nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A DE-based approach to no-wait flow-shop scheduling
|
Qian, B. |
|
2009 |
57 |
3 |
p. 787-805 19 p. |
artikel |
2 |
A dynamic load-balancing scheme for the parcel hub-scheduling problem
|
McWilliams, Douglas L. |
|
2009 |
57 |
3 |
p. 958-962 5 p. |
artikel |
3 |
A genetic algorithm-based approach for solving the resource-sharing and scheduling problem
|
Pinto, Gaby |
|
2009 |
57 |
3 |
p. 1131-1143 13 p. |
artikel |
4 |
A genetic approach to automate preliminary design of gear drives
|
Gologlu, Cevdet |
|
2009 |
57 |
3 |
p. 1043-1051 9 p. |
artikel |
5 |
A linear programming model for determining ordered weighted averaging operator weights with maximal Yager’s entropy
|
Wu, Jian |
|
2009 |
57 |
3 |
p. 742-747 6 p. |
artikel |
6 |
A Markovian model for the hybrid manufacturing planning and control method ‘Double Speed Single Production Line’
|
Cheikhrouhou, Naoufel |
|
2009 |
57 |
3 |
p. 1022-1032 11 p. |
artikel |
7 |
A measure of cross-training benefit versus job skill specialization
|
Marentette, Kenneth A. |
|
2009 |
57 |
3 |
p. 937-940 4 p. |
artikel |
8 |
A methodology for short-term electric load forecasting based on specialized recursive digital filters
|
Maia, C.A. |
|
2009 |
57 |
3 |
p. 724-731 8 p. |
artikel |
9 |
A mixed inspection policy for CSP-1 and precise inspection under inspection errors and return cost
|
Yu, Hong-Fwu |
|
2009 |
57 |
3 |
p. 652-659 8 p. |
artikel |
10 |
An adaptive neuro-fuzzy model for prediction of student’s academic performance
|
Taylan, Osman |
|
2009 |
57 |
3 |
p. 732-741 10 p. |
artikel |
11 |
An evolutionary algorithm for assembly job shop with part sharing
|
Chan, Felix T.S. |
|
2009 |
57 |
3 |
p. 641-651 11 p. |
artikel |
12 |
A new algorithm for complex product flexible scheduling with constraint between jobs
|
Xie, Zhiqiang |
|
2009 |
57 |
3 |
p. 766-772 7 p. |
artikel |
13 |
A new mixed integer linear programming model for product development using quality function deployment
|
Delice, Elif Kılıç |
|
2009 |
57 |
3 |
p. 906-912 7 p. |
artikel |
14 |
An improved energy landscape paving algorithm for the problem of packing circles into a larger containing circle
|
Liu, Jingfa |
|
2009 |
57 |
3 |
p. 1144-1149 6 p. |
artikel |
15 |
An integrated framework for the development of radio frequency identification technology in the logistics and supply chain management
|
Lin, L.C. |
|
2009 |
57 |
3 |
p. 832-842 11 p. |
artikel |
16 |
An optimization algorithm for cutting stock problems in the TFT-LCD industry
|
Tsai, Jung-Fa |
|
2009 |
57 |
3 |
p. 913-919 7 p. |
artikel |
17 |
An optimization approach for joint pricing and ordering problem in an integrated inventory system with order-size dependent trade credit
|
Ouyang, Liang-Yuh |
|
2009 |
57 |
3 |
p. 920-930 11 p. |
artikel |
18 |
A resource-constrained assembly job shop scheduling problem with Lot Streaming technique
|
Wong, T.C. |
|
2009 |
57 |
3 |
p. 983-995 13 p. |
artikel |
19 |
A single-machine scheduling problem with learning effects in intermittent batch production
|
Yang, Dar-Li |
|
2009 |
57 |
3 |
p. 762-765 4 p. |
artikel |
20 |
A spectral clustering algorithm for manufacturing cell formation
|
Oliveira, S. |
|
2009 |
57 |
3 |
p. 1008-1014 7 p. |
artikel |
21 |
A system-centric scheduling policy for optimizing objectives of application and resource in grid computing
|
Chunlin, Li |
|
2009 |
57 |
3 |
p. 1052-1061 10 p. |
artikel |
22 |
Contents cont. from OBC
|
|
|
2009 |
57 |
3 |
p. I-II nvt p. |
artikel |
23 |
Development of an adaptive response surface method for optimization of computation-intensive models
|
Steenackers, G. |
|
2009 |
57 |
3 |
p. 847-855 9 p. |
artikel |
24 |
Dwelling time probability density distribution of instances in a workflow model
|
Sheng, Liu |
|
2009 |
57 |
3 |
p. 874-879 6 p. |
artikel |
25 |
Economic production quantity with rework process at a single-stage manufacturing system with planned backorders
|
Cárdenas-Barrón, Leopoldo Eduardo |
|
2009 |
57 |
3 |
p. 1105-1113 9 p. |
artikel |
26 |
End-of-life impact reduction through analysis and redistribution of disassembly depth: A case study in electronic device redesign
|
Giudice, Fabio |
|
2009 |
57 |
3 |
p. 677-690 14 p. |
artikel |
27 |
Enhancing rubber component reliability by response model
|
Wang, Chung-Ho |
|
2009 |
57 |
3 |
p. 806-812 7 p. |
artikel |
28 |
Enhancing the yield competitiveness of a semiconductor fabrication factory with dynamic capacity re-allocation
|
Chen, Toly |
|
2009 |
57 |
3 |
p. 931-936 6 p. |
artikel |
29 |
Erratum to “Design of practical optimum JIT systems by integration of computer simulation and analysis of variance” [Computers & Industrial Engineering Volume (49/4) 504–519]
|
Azadeh, A. |
|
2009 |
57 |
3 |
p. 1154- 1 p. |
artikel |
30 |
Fast and robust techniques for the euclidean p-median problem with uniform weights
|
Lim, G.J. |
|
2009 |
57 |
3 |
p. 896-905 10 p. |
artikel |
31 |
Finite dominating sets for the multi-facility ordered median problem in networks and algorithmic applications
|
Tang, Huajun |
|
2009 |
57 |
3 |
p. 707-712 6 p. |
artikel |
32 |
Generating subproblems in branch and bound algorithms for parallel machines scheduling problem
|
Shim, Sang-Oh |
|
2009 |
57 |
3 |
p. 1150-1153 4 p. |
artikel |
33 |
Heuristics for a multiperiod inventory routing problem with production decisions
|
Bard, Jonathan F. |
|
2009 |
57 |
3 |
p. 713-723 11 p. |
artikel |
34 |
Horizontal collaboration in semiconductor manufacturing industry supply chain: An evaluation of collaboration intensity index
|
Bahinipati, Bikram K. |
|
2009 |
57 |
3 |
p. 880-895 16 p. |
artikel |
35 |
Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints
|
Jabbarizadeh, F. |
|
2009 |
57 |
3 |
p. 949-957 9 p. |
artikel |
36 |
Improving the delivery efficiency of the customer order scheduling problem in a job shop
|
Hsu, Sheng-Yuan |
|
2009 |
57 |
3 |
p. 856-866 11 p. |
artikel |
37 |
Integration of CAD and boundary element analysis through subdivision methods
|
Wang, L. |
|
2009 |
57 |
3 |
p. 691-698 8 p. |
artikel |
38 |
Linkages between manufacturing strategy, benchmarking, performance measurement and business process reengineering
|
Herzog, Natasa Vujica |
|
2009 |
57 |
3 |
p. 963-975 13 p. |
artikel |
39 |
Lot sizing and sequencing optimisation at an animal-feed plant
|
Toso, Eli A.V. |
|
2009 |
57 |
3 |
p. 813-821 9 p. |
artikel |
40 |
Mathematical modeling and solving procedure of the planar storage location assignment problem
|
Park, Changkyu |
|
2009 |
57 |
3 |
p. 1062-1071 10 p. |
artikel |
41 |
Metamodels for variable importance decomposition with applications to probabilistic engineering design
|
Sathyanarayanamurthy, Hemalatha |
|
2009 |
57 |
3 |
p. 996-1007 12 p. |
artikel |
42 |
Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods
|
Aized, Tauseef |
|
2009 |
57 |
3 |
p. 822-831 10 p. |
artikel |
43 |
Multiple lot-sizing decisions with an interrupted geometric yield and variable production time
|
Hsu, Hsi-Mei |
|
2009 |
57 |
3 |
p. 699-706 8 p. |
artikel |
44 |
On-line SPC with consideration of learning curve
|
Yang, Ling |
|
2009 |
57 |
3 |
p. 1089-1095 7 p. |
artikel |
45 |
Optimal design for inspection and maintenance policy based on the CCC chart
|
Chan, Ling-Yau |
|
2009 |
57 |
3 |
p. 667-676 10 p. |
artikel |
46 |
Optimal run lengths in deteriorating production processes in random fuzzy environments
|
Zhang, Chao |
|
2009 |
57 |
3 |
p. 941-948 8 p. |
artikel |
47 |
Optimal testing resource allocation during module testing considering cost, testing effort and reliability
|
Jha, P.C. |
|
2009 |
57 |
3 |
p. 1122-1130 9 p. |
artikel |
48 |
Optimum process mean and manufacturing quantity settings for serial production system under the quality loss and rectifying inspection plan
|
Chen, Chung-Ho |
|
2009 |
57 |
3 |
p. 1080-1088 9 p. |
artikel |
49 |
Pre 1 Editorial Board
|
|
|
2009 |
57 |
3 |
p. i- 1 p. |
artikel |
50 |
Quality-based supplier selection and evaluation using fuzzy data
|
Shu, Ming-Hung |
|
2009 |
57 |
3 |
p. 1072-1079 8 p. |
artikel |
51 |
Queueing analysis and optimal control of BMAP / G ( a , b ) / 1 / N and BMAP / MSP ( a , b ) / 1 / N systems
|
Banik, A.D. |
|
2009 |
57 |
3 |
p. 748-761 14 p. |
artikel |
52 |
Scheduling with dependent setups and maintenance in a textile company
|
Chen, W.J. |
|
2009 |
57 |
3 |
p. 867-873 7 p. |
artikel |
53 |
Selecting the advanced manufacturing technology using fuzzy multiple attributes group decision making with multiple fuzzy information
|
Chuu, Shian-Jong |
|
2009 |
57 |
3 |
p. 1033-1042 10 p. |
artikel |
54 |
Simple linear profiles monitoring in the presence of within profile autocorrelation
|
Soleimani, Paria |
|
2009 |
57 |
3 |
p. 1015-1021 7 p. |
artikel |
55 |
Simulation-based two-phase genetic algorithm for the capacitated re-entrant line scheduling problem
|
Choi, Jin Young |
|
2009 |
57 |
3 |
p. 660-666 7 p. |
artikel |
56 |
Single-machine scheduling problems with deteriorating jobs and learning effects
|
Sun, Li |
|
2009 |
57 |
3 |
p. 843-846 4 p. |
artikel |
57 |
The valve location problem: Minimizing environmental damage of a spill in long oil pipelines
|
Grigoriev, Alexander |
|
2009 |
57 |
3 |
p. 976-982 7 p. |
artikel |
58 |
Two-echelon supply chain inventory model with controllable lead time and service level constraint
|
Jha, J.K. |
|
2009 |
57 |
3 |
p. 1096-1104 9 p. |
artikel |
59 |
Two-echelon trade credit financing for perishable items in a supply chain when demand depends on both selling price and credit period
|
Thangam, A. |
|
2009 |
57 |
3 |
p. 773-786 14 p. |
artikel |
60 |
Two-machine flow shop problem with effects of deterioration and learning
|
Wang, Ji-Bo |
|
2009 |
57 |
3 |
p. 1114-1121 8 p. |
artikel |