nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A branch-and-bound approach for spare unit allocation in a series system
|
Sung, C.S. |
|
1994 |
75 |
1 |
p. 217-232 16 p. |
artikel |
2 |
A decomposition approach for a resource constrained scheduling problem
|
Serafini, P. |
|
1994 |
75 |
1 |
p. 112-135 24 p. |
artikel |
3 |
Alternative optimization strategies for large-scale production-allocation problems
|
Lootsma, F.A. |
|
1994 |
75 |
1 |
p. 13-40 28 p. |
artikel |
4 |
An analytical framework for comparing material requirements planning to reorder point systems
|
Bregman, Robert L. |
|
1994 |
75 |
1 |
p. 74-88 15 p. |
artikel |
5 |
An heuristic algorithm for the production line layout problem
|
Gutiérrez, J.M. |
|
1994 |
75 |
1 |
p. 62-73 12 p. |
artikel |
6 |
A note on the article “An improved version of Wang's algorithm for two-dimensional cutting problems” written by J.F. Oliveira and J.S. Ferreira, Volume 44, 1990, pp. 256–266
|
Holthaus, Oliver |
|
1994 |
75 |
1 |
p. 235-237 3 p. |
artikel |
7 |
A remark on “Integer linear programming formulation for a Vehicle Routing Problem” by N.R. Achutan and L. Caccetta, or how to use the Clark & Wright savings to write such integer linear programming formulations
|
Naddef, Denis |
|
1994 |
75 |
1 |
p. 238-241 4 p. |
artikel |
8 |
A review of optimisation models of Kanban-based production systems
|
Price, Wilson |
|
1994 |
75 |
1 |
p. 1-12 12 p. |
artikel |
9 |
Comment on “The facility layout problem”
|
Bharitkar, Sunil |
|
1994 |
75 |
1 |
p. 233-234 2 p. |
artikel |
10 |
Editorial Board
|
|
|
1994 |
75 |
1 |
p. ii- 1 p. |
artikel |
11 |
Evaluating the impact of lead time uncertainty in material requirements planning systems
|
Ho, Chrwan-jyh |
|
1994 |
75 |
1 |
p. 89-99 11 p. |
artikel |
12 |
Expected waiting times in single-device trip-based material handling systems
|
Bozer, Yavuz A. |
|
1994 |
75 |
1 |
p. 200-216 17 p. |
artikel |
13 |
On incorporating business risk into continuous review inventory models
|
Singhal, Vinod R. |
|
1994 |
75 |
1 |
p. 136-150 15 p. |
artikel |
14 |
Production allocation with dual provisioning
|
Ahmadi, Reza H. |
|
1994 |
75 |
1 |
p. 186-199 14 p. |
artikel |
15 |
Simulated annealing procedures for forming machine cells in group technology
|
Chen, W.-H. |
|
1994 |
75 |
1 |
p. 100-111 12 p. |
artikel |
16 |
Solving a class of network models for dynamic flow control
|
Carey, Malachy |
|
1994 |
75 |
1 |
p. 151-170 20 p. |
artikel |
17 |
Solving the staircase cost facility location problem with decomposition and piecewise linearization
|
Holmberg, Kaj |
|
1994 |
75 |
1 |
p. 41-61 21 p. |
artikel |
18 |
Traffic allocation for manufacturing systems
|
Tang, Christopher S. |
|
1994 |
75 |
1 |
p. 171-185 15 p. |
artikel |