nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A concurrent solution for intra-cell flow path layouts and I/O point locations of cells in a cellular manufacturing system
|
Ho, Ying-Chin |
|
2011 |
60 |
4 |
p. 614-634 21 p. |
artikel |
2 |
A Lexicographic Nelder–Mead simulation optimization method to solve multi-criteria problems
|
Kuriger, Glenn W. |
|
2011 |
60 |
4 |
p. 555-565 11 p. |
artikel |
3 |
Allocation of quality control stations in multistage manufacturing systems
|
Shetwan, Ali G. |
|
2011 |
60 |
4 |
p. 473-484 12 p. |
artikel |
4 |
An efficient memetic algorithm for solving the job shop scheduling problem
|
Gao, Liang |
|
2011 |
60 |
4 |
p. 699-705 7 p. |
artikel |
5 |
A network flow model for clustering segments and minimizing total maintenance and rehabilitation cost
|
Wang, I-Lin |
|
2011 |
60 |
4 |
p. 593-601 9 p. |
artikel |
6 |
A new mixed integer linear model for selecting the best decision making units in data envelopment analysis
|
Foroughi, A.A. |
|
2011 |
60 |
4 |
p. 550-554 5 p. |
artikel |
7 |
An innovative framework of collaborative-based workflow in Development Chain Management
|
Luh, Yuan-Ping |
|
2011 |
60 |
4 |
p. 845-862 18 p. |
artikel |
8 |
Approximate dynamic programming for an inventory problem: Empirical comparison
|
Katanyukul, Tatpong |
|
2011 |
60 |
4 |
p. 719-743 25 p. |
artikel |
9 |
A simple and robust Simulated Annealing algorithm for scheduling workover rigs on onshore oil fields
|
Mattos Ribeiro, Glaydston |
|
2011 |
60 |
4 |
p. 519-526 8 p. |
artikel |
10 |
A study on the life of an innovative product using a Bayesian approach
|
Ho, Jyh-Wen |
|
2011 |
60 |
4 |
p. 666-676 11 p. |
artikel |
11 |
A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations
|
Cheng, T.C.E. |
|
2011 |
60 |
4 |
p. 534-541 8 p. |
artikel |
12 |
Author Index
|
|
|
2011 |
60 |
4 |
p. V-VI nvt p. |
artikel |
13 |
Constructing a hybrid Kansei engineering system based on multiple affective responses: Application to product form design
|
Yang, Chih-Chieh |
|
2011 |
60 |
4 |
p. 760-768 9 p. |
artikel |
14 |
Contents contd. from OBC
|
|
|
2011 |
60 |
4 |
p. VII-VIII nvt p. |
artikel |
15 |
Coupled-task scheduling on a single machine subject to a fixed-job-sequence
|
Hwang, F.J. |
|
2011 |
60 |
4 |
p. 690-698 9 p. |
artikel |
16 |
Data mining for quality control: Burr detection in the drilling process
|
Ferreiro, Susana |
|
2011 |
60 |
4 |
p. 801-810 10 p. |
artikel |
17 |
Development of a sequential robust–tolerance design model for a destructive quality characteristic
|
Shin, Sangmun |
|
2011 |
60 |
4 |
p. 777-789 13 p. |
artikel |
18 |
Discrete particle swarm optimization based on estimation of distribution for terminal assignment problems
|
Wang, Jiahai |
|
2011 |
60 |
4 |
p. 566-575 10 p. |
artikel |
19 |
Economic design of time-between-events control chart system
|
Zhang, H.Y. |
|
2011 |
60 |
4 |
p. 485-492 8 p. |
artikel |
20 |
Erratum to “A fuzzy trust evaluation method for knowledge sharing in virtual enterprises” [Comput. Indus. Eng. 59 (2010) 853–864]
|
Chen, Tsung-Yi |
|
2011 |
60 |
4 |
p. 872- 1 p. |
artikel |
21 |
Estimation of distribution algorithm for permutation flow shops with total flowtime minimization
|
Zhang, Yi |
|
2011 |
60 |
4 |
p. 706-718 13 p. |
artikel |
22 |
Firing sequences backward algorithm for simple assembly line balancing problem of type 1
|
Kilincci, Ozcan |
|
2011 |
60 |
4 |
p. 830-839 10 p. |
artikel |
23 |
Flow shop scheduling to minimize makespan with decreasing time-dependent job processing times
|
Wang, Xiao-Yuan |
|
2011 |
60 |
4 |
p. 840-844 5 p. |
artikel |
24 |
Fuzzy multi attribute group decision making method to achieve consensus under the consideration of degrees of confidence of experts’ opinions
|
Guha, Debashree |
|
2011 |
60 |
4 |
p. 493-504 12 p. |
artikel |
25 |
IFC Area editor list
|
|
|
2011 |
60 |
4 |
p. IFC- 1 p. |
artikel |
26 |
Intelligent diagnosis method for rolling element bearing faults using possibility theory and neural network
|
Wang, Huaqing |
|
2011 |
60 |
4 |
p. 511-518 8 p. |
artikel |
27 |
Local branching-based algorithms for the disjunctively constrained knapsack problem
|
Akeb, Hakim |
|
2011 |
60 |
4 |
p. 811-820 10 p. |
artikel |
28 |
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown
|
Chiu, Yuan-Shyi Peter |
|
2011 |
60 |
4 |
p. 576-584 9 p. |
artikel |
29 |
Minimizing deviations of input and output weights from their means in data envelopment analysis
|
Lam, Kim Fung |
|
2011 |
60 |
4 |
p. 527-533 7 p. |
artikel |
30 |
Model and heuristic for berth allocation in tidal bulk ports with stock level constraints
|
Barros, Victor Hugo |
|
2011 |
60 |
4 |
p. 606-613 8 p. |
artikel |
31 |
Monitoring roundness profiles based on an unsupervised neural network algorithm
|
Pacella, Massimo |
|
2011 |
60 |
4 |
p. 677-689 13 p. |
artikel |
32 |
Online deadline scheduling with preemption penalties
|
Zheng, Feifeng |
|
2011 |
60 |
4 |
p. 542-549 8 p. |
artikel |
33 |
Optimal maintenance time for imperfect maintenance actions on repairable product
|
Tsai, Tzong-Ru |
|
2011 |
60 |
4 |
p. 744-749 6 p. |
artikel |
34 |
Pre 1 Editorial Board
|
|
|
2011 |
60 |
4 |
p. i- 1 p. |
artikel |
35 |
Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming
|
Moghaddam, Kamran S. |
|
2011 |
60 |
4 |
p. 654-665 12 p. |
artikel |
36 |
Reversed fuzzy Petri nets and their application for fault diagnosis
|
Hu, Hesuan |
|
2011 |
60 |
4 |
p. 505-510 6 p. |
artikel |
37 |
Safe controllers design for industrial automation systems
|
Machado, José |
|
2011 |
60 |
4 |
p. 635-653 19 p. |
artikel |
38 |
Single-machine group scheduling with both learning effects and deteriorating jobs
|
Huang, Xue |
|
2011 |
60 |
4 |
p. 750-754 5 p. |
artikel |
39 |
Single-machine scheduling jobs with exponential learning functions
|
Wang, Ji-Bo |
|
2011 |
60 |
4 |
p. 755-759 5 p. |
artikel |
40 |
Some single-machine scheduling problems with a truncation learning effect
|
Wu, Chin-Chia |
|
2011 |
60 |
4 |
p. 790-795 6 p. |
artikel |
41 |
Study on product quality tracing technology in supply chain
|
Zhang, G.B. |
|
2011 |
60 |
4 |
p. 863-871 9 p. |
artikel |
42 |
The dynamic transfer batch-size decision for thin film transistor–liquid crystal display array manufacturing by artificial neural-network
|
Yang, Taho |
|
2011 |
60 |
4 |
p. 769-776 8 p. |
artikel |
43 |
The voting analytic hierarchy process method for discriminating among efficient decision making units in data envelopment analysis
|
Soltanifar, Mehdi |
|
2011 |
60 |
4 |
p. 585-592 8 p. |
artikel |
44 |
Two due date assignment problems with position-dependent processing time on a single-machine
|
Hsu, Chou-Jung |
|
2011 |
60 |
4 |
p. 796-800 5 p. |
artikel |
45 |
Unrelated parallel-machine scheduling with deteriorating maintenance activities
|
Cheng, T.C.E. |
|
2011 |
60 |
4 |
p. 602-605 4 p. |
artikel |
46 |
Urban pickup and delivery problem considering time-dependent fuzzy velocity
|
Sifa, Zheng |
|
2011 |
60 |
4 |
p. 821-829 9 p. |
artikel |
47 |
Volume Contents
|
|
|
2011 |
60 |
4 |
p. I-IV nvt p. |
artikel |