nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comparison of solution procedures for two-machine flow shop scheduling with late work criterion
|
Blazewicz, Jacek |
|
2005 |
49 |
4 |
p. 611-624 14 p. |
artikel |
2 |
A distributed time-driven simulation method for enabling real-time manufacturing shop floor control
|
Cho, Sohyung |
|
2005 |
49 |
4 |
p. 572-590 19 p. |
artikel |
3 |
A stochastic model for the analysis of a two-machine flexible manufacturing cell
|
Aldaihani, Majid M. |
|
2005 |
49 |
4 |
p. 600-610 11 p. |
artikel |
4 |
Author Index
|
|
|
2005 |
49 |
4 |
p. 632- 1 p. |
artikel |
5 |
Bayesian judgment of a dichotomous inspection system when the true state of an evaluated item is unknown
|
Quinino, Roberto da Costa |
|
2005 |
49 |
4 |
p. 591-599 9 p. |
artikel |
6 |
Design of practical optimum JIT systems by integration of computer simulation and analysis of variance
|
Azadeh, A. |
|
2005 |
49 |
4 |
p. 504-519 16 p. |
artikel |
7 |
Minimizing makespan in a two-stage system with flowshop and open shop
|
Su, Ling-Huey |
|
2005 |
49 |
4 |
p. 520-536 17 p. |
artikel |
8 |
Optimization of a multi-response problem in Taguchi's dynamic system
|
Hsieh, Kun-Lin |
|
2005 |
49 |
4 |
p. 556-571 16 p. |
artikel |
9 |
Pre 1 Editorial Board
|
|
|
2005 |
49 |
4 |
p. i- 1 p. |
artikel |
10 |
Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
|
Thiagarajan, S. |
|
2005 |
49 |
4 |
p. 463-503 41 p. |
artikel |
11 |
Selecting the best statistical distribution—a comment and a suggestion on multi-criterion evaluation
|
Ramanathan, Ramakrishnan |
|
2005 |
49 |
4 |
p. 625-628 4 p. |
artikel |
12 |
State space representation of routing flexibility
|
Rosa Rohde, Leonardo |
|
2005 |
49 |
4 |
p. 537-555 19 p. |
artikel |
13 |
Volume Contents
|
|
|
2005 |
49 |
4 |
p. 629-631 3 p. |
artikel |