no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A genetic algorithm for facility layout problems of different manufacturing environments
|
El-Baz, M. Adel |
|
2004 |
47 |
2-3 |
p. 233-246 14 p. |
article |
2 |
A multi-criterion evaluation approach to selection of the best statistical distribution
|
Wang, Yiqiang |
|
2004 |
47 |
2-3 |
p. 165-180 16 p. |
article |
3 |
An evolutionary algorithm for manufacturing cell formation
|
Gonçalves, José Fernando |
|
2004 |
47 |
2-3 |
p. 247-273 27 p. |
article |
4 |
Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time
|
Shyu, S.J. |
|
2004 |
47 |
2-3 |
p. 181-193 13 p. |
article |
5 |
Artificial neural networks to classify mean shifts from multivariate χ 2 chart signals
|
Chen, Long-Hui |
|
2004 |
47 |
2-3 |
p. 195-205 11 p. |
article |
6 |
Combining economic and social goals in the design of production systems by using ergonomics standards
|
Dul, Jan |
|
2004 |
47 |
2-3 |
p. 207-222 16 p. |
article |
7 |
Earliness/tardiness scheduling with a common due date and family setups
|
Suriyaarachchi, Rasika H. |
|
2004 |
47 |
2-3 |
p. 275-288 14 p. |
article |
8 |
Ergonomics, and occupational health and safety in the oil industry: a managers' response
|
Shikdar, Ashraf A. |
|
2004 |
47 |
2-3 |
p. 223-232 10 p. |
article |
9 |
Erratum to “Recognition of control chart patterns using multi-resolution wavelets analysis and neural networks” [Computers & Industrial Engineering 47 (2004) 17–29]
|
Al-Assaf, Yousef |
|
2004 |
47 |
2-3 |
p. 313- 1 p. |
article |
10 |
Fuzzy multiple objective programming framework to prioritize design requirements in quality function deployment
|
Karsak, E. Ertugrul |
|
2004 |
47 |
2-3 |
p. 149-163 15 p. |
article |
11 |
Minimizing total flow time in single machine environment with release time: an experimental analysis
|
Guo, Y. |
|
2004 |
47 |
2-3 |
p. 123-140 18 p. |
article |
12 |
Pre 1 Editorial Board
|
|
|
2004 |
47 |
2-3 |
p. i- 1 p. |
article |
13 |
The optimal policy for a sampling plan in continuous production in terms of the clearance number
|
Haji, Alireza |
|
2004 |
47 |
2-3 |
p. 141-147 7 p. |
article |
14 |
The virtual company: a re-configurable open shell for problem-based learning in industrial engineering
|
Lau, H.Y.K. |
|
2004 |
47 |
2-3 |
p. 289-312 24 p. |
article |
15 |
Using the FDH formulation of DEA to evaluate a multi-criteria problem in parallel machine scheduling
|
Ruiz-Torres, Alex J. |
|
2004 |
47 |
2-3 |
p. 107-121 15 p. |
article |