no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A new lower bound for the flow shop group scheduling problem
|
Schaller, Jeffrey |
|
2001 |
41 |
2 |
p. 151-161 11 p. |
article |
2 |
An integrated MRP and JIT framework
|
Ho, Johnny C. |
|
2001 |
41 |
2 |
p. 173-185 13 p. |
article |
3 |
An investigation of the sensitivity of DEA to data errors
|
Metters, Richard D. |
|
2001 |
41 |
2 |
p. 163-171 9 p. |
article |
4 |
A parallel algorithm for the dynamic lot-sizing problem
|
Lyu Jr., Jr Jung |
|
2001 |
41 |
2 |
p. 127-134 8 p. |
article |
5 |
Machine cell formation in generalized group technology
|
Adenso-Dı́az, Belarmino |
|
2001 |
41 |
2 |
p. 227-240 14 p. |
article |
6 |
Process analysis and reengineering
|
Zakarian, Armen |
|
2001 |
41 |
2 |
p. 135-150 16 p. |
article |
7 |
Real-time control/scheduling for multi-purpose batch plants
|
Castillo, Ignacio |
|
2001 |
41 |
2 |
p. 211-225 15 p. |
article |
8 |
The evaluation of drop shipping option for e-commerce retailers
|
Khouja, Moutaz |
|
2001 |
41 |
2 |
p. 109-126 18 p. |
article |
9 |
The role of product safety and liability in concurrent engineering
|
Dowlatshahi, S |
|
2001 |
41 |
2 |
p. 187-209 23 p. |
article |