nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comprehensive review of emergency department simulation applications for normal and disaster conditions
|
Gul, Muhammet |
|
2015 |
83 |
C |
p. 327-344 18 p. |
artikel |
2 |
A Cross Entropy-based heuristic for the capacitated multi-source Weber problem with facility fixed cost
|
Hosseininezhad, Seyed Javad |
|
2015 |
83 |
C |
p. 151-158 8 p. |
artikel |
3 |
A framework to canonicalize manufacturing service capability models
|
Kulvatunyou, Boonserm |
|
2015 |
83 |
C |
p. 39-60 22 p. |
artikel |
4 |
A linkage mining in block-based evolutionary algorithm for permutation flowshop scheduling problem
|
Hsu, Chia-Yu |
|
2015 |
83 |
C |
p. 159-171 13 p. |
artikel |
5 |
A Modified Genetic Algorithm for solving uncertain Constrained Solid Travelling Salesman Problems
|
Maity, Samir |
|
2015 |
83 |
C |
p. 273-296 24 p. |
artikel |
6 |
An adaptive local search algorithm for vehicle routing problem with simultaneous and mixed pickups and deliveries
|
Avci, Mustafa |
|
2015 |
83 |
C |
p. 15-29 15 p. |
artikel |
7 |
An effective asexual genetic algorithm for solving the job shop scheduling problem
|
Amirghasemi, Mehrdad |
|
2015 |
83 |
C |
p. 123-138 16 p. |
artikel |
8 |
An efficient hybrid technique for numerical optimization and applications
|
Parouha, Raghav Prasad |
|
2015 |
83 |
C |
p. 193-216 24 p. |
artikel |
9 |
An inspection-based price rebate and effort contract model with incomplete information
|
Lan, Yanfei |
|
2015 |
83 |
C |
p. 264-272 9 p. |
artikel |
10 |
An integrated three-stage maintenance scheduling model for unrelated parallel machines with aging effect and multi-maintenance activities
|
Tavana, Madjid |
|
2015 |
83 |
C |
p. 226-236 11 p. |
artikel |
11 |
An optimal condition-based maintenance policy for a degrading system subject to the competing risks of soft and hard failure
|
Tang, Diyin |
|
2015 |
83 |
C |
p. 100-110 11 p. |
artikel |
12 |
An outer approximation method for an integration of supply chain network designing and assembly line balancing under uncertainty
|
Yolmeh, Abdolmajid |
|
2015 |
83 |
C |
p. 297-306 10 p. |
artikel |
13 |
A parallel simulated annealing method for the vehicle routing problem with simultaneous pickup–delivery and time windows
|
Wang, Chao |
|
2015 |
83 |
C |
p. 111-122 12 p. |
artikel |
14 |
A technical note on ‘erratum to “Finding the most efficient DMUs in DEA: An improved integrated model” [Comput. Indus. Eng. 52 (2007) 71–77]’
|
Toloo, Mehdi |
|
2015 |
83 |
C |
p. 261-263 3 p. |
artikel |
15 |
Call for Papers
|
|
|
2015 |
83 |
C |
p. I-II nvt p. |
artikel |
16 |
Combining ant colony optimization algorithm and dynamic programming technique for solving the covering salesman problem
|
Salari, Majid |
|
2015 |
83 |
C |
p. 244-251 8 p. |
artikel |
17 |
Group decision making with fuzzy linguistic preference relations via cooperative games method
|
Tao, Zhifu |
|
2015 |
83 |
C |
p. 184-192 9 p. |
artikel |
18 |
Harmony search-based multi-objective optimization model for multi-site order planning with multiple uncertainties and learning effects
|
Guo, Z.X. |
|
2015 |
83 |
C |
p. 74-90 17 p. |
artikel |
19 |
IFC Area editor list
|
|
|
2015 |
83 |
C |
p. IFC- 1 p. |
artikel |
20 |
Integrated scheduling of production and distribution to minimize total cost using an improved ant colony optimization method
|
Cheng, Ba-Yi |
|
2015 |
83 |
C |
p. 217-225 9 p. |
artikel |
21 |
Metaheuristic optimization for the Single-Item Dynamic Lot Sizing problem with returns and remanufacturing
|
Parsopoulos, K.E. |
|
2015 |
83 |
C |
p. 307-315 9 p. |
artikel |
22 |
Minimizing total weighted completion time under makespan constraint for two-agent scheduling with job-dependent aging effects
|
Choi, Jin Young |
|
2015 |
83 |
C |
p. 237-243 7 p. |
artikel |
23 |
Modeling and solving the project selection and scheduling
|
Tofighian, Ali Asghar |
|
2015 |
83 |
C |
p. 30-38 9 p. |
artikel |
24 |
Optimal staffing strategies for points of dispensing
|
Hernandez, Ivan |
|
2015 |
83 |
C |
p. 172-183 12 p. |
artikel |
25 |
Optimization for two-stage double-cycle operations in container terminals
|
Zhang, Rui |
|
2015 |
83 |
C |
p. 316-326 11 p. |
artikel |
26 |
Pre 1 Editorial Board
|
|
|
2015 |
83 |
C |
p. i- 1 p. |
artikel |
27 |
Project scheduling under partially renewable resources and resource consumption during setup operations
|
Okubo, Hironori |
|
2015 |
83 |
C |
p. 91-99 9 p. |
artikel |
28 |
Robust supervision using shared-buffers in automated manufacturing systems with unreliable resources
|
Yue, Hao |
|
2015 |
83 |
C |
p. 139-150 12 p. |
artikel |
29 |
Study of TBM cutterhead fatigue crack propagation life based on multi-degree of freedom coupling system dynamics
|
Ling, Jingxiu |
|
2015 |
83 |
C |
p. 1-14 14 p. |
artikel |
30 |
Transportation cost allocation on a fixed route
|
Sun, Lei |
|
2015 |
83 |
C |
p. 61-73 13 p. |
artikel |
31 |
Uncertainty index based consistency measurement and priority generation with interval probabilities in the analytic hierarchy process
|
Wang, Zhou-Jing |
|
2015 |
83 |
C |
p. 252-260 9 p. |
artikel |