtual process week in the experimental vehicle build at BMW AG
|
Grandl, Reinhard |
|
2001 |
|
1-2 |
p. 65-71 7 p. |
artikel |
144 |
Vision-guided fixtureless assembly of automotive components
|
Bone, Gary M. |
|
2003 |
|
1-2 |
p. 79-87 9 p. |
artikel |
145 |
Visual navigation system for a mobile robot having capabilities of regenerating of hidden images
|
|
|
1990 |
|
1-2 |
p. ii- 1 p. |
artikel |