nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A collaborative and artificial intelligence approach for semiconductor cost forecasting
|
Chen, Toly |
|
2013 |
66 |
2 |
p. 476-484 9 p. |
artikel |
2 |
A decision support system assessing the trust level in supply chains based on information sharing dimensions
|
Ayadi, Omar |
|
2013 |
66 |
2 |
p. 242-257 16 p. |
artikel |
3 |
A multinomial model for the machine interference problem with different service types and multiple operators
|
Hadad, Yossi |
|
2013 |
66 |
2 |
p. 264-273 10 p. |
artikel |
4 |
An application of a merit function for solving convex programming problems
|
Nazemi, Alireza |
|
2013 |
66 |
2 |
p. 212-221 10 p. |
artikel |
5 |
An approach for multiple attribute group decision making problems with interval-valued intuitionistic trapezoidal fuzzy numbers
|
Wu, Jian |
|
2013 |
66 |
2 |
p. 311-324 14 p. |
artikel |
6 |
An efficient approach to determine cell formation, cell layout and intracellular machine sequence in cellular manufacturing systems
|
Chang, Chin-Chih |
|
2013 |
66 |
2 |
p. 438-450 13 p. |
artikel |
7 |
An evolutionary search procedure for optimizing time–cost performance of projects under multiple renewable resource constraints
|
Zamani, Reza |
|
2013 |
66 |
2 |
p. 451-460 10 p. |
artikel |
8 |
A new network epsilon-based DEA model for supply chain performance evaluation
|
Tavana, Madjid |
|
2013 |
66 |
2 |
p. 501-513 13 p. |
artikel |
9 |
A new replacement warranty policy indexed by the product’s correlated failure and usage time
|
Tsoukalas, M.Z. |
|
2013 |
66 |
2 |
p. 203-211 9 p. |
artikel |
10 |
A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques
|
Almomani, Mohammed Ali |
|
2013 |
66 |
2 |
p. 461-469 9 p. |
artikel |
11 |
A single chart with supplementary runs rules for monitoring the mean vector and the covariance matrix of multivariate processes
|
Costa, Antônio F.B. |
|
2013 |
66 |
2 |
p. 431-437 7 p. |
artikel |
12 |
A tri-level programming model based on Conditional Value-at-Risk for three-stage supply chain management
|
Xu, Xinsheng |
|
2013 |
66 |
2 |
p. 470-475 6 p. |
artikel |
13 |
Consideration of purchase dependence in inventory management
|
Park, Changkyu |
|
2013 |
66 |
2 |
p. 274-285 12 p. |
artikel |
14 |
Extension of Fuzzy ELECTRE based on VIKOR method
|
Zandi, A. |
|
2013 |
66 |
2 |
p. 258-263 6 p. |
artikel |
15 |
Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties
|
Le, Cao Vinh |
|
2013 |
66 |
2 |
p. 406-417 12 p. |
artikel |
16 |
IFC Area editor list
|
|
|
2013 |
66 |
2 |
p. IFC- 1 p. |
artikel |
17 |
Improving the efficiency of a mixed integer linear programming based approach for multi-class classification problem
|
Maskooki, Alaleh |
|
2013 |
66 |
2 |
p. 383-388 6 p. |
artikel |
18 |
Information dissemination framework for context-aware products
|
Kubler, Sylvain |
|
2013 |
66 |
2 |
p. 485-500 16 p. |
artikel |
19 |
Metaheuristics for order batching and sequencing in manual order picking systems
|
Henn, Sebastian |
|
2013 |
66 |
2 |
p. 338-351 14 p. |
artikel |
20 |
Optimal resource allocation response to a smallpox outbreak
|
Ren, Yingtao |
|
2013 |
66 |
2 |
p. 325-337 13 p. |
artikel |
21 |
Optimizing reliability-based robust design model using multi-objective genetic algorithm
|
Rathod, Vijay |
|
2013 |
66 |
2 |
p. 301-310 10 p. |
artikel |
22 |
Pre 1 Editorial Board
|
|
|
2013 |
66 |
2 |
p. i- 1 p. |
artikel |
23 |
Preemptive scheduling on two parallel machines with a single server
|
Jiang, Yiwei |
|
2013 |
66 |
2 |
p. 514-518 5 p. |
artikel |
24 |
Reactive scheduling in a job shop where jobs arrive over time
|
Nie, Li |
|
2013 |
66 |
2 |
p. 389-405 17 p. |
artikel |
25 |
Relationship preserving multi-attribute reverse auction: A web-based experimental analysis
|
Ray, Arun K. |
|
2013 |
66 |
2 |
p. 418-430 13 p. |
artikel |
26 |
Reliability evaluation of a stochastic-flow distribution network with delivery spoilage
|
Lin, Yi-Kuei |
|
2013 |
66 |
2 |
p. 352-359 8 p. |
artikel |
27 |
Resource constrained project scheduling problem with discounted earliness–tardiness penalties: Mathematical modeling and solving procedure
|
Khoshjahan, Yazdan |
|
2013 |
66 |
2 |
p. 293-300 8 p. |
artikel |
28 |
Retrial queuing system with Markovian arrival flow and phase-type service time distribution
|
Dudina, Olga |
|
2013 |
66 |
2 |
p. 360-373 14 p. |
artikel |
29 |
Supplier selection model with contingency planning for supplier failures
|
Ruiz-Torres, Alex J. |
|
2013 |
66 |
2 |
p. 374-382 9 p. |
artikel |
30 |
The induced linguistic continuous ordered weighted geometric operator and its application to group decision making
|
Zhou, Ligang |
|
2013 |
66 |
2 |
p. 222-232 11 p. |
artikel |
31 |
Using DEA to find the best partner for a horizontal cooperation
|
Lozano, S. |
|
2013 |
66 |
2 |
p. 286-292 7 p. |
artikel |
32 |
Value of condition monitoring in infrastructure maintenance
|
Srinivasan, Rengarajan |
|
2013 |
66 |
2 |
p. 233-241 9 p. |
artikel |