Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             21 results found
no title author magazine year volume issue page(s) type
1 A control chart pattern recognition system using a statistical correlation coefficient method Yang, Jenn-Hwai
2005
48 2 p. 205-221
17 p.
article
2 Analyzing alternatives in reverse logistics for end-of-life computers: ANP and balanced scorecard approach Ravi, V.
2005
48 2 p. 327-356
30 p.
article
3 An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems Xia, Weijun
2005
48 2 p. 409-425
17 p.
article
4 An evolutionary algorithm to solve the joint replenishment problem using direct grouping Olsen, Anne L.
2005
48 2 p. 223-235
13 p.
article
5 Approximating feeder line reliability statistics with partial data collection in assembly systems Li, Jingshan
2005
48 2 p. 181-203
23 p.
article
6 College basketball scheduling with travel swings Voorhis, Tim Van
2005
48 2 p. 163-172
10 p.
article
7 Computer-assisted supply chain configuration based on supply chain operations reference (SCOR) model Huang, Samuel H.
2005
48 2 p. 377-394
18 p.
article
8 Erratum to “Integrated production-inventory models for imperfect production process under inspection schedules” [Computers and Industrial Engineering 44 (2003) 633–650] Lin, Chen-Sin
2005
48 2 p. 443-
1 p.
article
9 Erratum to “Optimal manufacturing batch size with rework process at a single-stage production system” [Comput. Ind. Eng. 47 (1) (2004) 77–89] Jamal, A.M.M.
2005
48 2 p. 445-
1 p.
article
10 Evolutionary algorithm for advanced process planning and scheduling in a multi-plant Moon, Chiung
2005
48 2 p. 311-325
15 p.
article
11 Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time Valente, Jorge M.S.
2005
48 2 p. 363-375
13 p.
article
12 Flow shop vs. permutation shop with time delays Rebaine, D.
2005
48 2 p. 357-362
6 p.
article
13 Group decision making to better respond customer needs in software development Büyüközkan, Gülçin
2005
48 2 p. 427-441
15 p.
article
14 Multi-server retrial model with variable number of active servers Artalejo, J.R.
2005
48 2 p. 273-288
16 p.
article
15 One-class support vector machines—an application in machine fault detection and classification Shin, Hyun Joon
2005
48 2 p. 395-408
14 p.
article
16 Performance evaluation of heterogeneous wireless local area networks David Porter, J.
2005
48 2 p. 251-271
21 p.
article
17 Pre 1 Editorial Board 2005
48 2 p. i-
1 p.
article
18 Robust design modeling and optimization with unbalanced data Cho, Byung Rae
2005
48 2 p. 173-180
8 p.
article
19 Sensitivity of multi-criteria decision making to linguistic quantifiers and aggregation means Ben-Arieh, David
2005
48 2 p. 289-309
21 p.
article
20 Shipment partitioning and routing to minimize makespan in a transportation network Kunnathur, Anand S.
2005
48 2 p. 237-250
14 p.
article
21 Single machine stochastic scheduling to minimize the expected number of tardy jobs using mathematical programming models Seo, Dong K.
2005
48 2 p. 153-161
9 p.
article
                             21 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands