nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A control chart pattern recognition system using a statistical correlation coefficient method
|
Yang, Jenn-Hwai |
|
2005 |
48 |
2 |
p. 205-221 17 p. |
artikel |
2 |
Analyzing alternatives in reverse logistics for end-of-life computers: ANP and balanced scorecard approach
|
Ravi, V. |
|
2005 |
48 |
2 |
p. 327-356 30 p. |
artikel |
3 |
An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
|
Xia, Weijun |
|
2005 |
48 |
2 |
p. 409-425 17 p. |
artikel |
4 |
An evolutionary algorithm to solve the joint replenishment problem using direct grouping
|
Olsen, Anne L. |
|
2005 |
48 |
2 |
p. 223-235 13 p. |
artikel |
5 |
Approximating feeder line reliability statistics with partial data collection in assembly systems
|
Li, Jingshan |
|
2005 |
48 |
2 |
p. 181-203 23 p. |
artikel |
6 |
College basketball scheduling with travel swings
|
Voorhis, Tim Van |
|
2005 |
48 |
2 |
p. 163-172 10 p. |
artikel |
7 |
Computer-assisted supply chain configuration based on supply chain operations reference (SCOR) model
|
Huang, Samuel H. |
|
2005 |
48 |
2 |
p. 377-394 18 p. |
artikel |
8 |
Erratum to “Integrated production-inventory models for imperfect production process under inspection schedules” [Computers and Industrial Engineering 44 (2003) 633–650]
|
Lin, Chen-Sin |
|
2005 |
48 |
2 |
p. 443- 1 p. |
artikel |
9 |
Erratum to “Optimal manufacturing batch size with rework process at a single-stage production system” [Comput. Ind. Eng. 47 (1) (2004) 77–89]
|
Jamal, A.M.M. |
|
2005 |
48 |
2 |
p. 445- 1 p. |
artikel |
10 |
Evolutionary algorithm for advanced process planning and scheduling in a multi-plant
|
Moon, Chiung |
|
2005 |
48 |
2 |
p. 311-325 15 p. |
artikel |
11 |
Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time
|
Valente, Jorge M.S. |
|
2005 |
48 |
2 |
p. 363-375 13 p. |
artikel |
12 |
Flow shop vs. permutation shop with time delays
|
Rebaine, D. |
|
2005 |
48 |
2 |
p. 357-362 6 p. |
artikel |
13 |
Group decision making to better respond customer needs in software development
|
Büyüközkan, Gülçin |
|
2005 |
48 |
2 |
p. 427-441 15 p. |
artikel |
14 |
Multi-server retrial model with variable number of active servers
|
Artalejo, J.R. |
|
2005 |
48 |
2 |
p. 273-288 16 p. |
artikel |
15 |
One-class support vector machines—an application in machine fault detection and classification
|
Shin, Hyun Joon |
|
2005 |
48 |
2 |
p. 395-408 14 p. |
artikel |
16 |
Performance evaluation of heterogeneous wireless local area networks
|
David Porter, J. |
|
2005 |
48 |
2 |
p. 251-271 21 p. |
artikel |
17 |
Pre 1 Editorial Board
|
|
|
2005 |
48 |
2 |
p. i- 1 p. |
artikel |
18 |
Robust design modeling and optimization with unbalanced data
|
Cho, Byung Rae |
|
2005 |
48 |
2 |
p. 173-180 8 p. |
artikel |
19 |
Sensitivity of multi-criteria decision making to linguistic quantifiers and aggregation means
|
Ben-Arieh, David |
|
2005 |
48 |
2 |
p. 289-309 21 p. |
artikel |
20 |
Shipment partitioning and routing to minimize makespan in a transportation network
|
Kunnathur, Anand S. |
|
2005 |
48 |
2 |
p. 237-250 14 p. |
artikel |
21 |
Single machine stochastic scheduling to minimize the expected number of tardy jobs using mathematical programming models
|
Seo, Dong K. |
|
2005 |
48 |
2 |
p. 153-161 9 p. |
artikel |