nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures
|
Tempelmeier, Horst |
|
1994 |
75 |
2 |
p. 296-311 16 p. |
artikel |
2 |
A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes
|
El-Najdawi, M.K. |
|
1994 |
75 |
2 |
p. 365-377 13 p. |
artikel |
3 |
A linear description of the discrete lot-sizing and scheduling problem
|
van Hoesel, Stan |
|
1994 |
75 |
2 |
p. 342-353 12 p. |
artikel |
4 |
An effective algorithm for the capacitated single item lot size problem
|
Chung, Chia-Shin |
|
1994 |
75 |
2 |
p. 427-440 14 p. |
artikel |
5 |
A new heuristic approach for the multi-item dynamic lot sizing problem
|
Kirca, Ömer |
|
1994 |
75 |
2 |
p. 332-341 10 p. |
artikel |
6 |
A simple lower bound to the dynamic assembly problem
|
Atkins, Derek R. |
|
1994 |
75 |
2 |
p. 462-466 5 p. |
artikel |
7 |
Batching decisions: structure and models
|
Kuik, Roelof |
|
1994 |
75 |
2 |
p. 243-263 21 p. |
artikel |
8 |
Comments on “Balancing capacity and lot sizes” by J. Olhager and B. Rapp (European Journal of Operational Research 19, 337–344)
|
Rosling, Kaj |
|
1994 |
75 |
2 |
p. 467-468 2 p. |
artikel |
9 |
Cyclic scheduling to minimize inventory in a batch flow line
|
Dobson, Gregory |
|
1994 |
75 |
2 |
p. 441-461 21 p. |
artikel |
10 |
Different approaches to a flow shop problem
|
Olhager, Jan |
|
1994 |
75 |
2 |
p. 469-473 5 p. |
artikel |
11 |
Feasibility of scheduling lot sizes of two frequencies on one machine
|
Glass, Celia A. |
|
1994 |
75 |
2 |
p. 354-364 11 p. |
artikel |
12 |
Flexibility and product variety in lot-sizing models
|
de Groote, Xavier |
|
1994 |
75 |
2 |
p. 264-274 11 p. |
artikel |
13 |
Integration of lotsizing and scheduling decisions in a job-shop
|
Dauzère-Péres, Stephane |
|
1994 |
75 |
2 |
p. 413-426 14 p. |
artikel |
14 |
Lot sizing for a product subject to obsolescence or perishability
|
Jain, Karuna |
|
1994 |
75 |
2 |
p. 287-295 9 p. |
artikel |
15 |
Lot streaming in three-stage production processes
|
Glass, C.A. |
|
1994 |
75 |
2 |
p. 378-394 17 p. |
artikel |
16 |
Multi-level production-inventory control: Material requirements planning or reorder point policies?
|
Axsäter, Sven |
|
1994 |
75 |
2 |
p. 405-412 8 p. |
artikel |
17 |
On practical resource allocation for production planning and scheduling with period overlapping setups
|
Dillenberger, Christof |
|
1994 |
75 |
2 |
p. 275-286 12 p. |
artikel |
18 |
The discrete lot-sizing and scheduling problem with sequence-dependent setup costs
|
Fleischmann, Bernhard |
|
1994 |
75 |
2 |
p. 395-404 10 p. |
artikel |
19 |
Using geometric techniques to improve dynamic programming algorithms for the economic lot-sizing problem and extensions
|
van Hoesel, Stan |
|
1994 |
75 |
2 |
p. 312-331 20 p. |
artikel |