nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A fuzzy genetic algorithm for driver scheduling
|
Li, Jingpeng |
|
2003 |
147 |
2 |
p. 334-344 11 p. |
artikel |
2 |
Algorithms for the variable sized bin packing problem
|
Kang, Jangha |
|
2003 |
147 |
2 |
p. 365-372 8 p. |
artikel |
3 |
Business Applications of Neural Networks
|
Krawiec, Krzysztof |
|
2003 |
147 |
2 |
p. 448-449 2 p. |
artikel |
4 |
Differential approximation for optimal satisfiability and related problems
|
Bazgan, Cristina |
|
2003 |
147 |
2 |
p. 397-404 8 p. |
artikel |
5 |
Editorial board
|
|
|
2003 |
147 |
2 |
p. IFC- 1 p. |
artikel |
6 |
Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
|
Dubois, Didier |
|
2003 |
147 |
2 |
p. 231-252 22 p. |
artikel |
7 |
Fuzzy sets in scheduling and planning
|
Fortemps, P |
|
2003 |
147 |
2 |
p. 229-230 2 p. |
artikel |
8 |
Fuzzy temporal characteristics of operations for project management on the network models basis
|
Slyeptsov, Anatoliy I. |
|
2003 |
147 |
2 |
p. 253-265 13 p. |
artikel |
9 |
Handling flexibility in a “generalised job shop” with a fuzzy approach
|
Allet, Samir |
|
2003 |
147 |
2 |
p. 312-333 22 p. |
artikel |
10 |
Insensitive light traffic in a cellular system with mobile subscribers
|
Yamazaki, Genji |
|
2003 |
147 |
2 |
p. 418-429 12 p. |
artikel |
11 |
On latest starting times and floats in activity networks with ill-known durations
|
Dubois, Didier |
|
2003 |
147 |
2 |
p. 266-280 15 p. |
artikel |
12 |
On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
|
Chanas, Stefan |
|
2003 |
147 |
2 |
p. 281-296 16 p. |
artikel |
13 |
Optimal task allocation and hardware redundancy policies in distributed computing systems
|
Hsieh, Chung-Chi |
|
2003 |
147 |
2 |
p. 430-447 18 p. |
artikel |
14 |
Scheduling parallel dedicated machines under a single non-shared resource
|
Kellerer, H. |
|
2003 |
147 |
2 |
p. 345-364 20 p. |
artikel |
15 |
Scheduling uncertain orders in the customer–subcontractor context
|
Geneste, L. |
|
2003 |
147 |
2 |
p. 297-311 15 p. |
artikel |
16 |
The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime
|
Allahverdi, Ali |
|
2003 |
147 |
2 |
p. 373-396 24 p. |
artikel |
17 |
Uncapacitated point-to-multipoint network flow problem and its application to multicasting in telecommunication networks
|
Park, Koohyun |
|
2003 |
147 |
2 |
p. 405-417 13 p. |
artikel |