nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Activity time–cost tradeoffs under time and cost chance constraints
|
Laslo, Zohar |
|
2003 |
44 |
3 |
p. 365-384 20 p. |
artikel |
2 |
A hybrid two-stage flowshop with limited waiting time constraints
|
Su, Ling-Huey |
|
2003 |
44 |
3 |
p. 409-424 16 p. |
artikel |
3 |
Decomposition of interdependent task group for concurrent engineering☆
|
Chen, Shi-Jie (Gary) |
|
2003 |
44 |
3 |
p. 435-459 25 p. |
artikel |
4 |
Editorial Board
|
|
|
2003 |
44 |
3 |
p. i- 1 p. |
artikel |
5 |
Estimating operation times from machine center arrival and departure events☆
|
Rossetti, Manuel D. |
|
2003 |
44 |
3 |
p. 493-514 22 p. |
artikel |
6 |
Evolutionary approaches to the design and organization of manufacturing systems
|
Pierreval, H. |
|
2003 |
44 |
3 |
p. 339-364 26 p. |
artikel |
7 |
Flexible 4-day workweek scheduling with weekend work frequency constraints
|
Alfares, Hesham K |
|
2003 |
44 |
3 |
p. 325-338 14 p. |
artikel |
8 |
Scheduling of drilling operations in printed circuit board factory☆
|
Hsieh, Jih-Chang |
|
2003 |
44 |
3 |
p. 461-473 13 p. |
artikel |
9 |
Solving large-scale requirements planning problems with component substitution options
|
Geunes, Joseph |
|
2003 |
44 |
3 |
p. 475-491 17 p. |
artikel |
10 |
Statistical tolerancing using designed experiments in a noisy environment
|
Köksal, Gülser |
|
2003 |
44 |
3 |
p. 515-526 12 p. |
artikel |
11 |
Three stage no-idle flow-shops
|
Saadani, Nour El Houda |
|
2003 |
44 |
3 |
p. 425-434 10 p. |
artikel |
12 |
Using novelty detection to identify abnormalities caused by mean shifts in bivariate processes
|
Zorriassatine, F. |
|
2003 |
44 |
3 |
p. 385-408 24 p. |
artikel |