nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A method for multiple attribute decision-making with the fuzzy preference relation on alternatives
|
Fan, Zhi-Ping |
|
2004 |
46 |
2 |
p. 321-327 7 p. |
artikel |
2 |
An integrated agent-based approach for responsive control of manufacturing resources
|
Lim, M.K |
|
2004 |
46 |
2 |
p. 221-232 12 p. |
artikel |
3 |
An operator load-balancing problem in a semi-automatic parallel machine shop
|
Moon, Dug Hee |
|
2004 |
46 |
2 |
p. 355-362 8 p. |
artikel |
4 |
An optimization method for integrating two kinds of preference information in group decision-making
|
Fan, Zhi-Ping |
|
2004 |
46 |
2 |
p. 329-335 7 p. |
artikel |
5 |
A performance estimation model for AS/RS by M/G/1 queuing system
|
Hur, Sun |
|
2004 |
46 |
2 |
p. 233-241 9 p. |
artikel |
6 |
Application of VaR methodology to risk management in the stock market in China
|
Fan, Ying |
|
2004 |
46 |
2 |
p. 383-388 6 p. |
artikel |
7 |
A simulation optimization based control policy for failure prone one-machine, two-product manufacturing systems
|
Kenne, J.P. |
|
2004 |
46 |
2 |
p. 285-292 8 p. |
artikel |
8 |
A stochastic set-covering location model for both ameliorating and deteriorating items
|
Hwang, Heung-Suk |
|
2004 |
46 |
2 |
p. 313-319 7 p. |
artikel |
9 |
A vision-based system for automatic growing ring detection and measurement
|
Vaz, C. |
|
2004 |
46 |
2 |
p. 347-354 8 p. |
artikel |
10 |
Editorial Board
|
|
|
2004 |
46 |
2 |
p. i- 1 p. |
artikel |
11 |
Estimating design effort for GE hydro projects
|
Bashir, Hamdi A. |
|
2004 |
46 |
2 |
p. 195-204 10 p. |
artikel |
12 |
Foreword
|
Xu, Wei-Xuan |
|
2004 |
46 |
2 |
p. 193- 1 p. |
artikel |
13 |
Heuristic transporter routing model for manufacturing facility design
|
Hwang, Heung-Suk |
|
2004 |
46 |
2 |
p. 243-251 9 p. |
artikel |
14 |
Impact of forecasting error on the performance of capacitated multi-item production systems
|
Xie, Jinxing |
|
2004 |
46 |
2 |
p. 205-219 15 p. |
artikel |
15 |
Mathematical model for the optimization of the allocation of nonferrous raw materials in China
|
Wei, Yi-Ming |
|
2004 |
46 |
2 |
p. 293-303 11 p. |
artikel |
16 |
Model and algorithm of an inventory problem with the consideration of transportation cost
|
Zhao, Qiu-Hong |
|
2004 |
46 |
2 |
p. 389-397 9 p. |
artikel |
17 |
Modeling and simulation of product's surface design
|
Wenfeng, Li |
|
2004 |
46 |
2 |
p. 267-273 7 p. |
artikel |
18 |
Modeling integrated CAPP/PPS systems
|
Min, Liu |
|
2004 |
46 |
2 |
p. 275-283 9 p. |
artikel |
19 |
Multi-level redundancy optimization in series systems
|
Yun, Won Young |
|
2004 |
46 |
2 |
p. 337-346 10 p. |
artikel |
20 |
Multiple objective-integrated methodology of global optimum decision-making on mineral resources exploitation
|
Xu, Wei-Xuan |
|
2004 |
46 |
2 |
p. 363-372 10 p. |
artikel |
21 |
Operator-scheduling using a constraint satisfaction technique in port container terminals
|
Kim, Kap Hwan |
|
2004 |
46 |
2 |
p. 373-381 9 p. |
artikel |
22 |
Performance analysis of assembly systems with highlift stations: a practical approach
|
Leung, John |
|
2004 |
46 |
2 |
p. 305-311 7 p. |
artikel |
23 |
The impacts of acceleration/deceleration on travel time models for carousel systems
|
Hwang, Hark |
|
2004 |
46 |
2 |
p. 253-265 13 p. |
artikel |