nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A contemporary study into the application of neural network techniques employed to automate CAD/CAM integration for die manufacture
|
Ding, Lian |
|
2009 |
57 |
4 |
p. 1457-1471 15 p. |
artikel |
2 |
A deteriorating jobs problem with quadratic function of job lateness
|
Chung, Yu-Hsiang |
|
2009 |
57 |
4 |
p. 1182-1186 5 p. |
artikel |
3 |
A discrete-time retrial queueing system with starting failures, Bernoulli feedback and general retrial times
|
Atencia, I. |
|
2009 |
57 |
4 |
p. 1291-1299 9 p. |
artikel |
4 |
A model for allocating resources during hospital evacuations
|
Tayfur, Esengul |
|
2009 |
57 |
4 |
p. 1313-1323 11 p. |
artikel |
5 |
Analyzing the design and management of biomass-to-biorefinery supply chain
|
Ekşioğlu, Sandra D. |
|
2009 |
57 |
4 |
p. 1342-1352 11 p. |
artikel |
6 |
An evaluation model of buyer–supplier relationships in high-tech industry — The case of an electronic components manufacturer in Taiwan
|
Lee, Amy H.I. |
|
2009 |
57 |
4 |
p. 1417-1430 14 p. |
artikel |
7 |
A new bidirectional heuristic for the assembly line balancing problem
|
Yeh, Din-Horng |
|
2009 |
57 |
4 |
p. 1155-1160 6 p. |
artikel |
8 |
An improved grey-based approach for early manufacturing data forecasting
|
Li, Der-Chiang |
|
2009 |
57 |
4 |
p. 1161-1167 7 p. |
artikel |
9 |
A process-oriented multi-agent system development approach to support the cooperation-activities of concurrent new product development
|
Juan, Yeh-Chun |
|
2009 |
57 |
4 |
p. 1363-1376 14 p. |
artikel |
10 |
A production inventory model with stock dependent demand incorporating learning and inflationary effect in a random planning horizon: A fuzzy genetic algorithm with varying population size approach
|
Roy, Arindam |
|
2009 |
57 |
4 |
p. 1324-1335 12 p. |
artikel |
11 |
Assembly line balancing with station paralleling
|
Ege, Yunus |
|
2009 |
57 |
4 |
p. 1218-1225 8 p. |
artikel |
12 |
Author Index
|
|
|
2009 |
57 |
4 |
p. VII-VIII nvt p. |
artikel |
13 |
Contents continued from OBC
|
|
|
2009 |
57 |
4 |
p. XII- 1 p. |
artikel |
14 |
Contribution of simulation to the optimization of inspection plans for multi-stage manufacturing systems
|
Vaghefi, A. |
|
2009 |
57 |
4 |
p. 1226-1234 9 p. |
artikel |
15 |
Corrigendum to “Integrated process planning and scheduling in a manufacturing supply chain” [Comput. Indust. Eng. 54 (4) (2008) 1048–1061]
|
Moon, Chiung |
|
2009 |
57 |
4 |
p. 1484- 1 p. |
artikel |
16 |
Cost-effective ordering policies for inventory systems with emergency order
|
Giri, B.C. |
|
2009 |
57 |
4 |
p. 1336-1341 6 p. |
artikel |
17 |
Designing a decision support system to evaluate and select suppliers using fuzzy analytic network process
|
Razmi, Jafar |
|
2009 |
57 |
4 |
p. 1282-1290 9 p. |
artikel |
18 |
Development of genetic fuzzy logic controllers for complex production systems
|
Homayouni, Seyed Mahdi |
|
2009 |
57 |
4 |
p. 1247-1257 11 p. |
artikel |
19 |
Evaluating firm’s sustainable production indicators in uncertainty
|
Tseng, Ming-Lang |
|
2009 |
57 |
4 |
p. 1393-1403 11 p. |
artikel |
20 |
Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach
|
Liang, Tien-Fu |
|
2009 |
57 |
4 |
p. 1407-1416 10 p. |
artikel |
21 |
Goal programming approaches to obtain the priority vectors from the intuitionistic fuzzy preference relations
|
Gong, Zai-Wu |
|
2009 |
57 |
4 |
p. 1187-1193 7 p. |
artikel |
22 |
Innovative reliability allocation using the maximal entropy ordered weighted averaging method
|
Chang, Yung-Chia |
|
2009 |
57 |
4 |
p. 1274-1281 8 p. |
artikel |
23 |
Late work minimization in flow shops by a genetic algorithm
|
Pesch, Erwin |
|
2009 |
57 |
4 |
p. 1202-1209 8 p. |
artikel |
24 |
Local and global deadlock prevention policies for resource allocation systems using partially generated reachability graphs
|
Hu, Hesuan |
|
2009 |
57 |
4 |
p. 1168-1181 14 p. |
artikel |
25 |
Location of banking automatic teller machines based on convolution
|
Aldajani, Mansour A. |
|
2009 |
57 |
4 |
p. 1194-1201 8 p. |
artikel |
26 |
Maintenance of deteriorating single server queues with random shocks
|
Yang, Won Seok |
|
2009 |
57 |
4 |
p. 1404-1406 3 p. |
artikel |
27 |
Metric spaces of fuzzy variables
|
Tang, Wansheng |
|
2009 |
57 |
4 |
p. 1268-1273 6 p. |
artikel |
28 |
Modeling and scheduling a case of flexible flowshops: Total weighted tardiness minimization
|
Naderi, B. |
|
2009 |
57 |
4 |
p. 1258-1267 10 p. |
artikel |
29 |
Multi-objective optimisation method for posture prediction and analysis with consideration of fatigue effect and its application case
|
Ma, Liang |
|
2009 |
57 |
4 |
p. 1235-1246 12 p. |
artikel |
30 |
Optimizing goods assignment and the vehicle routing problem with time-dependent travel speeds
|
Kuo, Yiyo |
|
2009 |
57 |
4 |
p. 1385-1392 8 p. |
artikel |
31 |
Pre 1 Editorial Board
|
|
|
2009 |
57 |
4 |
p. i- 1 p. |
artikel |
32 |
Rapid design and reconfiguration of Petri net models for reconfigurable manufacturing cells with improved net rewriting systems and activity diagrams
|
Li, Jun |
|
2009 |
57 |
4 |
p. 1431-1451 21 p. |
artikel |
33 |
Reverse engineering with a structured light system
|
Park, Sang C. |
|
2009 |
57 |
4 |
p. 1377-1384 8 p. |
artikel |
34 |
Reviewer Acknowledgment
|
|
|
2009 |
57 |
4 |
p. v-ix nvt p. |
artikel |
35 |
Selection and scheduling in a virtual organisation environment with a service broker
|
Ahonen, Hannu |
|
2009 |
57 |
4 |
p. 1353-1362 10 p. |
artikel |
36 |
Single-machine scheduling with learning effect and deteriorating jobs
|
Wang, Ji-Bo |
|
2009 |
57 |
4 |
p. 1452-1456 5 p. |
artikel |
37 |
The interaction of the market competition between LCD TV and PDP TV
|
Kreng, Victor B. |
|
2009 |
57 |
4 |
p. 1210-1217 8 p. |
artikel |
38 |
The vehicle routing problem: A taxonomic review
|
Eksioglu, Burak |
|
2009 |
57 |
4 |
p. 1472-1483 12 p. |
artikel |
39 |
Using Minimum Quantization Error chart for the monitoring of process states in multivariate manufacturing processes
|
Yu, Jian-Bo |
|
2009 |
57 |
4 |
p. 1300-1312 13 p. |
artikel |
40 |
Volume Contents
|
|
|
2009 |
57 |
4 |
p. I-VI nvt p. |
artikel |