no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A fast parametric deformation mechanism for virtual reality applications
|
Tzong-Ming, Cheng |
|
2009 |
57 |
2 |
p. 520-538 19 p. |
article |
2 |
A multi-agent based agile manufacturing planning and control system
|
Wang, Li-Chih |
|
2009 |
57 |
2 |
p. 620-640 21 p. |
article |
3 |
An overlapping process model to assess schedule risk for new product development
|
Wang, Juite |
|
2009 |
57 |
2 |
p. 460-474 15 p. |
article |
4 |
Applying RFID to reduce delay in import cargo customs clearance process
|
Hsu, Chaug-Ing |
|
2009 |
57 |
2 |
p. 506-519 14 p. |
article |
5 |
A structured approach to describing service for creating a delightful experience
|
Leung, John W.K. |
|
2009 |
57 |
2 |
p. 563-570 8 p. |
article |
6 |
Detection of machine failure: Hidden Markov Model approach
|
Tai, Allen H. |
|
2009 |
57 |
2 |
p. 608-619 12 p. |
article |
7 |
Effects of ad types, positions, animation lengths, and exposure times on the click-through rate of animated online advertisings
|
Lin, Ya-Li |
|
2009 |
57 |
2 |
p. 580-591 12 p. |
article |
8 |
Embedded simulation on a multiprocessor job scheduling system with inspection
|
Yang, Kang-hung |
|
2009 |
57 |
2 |
p. 592-607 16 p. |
article |
9 |
Failure analysis of engineering systems with preventive maintenance and failure interactions
|
Sun, Yong |
|
2009 |
57 |
2 |
p. 539-549 11 p. |
article |
10 |
Flow shop scheduling for separation model of set-up and net process based on Branch-and-Bound method
|
Kurihara, Kenzo |
|
2009 |
57 |
2 |
p. 550-562 13 p. |
article |
11 |
Foreword
|
Wen, Ue-Pyng |
|
2009 |
57 |
2 |
p. 445- 1 p. |
article |
12 |
Pre 1 Editorial Board
|
|
|
2009 |
57 |
2 |
p. i- 1 p. |
article |
13 |
Study of the wireless/wire integration CRM Gateway for the effective application of Event CRM for small and medium sized enterprises
|
Yang, Seungjeong |
|
2009 |
57 |
2 |
p. 571-579 9 p. |
article |
14 |
Superior/Inferior Segment-Discriminated Ant System for combinatorial optimization problems
|
Yang, Feng-Cheng |
|
2009 |
57 |
2 |
p. 475-495 21 p. |
article |
15 |
The worst-practice DEA model with slack-based measurement
|
Liu, Fuh-hwa Franklin |
|
2009 |
57 |
2 |
p. 496-505 10 p. |
article |
16 |
Two general forms of approximation for determining near optimal inspection intervals with non-zero inspection and replacement times in a deteriorating production system
|
Leung, Kit-Nam Francis |
|
2009 |
57 |
2 |
p. 446-459 14 p. |
article |