no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A genetic algorithm for solving the two-dimensional assortment problem
|
Lin, Chang-Chun |
|
2006 |
50 |
1-2 |
p. 175-184 10 p. |
article |
2 |
A learning algorithm based estimation method for maintenance cost of product concepts
|
Seo, Kwang-Kyu |
|
2006 |
50 |
1-2 |
p. 66-75 10 p. |
article |
3 |
A multi-mode resource-constrained scheduling problem in the context of port operations
|
Lorenzoni, Luciano Lessa |
|
2006 |
50 |
1-2 |
p. 55-65 11 p. |
article |
4 |
A review of optimization techniques in metal cutting processes
|
Mukherjee, Indrajit |
|
2006 |
50 |
1-2 |
p. 15-34 20 p. |
article |
5 |
A simulated annealing approach to a bi-criteria sequencing problem in a two-stage supply chain
|
Mansouri, S. Afshin |
|
2006 |
50 |
1-2 |
p. 105-119 15 p. |
article |
6 |
Block approach—tabu search algorithm for single machine total weighted tardiness problem
|
Bożejko, Wojciech |
|
2006 |
50 |
1-2 |
p. 1-14 14 p. |
article |
7 |
Call for Papers
|
|
|
2006 |
50 |
1-2 |
p. I-II nvt p. |
article |
8 |
Design of hierarchical fuzzy model for classification problem using GAs
|
Guo, Nai Ren |
|
2006 |
50 |
1-2 |
p. 90-104 15 p. |
article |
9 |
Evaluation of connection types in design for disassembly (DFD) using analytic network process
|
Güngör, Aşkıner |
|
2006 |
50 |
1-2 |
p. 35-54 20 p. |
article |
10 |
Forward recursive scheme with improved marginal analysis heuristic for machine expansion scheduling in a new job shop
|
Huang, Ming-Guan |
|
2006 |
50 |
1-2 |
p. 148-160 13 p. |
article |
11 |
Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry
|
Silva, Cristovao |
|
2006 |
50 |
1-2 |
p. 76-89 14 p. |
article |
12 |
Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks
|
Yildirim, Mehmet Bayram |
|
2006 |
50 |
1-2 |
p. 185-194 10 p. |
article |
13 |
Optimal determination of warranty region for 2D policy: A customers' perspective
|
Manna, D.K. |
|
2006 |
50 |
1-2 |
p. 161-174 14 p. |
article |
14 |
Pre 1 Editorial Board
|
|
|
2006 |
50 |
1-2 |
p. i- 1 p. |
article |
15 |
Reliability of grid service systems
|
Dai, Y.S. |
|
2006 |
50 |
1-2 |
p. 130-147 18 p. |
article |
16 |
Simple algorithms for updating multi-resource allocations in an unreliable flow network
|
Hsieh, Chung-Chi |
|
2006 |
50 |
1-2 |
p. 120-129 10 p. |
article |