nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A bi-objective analysis of the r-all-neighbor p-center problem
|
Medal, Hugh R. |
|
2014 |
72 |
C |
p. 114-128 15 p. |
artikel |
2 |
A clustering method for evaluating the environmental performance based on slacks-based measure
|
Bi, Gong-bing |
|
2014 |
72 |
C |
p. 169-177 9 p. |
artikel |
3 |
A distance-based aggregation approach for group decision making with interval preference orderings
|
Xu, Yejun |
|
2014 |
72 |
C |
p. 178-186 9 p. |
artikel |
4 |
A fuzzy approach for the reviewer assignment problem
|
Daş, G. Sena |
|
2014 |
72 |
C |
p. 50-57 8 p. |
artikel |
5 |
A hybrid simulation and genetic algorithm approach to determine the optimal scheduling templates for open access clinics admitting walk-in patients
|
Peng, Yidong |
|
2014 |
72 |
C |
p. 282-296 15 p. |
artikel |
6 |
A multi-objective harmony search algorithm to optimize multi-server location–allocation problem in congested systems
|
Hajipour, Vahid |
|
2014 |
72 |
C |
p. 187-197 11 p. |
artikel |
7 |
A new algorithm for resolution of the quadratic programming problem with fuzzy relation inequality constraints
|
Abbasi Molai, Ali |
|
2014 |
72 |
C |
p. 306-314 9 p. |
artikel |
8 |
An optimization approach for the lot sizing and scheduling problem in the brewery industry
|
Baldo, Tamara A. |
|
2014 |
72 |
C |
p. 58-71 14 p. |
artikel |
9 |
A novel variable selection approach based on co-linearity index to discover optimal process settings by analysing mixed data
|
Giannetti, C. |
|
2014 |
72 |
C |
p. 217-229 13 p. |
artikel |
10 |
A sequential priority-based heuristic for scheduling material handling in a satellite cross-dock
|
Maknoon, M.Y. |
|
2014 |
72 |
C |
p. 43-49 7 p. |
artikel |
11 |
A simulation optimization framework for ambulance deployment and relocation problems
|
Zhen, Lu |
|
2014 |
72 |
C |
p. 12-23 12 p. |
artikel |
12 |
A two-level replenishment frequency model for TOC supply chain replenishment systems under capacity constraint
|
Wu, Horng-Huei |
|
2014 |
72 |
C |
p. 152-159 8 p. |
artikel |
13 |
Computer-aided variables sampling inspection plans for compositional proportions and measurement error adjustment
|
Wu, Haizhen |
|
2014 |
72 |
C |
p. 239-246 8 p. |
artikel |
14 |
Computing marginal and joint Birnbaum, and Barlow–Proschan importances in weighted-k-out-of-n:G systems
|
Eryilmaz, Serkan |
|
2014 |
72 |
C |
p. 255-260 6 p. |
artikel |
15 |
Deadlock-free scheduling for flexible manufacturing systems using Petri nets and heuristic search
|
Lei, Hang |
|
2014 |
72 |
C |
p. 297-305 9 p. |
artikel |
16 |
Fuzzy multi-objective recoverable remanufacturing planning decisions involving multiple components and multiple machines
|
Su, Tai-Sheng |
|
2014 |
72 |
C |
p. 72-83 12 p. |
artikel |
17 |
Fuzzy stochastic solid transportation problem using fuzzy goal programming approach
|
Giri, Pravash Kumar |
|
2014 |
72 |
C |
p. 160-168 9 p. |
artikel |
18 |
IFC Area editor list
|
|
|
2014 |
72 |
C |
p. IFC- 1 p. |
artikel |
19 |
LASSO-based diagnosis scheme for multistage processes with binary data
|
Shang, Yanfen |
|
2014 |
72 |
C |
p. 198-205 8 p. |
artikel |
20 |
Minimizing total tardiness for scheduling identical parallel machines with family setups
|
Schaller, Jeffrey E. |
|
2014 |
72 |
C |
p. 274-281 8 p. |
artikel |
21 |
Modeling and analysis of a product substitution strategy for a stochastic manufacturing/remanufacturing system
|
Ahiska, S. Sebnem |
|
2014 |
72 |
C |
p. 1-11 11 p. |
artikel |
22 |
Modeling and risk analysis of virtual project team through project life cycle with fuzzy approach
|
Ghaffari, Mona |
|
2014 |
72 |
C |
p. 98-105 8 p. |
artikel |
23 |
Multi-phase modified shuffled frog leaping algorithm with extremal optimization for the MDVRP and the MDVRPTW
|
Luo, Jianping |
|
2014 |
72 |
C |
p. 84-97 14 p. |
artikel |
24 |
Optimal allocation and maintenance of multi-state elements in series–parallel systems with common bus performance sharing
|
Xiao, Hui |
|
2014 |
72 |
C |
p. 143-151 9 p. |
artikel |
25 |
Optimization of predetermined standby mode transfers in 1-out-of-N: G systems
|
Levitin, Gregory |
|
2014 |
72 |
C |
p. 106-113 8 p. |
artikel |
26 |
Pre 1 Editorial Board
|
|
|
2014 |
72 |
C |
p. i- 1 p. |
artikel |
27 |
Research on pricing and coordination strategy of green supply chain under hybrid production mode
|
Zhang, Cheng-Tang |
|
2014 |
72 |
C |
p. 24-31 8 p. |
artikel |
28 |
Robust capacitated facility location model for acquisitions under uncertainty
|
De Rosa, Vincenzo |
|
2014 |
72 |
C |
p. 206-216 11 p. |
artikel |
29 |
Supply chain dynamics and the “cross-border effect”: The U.S.–Mexican border’s case
|
Cedillo-Campos, Miguel Gastón |
|
2014 |
72 |
C |
p. 261-273 13 p. |
artikel |
30 |
Supply chain network design under oligopolistic price and service level competition with foresight
|
Rezapour, Shabnam |
|
2014 |
72 |
C |
p. 129-142 14 p. |
artikel |
31 |
The effect of responsiveness of the control-decision system to the performance of FMS
|
Chan, Felix T.S. |
|
2014 |
72 |
C |
p. 32-42 11 p. |
artikel |
32 |
The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
|
Correia, Isabel |
|
2014 |
72 |
C |
p. 230-238 9 p. |
artikel |
33 |
Vertical cooperative advertising in a retailer duopoly
|
Aust, Gerhard |
|
2014 |
72 |
C |
p. 247-254 8 p. |
artikel |