nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Advanced maintenance strategies for power plant operators—introducing inter-plant life cycle management
|
Gräber, Ulrich |
|
2004 |
96-97 |
10-11 |
p. 861-865 5 p. |
artikel |
2 |
Application of ductile fracture assessment methods for the assessment of pressure vessels from high strength steels (HSS)
|
Eisele, U. |
|
2004 |
96-97 |
10-11 |
p. 879-887 9 p. |
artikel |
3 |
Calendar
|
|
|
2004 |
96-97 |
10-11 |
p. I-II nvt p. |
artikel |
4 |
Calendar
|
|
|
2007 |
96-97 |
10-11 |
p. I- 1 p. |
artikel |
5 |
Consequence of failure for RBMI
|
Heerings, J.H.A.M. |
|
2004 |
96-97 |
10-11 |
p. 787-796 10 p. |
artikel |
6 |
Flaw analysis in the French RSE_M and RCC-MR code appendices
|
Ainsworth, R.A. |
|
2007 |
96-97 |
10-11 |
p. 589- 1 p. |
artikel |
7 |
French RSE-M and RCC-MR code appendices for flaw analysis: Presentation of the fracture parameters calculation—Part I: General overview
|
Marie, S. |
|
2007 |
96-97 |
10-11 |
p. 590-600 11 p. |
artikel |
8 |
French RSE-M and RCC-MR code appendices for flaw analysis: Presentation of the fracture parameters calculation—Part II: Cracked plates
|
Marie, S. |
|
2007 |
96-97 |
10-11 |
p. 601-613 13 p. |
artikel |
9 |
French RSE-M and RCC-MR code appendices for flaw analysis: Presentation of the fracture parameters calculation—Part III: Cracked pipes
|
Marie, S. |
|
2007 |
96-97 |
10-11 |
p. 614-658 45 p. |
artikel |
10 |
French RSE-M and RCC-MR code appendices for flaw analysis: Presentation of the fracture parameters calculation—Part IV: Cracked elbows
|
Marie, S. |
|
2007 |
96-97 |
10-11 |
p. 659-686 28 p. |
artikel |
11 |
French RSE-M and RCC-MR code appendices for flaw analysis: Presentation of the fracture parameters calculation—Part V: Elements of validation
|
Marie, S. |
|
2007 |
96-97 |
10-11 |
p. 687-696 10 p. |
artikel |
12 |
Life assessment of turbine components based on deterministic and probabilistic procedures
|
Bagaviev, Albert |
|
2004 |
96-97 |
10-11 |
p. 855-859 5 p. |
artikel |
13 |
New brittle fracture model for the European pressure vessel standard
|
Sandström, Rolf |
|
2004 |
96-97 |
10-11 |
p. 837-845 9 p. |
artikel |
14 |
Overview of RIMAP project and its deliverables in the area of power plants
|
Jovanovic, A. |
|
2004 |
96-97 |
10-11 |
p. 815-824 10 p. |
artikel |
15 |
Performance of TMCP steel with respect to mechanical properties after cold forming and post-forming heat treatment
|
Porter, David |
|
2004 |
96-97 |
10-11 |
p. 867-877 11 p. |
artikel |
16 |
Preface
|
|
|
2004 |
96-97 |
10-11 |
p. 785- 1 p. |
artikel |
17 |
Principles of failure probability assessment (PoF)
|
Giribone, R. |
|
2004 |
96-97 |
10-11 |
p. 797-806 10 p. |
artikel |
18 |
Regulatory requirements related to risk-based inspection and maintenance
|
Schröder, Hans-Christian |
|
2004 |
96-97 |
10-11 |
p. 847-854 8 p. |
artikel |
19 |
RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn
|
Bareiß, J. |
|
2004 |
96-97 |
10-11 |
p. 807-813 7 p. |
artikel |
20 |
Risk-based inspection and maintenance systems for steam turbines
|
Fujiyama, Kazunari |
|
2004 |
96-97 |
10-11 |
p. 825-835 11 p. |
artikel |