nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Algorithm for the design of single-stage adaptive kanban system
|
Shahabudeen, P. |
|
2008 |
54 |
4 |
p. 800-820 21 p. |
artikel |
2 |
A multiple stakeholders’ approach to strategic selection decisions
|
Ali Khatami Firouzabadi, S.M. |
|
2008 |
54 |
4 |
p. 851-865 15 p. |
artikel |
3 |
A new heuristic for scheduling the two-stage flowshop with additional resources
|
Figielska, Ewa |
|
2008 |
54 |
4 |
p. 750-763 14 p. |
artikel |
4 |
A note on calculating cost of two-dimensional warranty policy
|
Manna, D.K. |
|
2008 |
54 |
4 |
p. 1071-1077 7 p. |
artikel |
5 |
A Pareto archive particle swarm optimization for multi-objective job shop scheduling
|
Lei, Deming |
|
2008 |
54 |
4 |
p. 960-971 12 p. |
artikel |
6 |
A particle swarm optimization algorithm for the multiple-level warehouse layout design problem
|
Önüt, Semih |
|
2008 |
54 |
4 |
p. 783-799 17 p. |
artikel |
7 |
A two-machine flowshop makespan scheduling problem with deteriorating jobs
|
Lee, Wen-Chiung |
|
2008 |
54 |
4 |
p. 737-749 13 p. |
artikel |
8 |
Author Index
|
|
|
2008 |
54 |
4 |
p. 1095-1096 2 p. |
artikel |
9 |
Close-optimal production and procurement policy for a X-network of added value using lexicographic linear goal programming
|
Zolghadri, Marc |
|
2008 |
54 |
4 |
p. 821-839 19 p. |
artikel |
10 |
Comments on the erratum to “The spatial and temporal consolidation of returned products in a closed-loop supply chain network” [Comput. Ind. Eng. 51 (2006) 309–320]
|
Kannan, G. |
|
2008 |
54 |
4 |
p. 1087-1090 4 p. |
artikel |
11 |
Decomposition heuristic to minimize total cost in a multi-level supply chain network
|
Lee, Byung Ki |
|
2008 |
54 |
4 |
p. 945-959 15 p. |
artikel |
12 |
Evaluating supply partner’s capability for seasonal products using machine learning techniques
|
Hong, Gye-hang |
|
2008 |
54 |
4 |
p. 721-736 16 p. |
artikel |
13 |
Forecast facilitated lot-for-lot ordering in the presence of autocorrelated demand
|
Alwan, Layth C. |
|
2008 |
54 |
4 |
p. 840-850 11 p. |
artikel |
14 |
Fuzzy quantifiers in sensitivity analysis of OWA operator
|
Zarghami, Mahdi |
|
2008 |
54 |
4 |
p. 1006-1018 13 p. |
artikel |
15 |
Integrated process planning and scheduling in a supply chain
|
Moon, Chiung |
|
2008 |
54 |
4 |
p. 1048-1061 14 p. |
artikel |
16 |
Makespan minimization for multiple uniform machines
|
Lin, Chien-Hung |
|
2008 |
54 |
4 |
p. 983-992 10 p. |
artikel |
17 |
Minimizing the completion time of the transfer operations in a central parcel consolidation terminal with unequal-batch-size inbound trailers
|
McWilliams, Douglas L. |
|
2008 |
54 |
4 |
p. 709-720 12 p. |
artikel |
18 |
Multi-period lot-sizing with supplier selection using achievement scalarizing functions
|
Ustun, Ozden |
|
2008 |
54 |
4 |
p. 918-931 14 p. |
artikel |
19 |
Multiple-objective genetic optimization of the spatial design for packing and distribution carton boxes
|
Leung, S.Y.S. |
|
2008 |
54 |
4 |
p. 889-902 14 p. |
artikel |
20 |
Neural network-based simulation metamodels for predicting probability distributions
|
Zobel, Christopher W. |
|
2008 |
54 |
4 |
p. 879-888 10 p. |
artikel |
21 |
Note on the article: Maximum entropy analysis of the M[x]/M/1 queueing system with multiple vacations and server breakdowns
|
Omey, Edward |
|
2008 |
54 |
4 |
p. 1078-1086 9 p. |
artikel |
22 |
On the order of the preference intensities in fuzzy AHP
|
Çakır, Ozan |
|
2008 |
54 |
4 |
p. 993-1005 13 p. |
artikel |
23 |
Optimization of vendor-managed inventory systems in a rolling horizon framework
|
Al-Ameri, Tareq A. |
|
2008 |
54 |
4 |
p. 1019-1047 29 p. |
artikel |
24 |
Performance analysis in a probabilistic re-entrant for an environmental stress testing operation
|
Omar, Mohamed K. |
|
2008 |
54 |
4 |
p. 932-944 13 p. |
artikel |
25 |
Performance measurement and lumped parameter modeling of single server flow lines subject to blocking: An effective process time approach
|
Kock, A.A.A. |
|
2008 |
54 |
4 |
p. 866-878 13 p. |
artikel |
26 |
Pre 1 Editorial Board
|
|
|
2008 |
54 |
4 |
p. i- 1 p. |
artikel |
27 |
Scheduling jobs on parallel machines with setup times and ready times
|
Pfund, Michele |
|
2008 |
54 |
4 |
p. 764-782 19 p. |
artikel |
28 |
Setup times and fast tracking in resource-constrained project scheduling
|
Vanhoucke, Mario |
|
2008 |
54 |
4 |
p. 1062-1070 9 p. |
artikel |
29 |
Some scheduling problems with deteriorating jobs and learning effects
|
Cheng, T.C.E. |
|
2008 |
54 |
4 |
p. 972-982 11 p. |
artikel |
30 |
Univariate modeling and forecasting of monthly energy demand time series using abductive and neural networks
|
Abdel-Aal, R.E. |
|
2008 |
54 |
4 |
p. 903-917 15 p. |
artikel |
31 |
Volume Contents
|
|
|
2008 |
54 |
4 |
p. 1091-1094 4 p. |
artikel |